Anti Bouyancy Analisys with Concrete Weight C

Project
Location

:
:

Trial No.

Acceptance Criteria (120%)

120%

#DIV/0!

#DIV/0!

tconc (concrete thickness) (m)

0.4

0.05

0.05

L2 (concrete length) (m)

14

30

40

L1 (pipe length include 3LPE


length) (m)

29

-30

-40

Ltotal (total length) (m)

43

Water density (kg/m3)

1000

Pipe density (kg/m3)

7850

3LPE density (kg/m3)

940

Concrete density (kg/m3)

2400

Methane density (kg/m3)

0.656

D0 (OD pipe) (m)

0.1143

D1 (ID pipe) (m)

0.102

D2 [OD pipe + (2xthick 3LPE)]


(m)

0.409

D3 [OD pipe + (2xthick 3LPE) +


(2xthick concrete)] (m)

0.509

Pipe Weight (kg)

704.9679936075

3LPE Weight (kg)

4893.243597347

Concrete Weight (kg)

2421.3168

total displaced water weight


(kg)

6655.452155

Remarks

minimum
requirement

Prepared by : Dhika K

Approved by :

Weight Coating Requirement

#DIV/0!

#DIV/0!

#DIV/0!

0.15

0.15

0.15

25

30

40

-25

-30

-40

Date :

Revision :

Trial No.
Bouyancy
Total weight component
weight submerged
density drum (HDPE)

10761.455 10761.455 10761.455 10761.455


0

-10761.455 -10761.455 -10761.455 -10761.455


0.96

0.96

0.96

0.96

0.2

0.2

0.2

0.2

total weight with drum

180

bouyancy per drum

200

200

200

200

volume drum
weight of drum

bouyancy needed
number of drum
total bouyancy of drum

-10581.455 -10761.455 -10761.455 -10761.455


20

4000

total bouyancy

14761.455 10761.455 10761.455 10761.455

Checking (must > 100%)

8200.81%

#DIV/0!

#DIV/0!

#DIV/0!

5
10761.455
0
-10761.455
0.96
0.2
9
0
200
-10761.455
0
0
10761.455
#DIV/0!