STAR ENERGY (KAKAP) LTD.

JOB NO

DOC. NO.

REV.

9444

KRA-2X - A - 05 - R- 7504

DATE :

TRIPATRA SARKU
CONSORTIUM

TECHNICAL BID ANALYSIS

4 JAN. 2006

SHEET

PREPD

HAN

CHKD

FHW

APPD

REF

OF

TECHNICAL BID ANALYSIS FOR


FLANGES

KRA SOUTH GAS DEVELOPMENT


SUBSEA TIE-IN PROJECT
ENG 0137

17 Jan 06

All

Approved for Construction

01

4 Jan 06

All

Issued for Review and Approval

REV

DATE

PAGES

DECRIPTION

HAN

FHW

REF

RAB

PREPD

CHKD

APPD

COMPANY

KRA South Gas Development Subsea Tie-in

STAR ENERGY (Kakap) Ltd.

TECHNICAL BID ANALYSIS


TRIPATRA - SARKU CONSORTIUM
Project

: KRA South Gas Development Subsea Tie-in

Doc. No

: KRA-2X-A-05-R-7504

Job. No

: 9444

Rev

:A

Client

: STAR ENERGY (Kakap) Ltd.

Date

: 17 January 2006

Subject

: TBA for Flanges

Item

: 3 of 3

NO

COMPONENT

PT. MITRA PFP UTAMA

REQUIREMENT

Quote
III.
1
2
2
2
4
5
6
7

BETA INTERNATIONAL, INC


Quote

Compliance

REMARKS

Compliance

BLIND FLANGE
Size
Type of Flange
Quantity
Code
Flange Rating
Flange Face
Groove Number
OD of Flange

NPS 6 Inch
Blind Flange
1
EA
ANSI 16.5
ANSI 1500#
Ring Joint
R-46
15.5
Inch

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

Comply
Comply
Comply
Comply
Comply
Comply
Comply
Comply

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

Comply
Comply
Comply
Comply
Comply
Comply
Comply
Comply

8
9
10
11
12
13
14
15
16
17
18

Material
Maximum Carbon
Carbon Equivalent
Pcm
Yield Strength
Tensile Strength
Hardness
NACE MR-0175
Heat Treatment
Welding End
Surface Finish

MSS SP-44 F-65


0.23
0.42
Max
0.24
Max
Min 65,000 Psi
Min 77,000 Psi
Max 22 Rc
None
Normalized
Bevelled to ASME B31.8
250 micron RMS (ASME B46.1)

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

Comply
Comply
Comply
Comply
Comply
Comply
Comply
Comply
Comply
Comply
Comply

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

Comply
Comply
Comply
Comply
Comply
Comply
Comply
Comply
Comply
Comply
Comply

19
20
21
22

Origin
Manufacturer
Detail Drawing
Product Datasheet

Italy
Galperti
N/A
N/A

Acceptable
Acceptable
Acceptable
Acceptable

Italy
Galperti
N/A
N/A

Acceptable
Acceptable
Acceptable
Acceptable

23

Delivery Time

14 weeks after
approved drawing

Acceptable

3 Weeks

Acceptable

TRIPATRA - SARKU CONSORTIUM


File : R-7504-A. TBA Flanges Form.xls

Page 5 of 6

KRA South Gas Development Subsea Tie-in

STAR ENERGY (Kakap) Ltd.

TECHNICAL BID ANALYSIS


TRIPATRA - SARKU CONSORTIUM
Project

: KRA South Gas Development Subsea Tie-in

Doc. No

: KRA-2X-A-05-R-7504

Job. No

: 9444

Rev

:A

Client

: STAR ENERGY (Kakap) Ltd.

Date

: 17 January 2006

Subject

: TBA for Flanges

Item

: 3 of 3

NO

COMPONENT

REQUIREMENT

PT. MITRA PFP UTAMA


Quote

III.

BLIND FLANGE

24

Delivery Point

25
26
27

EVALUATION RESULT
Schedule
Technical
Recommendation

TRIPATRA - SARKU CONSORTIUM


File : R-7504-A. TBA Flanges Form.xls

Batam Port / Singapore

Singapore

Compliance

Acceptable

Acceptable
Acceptable
Can be selected

BETA INTERNATIONAL, INC


Quote

Singapore

REMARKS

Compliance

Acceptable

Acceptable
Acceptable
Can be selected

Page 6 of 6