PROTECTION & INTERLOCK PROTOCOL Unit-2

DRG:
SYSTEM: LP HEATER Date: / /

LPH-1 COND I/L ISO VALVE-CDV28 (LCA60AA001)


S/
LOGIC DESCRIPTION REMARKS TAG STATUS METHOD
N

LOGIC FOR AUTO OPEN:

LPH-1 SERVICE SEO ORDER ON(STEP-01) LCA60AA001


LPH-1 COND I/L ISO VALVE OPENED
LCA70AA001
AND
LPH-1 COND O/L ISO VALVE OPENED
1 1.5SEC PULSE
AND
LPH-1 A/B LEVEL NOT HIGH

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
1
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /

S/N LOGIC DESCRIPTION REMARKS TAG STATUS METHOD

LOGIC FOR PERMISSIVE OPEN:


LCC12CL011/012
1 LPH-1A/1B LEVEL NOT HIGH LCC11CL011/012

LOGIC FOR PROTECTION CLOSE :

LPH-1A/B LEVEL V.HI LCC12CL011/012


LCC11CL011/012
AND
1 10SEC DELAY
LPH-1 BYP VALVE (CDV-30) NOT LCA61AA001
CLOSED

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
2
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /

S/N DESCRIPTION REMARK TAG STATUS METHOD

LOGIC FOR PERMISSIVE CLOSE:


LCA61AA001
1 LPH-1 BYP VALVE(CDV-30) OPENED

S/N LOGIC DESCRIPTION REMARKS TAG STATUS METHOD

LOGIC FOR AUTO CLOSE:

LPH-1 COND I/L ISO VALVE CLOSED LCA60AA001


AND
LPH-1 COND O/L ISO VALVE CLOSED LCA70AA001
1 1.5 SEC PULSE
AND
LPH-1 A/B LEVEL NOT HIGH

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
3
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /
LPH-1 COND O/L ISO VALVE-CDV29 (LCA70AA001)
S/
LOGIC DESCRIPTION REMARKS TAG STATUS METHOD
N

LOGIC FOR AUTO OPEN:

LPH-1 SERVICE SEQ ORDER ON(STEP-01) LCA60AA001


LPH-1 COND I/L ISO VALVE OPENED
LCA70AA001
AND
LPH-1 COND O/L ISO VALVE OPENED
1 1.5SEC PULSE
AND
LPH-1 A/B LEVEL NOT HIGH

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
4
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /

S/N LOGIC DESCRIPTION REMARKS TAG STATUS METHOD

LOGIC FOR PERMISSIVE OPEN:


LCC12CL011/012
1 LPH-1A/1B LEVEL NOT HIGH LCC11CL011/012

LOGIC FOR PROTECTION CLOSE :

LPH-1A/B LEVEL V.HI LCC12CL011/012


LCC11CL011/012
AND
1 10SEC DELAY
LPH-1 BYP VALVE (CDV-30) NOT LCA61AA001
CLOSED

S/N DESCRIPTION REMARK TAG STATUS METHOD

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
5
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /
LOGIC FOR PERMISSIVE CLOSE:
LCA61AA001
1 LPH-1 BYP VALVE(CDV-30) OPENED

S/N LOGIC DESCRIPTION REMARKS TAG STATUS METHOD

LOGIC FOR AUTO CLOSE:

LPH-1 COND I/L ISO VALVE CLOSED LCA60AA001


AND
LPH-1 COND O/L ISO VALVE CLOSED LCA70AA001
1 1.5 SEC PULSE
AND
LPH-1 A/B LEVEL NOT HIGH

LPH-1 COND I/L ISO VALVE-CDV30 (LCA61AA001)


VERIFIED & CERTIFIED BY
DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
6
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /
S/
LOGIC DESCRIPTION REMARKS TAG STATUS METHOD
N

LOGIC FOR AUTO OPEN:

LPH-1 SERVICE SEQ ORDER ON(STEP-51)


1 LPH-1 COND BYB VALVE OPEN 1.5SEC PULSE LCA61AA001

S/N LOGIC DESCRIPTION REMARKS TAG STATUS METHOD

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
7
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /

LOGIC FOR PROTECTION OPEN :

LCC12CL011/012
1 LPH-1A/1B LEVEL V. HIGH LCC11CL011/012

S/N DESCRIPTION REMARK TAG STATUS METHOD

LOGIC FOR PERMISSIVE CLOSE:


LPH-1 COND I/L ISO VALVE(CDV-28) LCA60AA001
OPENED
AND LCA70AA001
1
LPH-1 COND O/L ISO VALVE(CDV-29)
OPENED

S/N LOGIC DESCRIPTION STATUS METHOD


REMARKS TAG

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
8
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /

LOGIC FOR AUTO CLOSE:

LPH-1 COND I/L ISO VALVE(CDV-28) LCA60AA001


OPENED
AND 1.5 SEC PULSE,
1 LCA70AA001
LPH-1 COND O/L ISO VALVE(CDV-29) TIME DELAY 2S
OPENED

LCA61AA001
2 LPH-1 BYPASS VALVE (CDV-30)CLOSE 1.5 SEC PULSE

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
9
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /
LPH-2 COND I/L ISO VALVE-CDV31 (LCA70AA002)
S/
LOGIC DESCRIPTION REMARKS TAG STATUS METHOD
N

LOGIC FOR AUTO OPEN:

LPH-2 SERVICE SEQ ORDER ON(STEP-02) LCA70AA002


LPH-2 COND I/L ISO VALVE(CDV31) OPENED
1 AND 1.5SEC PULSE
LCA80AA002
LPH-2 COND O/L ISO VALVE(CDV32) OPENED

S/N LOGIC DESCRIPTION REMARKS TAG STATUS METHOD

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
10
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /
LOGIC FOR PERMISSIVE OPEN:
LCC21CL011
1 LPH-2 LEVEL NOT HIGH LCC21CL012
LCC22CL011

LOGIC FOR PROTECTION CLOSE :

LPH-2 LEVEL V.HI LCA71AA051


AND
1 10SEC DELAY
LPH-2 COND BYP VALVE (CDV-33)
OPENED

S/N DESCRIPTION REMARK TAG STATUS METHOD

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
11
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /
LOGIC FOR PERMISSIVE CLOSE:
LCA71AA051
1 LPH-2 COND BYP VALVE(CDV-33) OPENED

S/N LOGIC DESCRIPTION REMARKS TAG STATUS METHOD

LOGIC FOR AUTO CLOSE:

LPH-2 SERVICE SEQ ORDER ON(STEP- LCA70AA002


53)
LPH-2 COND I/L ISO VALVE(CDV31) CLS LCA80AA002
1 1.5 SEC PULSE
AND
LPH-2 COND O/L ISO VALVE(CDV32)CLS

LPH-2 COND O/L ISO VALVE-CDV32 (LCA90AA002)


S/
LOGIC DESCRIPTION REMARKS TAG STATUS METHOD
N
VERIFIED & CERTIFIED BY
DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
12
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /

LOGIC FOR AUTO OPEN:

(LPH-2 SERVICE SEQ ORDER ON(STEP-02) LCA70AA002


LPH-2 COND I/L ISO VALVE(CDV31) OPENED
1 AND 1.5SEC PULSE
LCA80AA001
LPH-2 COND O/L ISO VALVE(CDV32) OPENED

S/N LOGIC DESCRIPTION REMARKS TAG STATUS METHOD

LOGIC FOR PERMISSIVE OPEN:

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
13
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /
LCC21CL011
1 LPH-2 LEVEL NOT HIGH LCC21CL012
LCC22CL011

LOGIC FOR PROTECTION CLOSE :

LPH-2 LEVEL V.HI


AND
1 10SEC DELAY
LPH-2 COND BYP VALVE (CDV-33) LCA71AA051
OPENED

S/N DESCRIPTION REMARK TAG STATUS METHOD

LOGIC FOR PERMISSIVE CLOSE:


LPH-2 COND BYP VALVE(CDV-33) LCA71AA051
1
OPENED
VERIFIED & CERTIFIED BY
DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
14
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /

S/N LOGIC DESCRIPTION REMARKS TAG STATUS METHOD

LOGIC FOR AUTO CLOSE:

LPH-2 SERVICE SEQ ORDER LCA70AA002


ON(STEP-53)
LPH-2 COND I/L ISO VALVE(CDV31) LCA80AA001
CLOSED
1 1.5 SEC PULSE
AND
LPH-2 COND O/L ISO VALVE(CDV32)
CLOSED

LPH-2 COND BYPASS VALVE-CDV33 (LCA71AA051)


S/
LOGIC DESCRIPTION REMARKS TAG STATUS METHOD
N

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
15
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /

LOGIC FOR AUTO OPEN:

LPH-2 SERVICE SEQ ORDER ON(STEP-52) LCA71AA051


LPH-2 COND BYP VALVE(CDV-33)OPENED
AND
LCJ21AA101
1 LPH-2 ALT DRN CV(DRV-37) MAX 1.5SEC PULSE
AND LCJ30AA101
LPH-3 NRML DRN CV(DRV-28) MIN

S/N LOGIC DESCRIPTION REMARKS TAG STATUS METHOD

LOGIC FOR PROTECTION OPEN :

LCC21CL011
1 LPH-2 LEVEL V. HIGH LCC21CL012
LCC22CL011

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
16
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /

S/N DESCRIPTION REMARK TAG STATUS METHOD

LOGIC FOR PERMISSIVE CLOSE:


LPH-2 COND I/L ISO VALVE(CDV-31) LCA70AA002
OPENED
AND LCA80AA001
1
LPH-2 COND O/L ISO VALVE(CDV-32)
OPENED

S/N LOGIC DESCRIPTION REMARKS TAG STATUS METHOD

LOGIC FOR AUTO CLOSE:

1 LPH-2 COND I/L ISO VALVE(CDV-31) 1.5 SEC PULSE, LCA70AA001


OPENED TIME DELAY 2S
AND
LCA80AA001
LPH-2 COND O/L ISO VALVE(CDV-
32) OPENED
VERIFIED & CERTIFIED BY
DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
17
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /

(STEP03) LCA71AA051
LPH-2 BYPASS VALVE (CDV-
33)CLOSE
2 AND 1.5 SEC PULSE
LPH-2 LEVEL NOT HIGH
AND
TURBINE NOT TRIPPED

LPH-3 COND I/L ISO VALVE-CDV34 (LCA80AA002)


S/
LOGIC DESCRIPTION REMARKS TAG STATUS METHOD
N

LOGIC FOR AUTO OPEN:

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
18
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /

LPH-3 SERVICE SEQ ORDER ON(STEP-02)


LPH-3 COND I/L ISO VALVE (CDV-34) LCA80AA002
OPENED
1 1.5SEC PULSE
AND
LPH-3 COND O/L ISO VALVE (CDV-35)
LCA90AA002
OPENED

S/N LOGIC DESCRIPTION REMARKS TAG STATUS METHOD

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
19
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /
LOGIC FOR PERMISSIVE OPEN:
LCC31CL011
1 LPH-3 LEVEL NOT HIGH LCC31CL012
LCC32CL011

LOGIC FOR PROTECTION CLOSE :

LPH-3 LEVEL V.HI LCA81AA051


AND
1 10SEC DELAY
LPH-3 COND BYP VALVE (CDV-36)
OPENED

S/N LOGIC DESCRIPTION REMARKS TAG STATUS METHOD

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
20
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /

LOGIC FOR PERMISSIVE CLOSE:

LPH-3 COND BYP VALVE(CDV-36) LCA81AA051


1 OPENED

S/N LOGIC DESCRIPTION REMARKS TAG STATUS METHOD

LOGIC FOR AUTO CLOSE:

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
21
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /
LPH-3 SERVICE SEQ ORDER
ON(STEP-53)
LPH-3 COND I/L ISO VALVE (CDV- LCA80AA002
34)CLOSED
1 1.5 SEC PULSE
AND
LCA90AA002
LPH-3 COND O/L ISO VALVE (CDV-
35)CLOSED

LPH-3 COND O/L ISO VALVE-CDV35 (LCA90AA002)


S/
LOGIC DESCRIPTION REMARKS TAG STATUS METHOD
N

LOGIC FOR AUTO OPEN:

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
22
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /
LPH-3 SERVICE SEQ ORDER ON(STEP-02)
LPH-3 COND I/L ISO VALVE (CDV-34)
OPENED LCA80AA002
1 AND 1.5SEC PULSE
LPH-3 COND O/L ISO VALVE (CDV-35)
OPENED
LCA90AA002

S/N LOGIC DESCRIPTION REMARKS TAG STATUS METHOD

LOGIC FOR PERMISSIVE OPEN:

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
23
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /
LCC31CL011
1 LPH-3 LEVEL NOT HIGH LCC31CL012
LCC32CL011

LOGIC FOR PROTECTION CLOSE :

LPH-3 LEVEL V.HI LCA81AA051


AND
1 10SEC DELAY
LPH-3 COND BYP VALVE (CDV-36)
OPENED

S/N LOGIC DESCRIPTION REMARKS TAG STATUS METHOD

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
24
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /

LOGIC FOR PERMISSIVE CLOSE:

LPH-3 COND BYP VALVE(CDV-36) LCA81AA051


1 OPENED

S/N LOGIC DESCRIPTION REMARKS TAG STATUS METHOD

LOGIC FOR AUTO CLOSE:

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
25
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /
LPH-3 SERVICE SEQ ORDER
ON(STEP-53)
LPH-3 COND I/L ISO VALVE (CDV- LCA80AA002
34)CLOSED
1 1.5 SEC PULSE
AND
LCA90AA002
LPH-3 COND O/L ISO VALVE (CDV-
35)CLOSED

LPH-3 COND BYPASS VALVE-CDV36 (LCA81AA051)


S/ LOGIC DESCRIPTION STATUS METHOD
N REMARKS TAG
VERIFIED & CERTIFIED BY
DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
26
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /

LOGIC FOR AUTO OPEN:

LPH-3 SERVICE SEQ ORDER ON(STEP-52) LCA81AA051


LPH-3 COND BYP VALVE (CDV-36) OPENED
1 1.5SEC PULSE
AND LCJ31AA101
LPH-3 ALT DRN CV(DRV-31) MAX

S/N LOGIC DESCRIPTION REMARKS TAG STATUS METHOD


VERIFIED & CERTIFIED BY
DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
27
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /

LOGIC FOR PROTECTION OPEN :

LCC31CL011
1 LPH-3 LEVEL V. HIGH LCC31CL012
LCC32CL011

S/N DESCRIPTION REMARK TAG STATUS METHOD

LOGIC FOR PERMISSIVE CLOSE:


LPH-3 COND I/L ISO VALVE(CDV-34) LCA80AA002
OPENED
AND LCA90AA001
1
LPH-3 COND O/L ISO VALVE(CDV-35)
OPENED

S/N LOGIC DESCRIPTION REMARKS TAG STATUS METHOD

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
28
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /

LOGIC FOR AUTO CLOSE:

LPH-3 COND I/L ISO VALVE(CDV-34) LCA80AA001


OPENED
AND 1.5 SEC PULSE,
1 LCA90AA001
LPH-3 COND O/L ISO VALVE(CDV- TIME DELAY 2S
35) OPENED

(STEP03) LCA81AA001
LPH-3 BYPASS VALVE (CDV-
36)CLOSE
2 AND 1.5 SEC PULSE
LPH-3 LEVEL NOT HIGH
AND
TURBINE NOT TRIPPED

LPH-2 EXT STM ISO VALVE-EXV11 (LBS21AA003)

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
29
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /
S/
LOGIC DESCRIPTION REMARKS TAG STATUS METHOD
N

LOGIC FOR AUTO OPEN:

LPH-2 SERVICE SEQ ORDER ON(STEP-0 LBS21AA003


1 LPH-2 EXT STM ISO 1.5SEC PULSE
VALVE(EXV11)OPENED

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
30
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /
S/N LOGIC DESCRIPTION REMARKS TAG STATUS METHOD

LOGIC FOR PERMISSIVE OPEN:


LPH-2 LEVEL NOT HIGH LCC21CL011
LCC21CL012
AND
LCC22CL011
TURBINE NOT TRIPPED
AND
LPH-2 COND I/L ISO VALVE(CDV-31)
1 LCA70AA002
OPENED
LCA80AA001
AND
LPH-2 COND O/L ISO VALVE(CDV-32)
OPENED

LOGIC FOR PROTECTION CLOSE :

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
31
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /

1 LPH-2 LEVEL V.HI

2 TURBINE TRIPPED

LPH-2 COND I/L ISO VALVE(CDV-31) LCA70AA002


3 NOT OPENED

LPH-2 COND IOL ISO VALVE(CDV-32) LCA80AA001


4 NOT OPENED

LPH-2 COND BYP VALVE(CDV-33) NOT LCA71AA051


5 CLOSED

S/N LOGIC DESCRIPTION REMARKS TAG STATUS METHOD

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
32
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /

LOGIC FOR AUTO CLOSE:

LPH-3 SERVICE SEQ ORDER


LBS21AA003
ON(STEP-51)
LPH-2 EXT STM ISO VALVE(EXV-
11)CLOSED
1 AND 1.5 SEC PULSE LCM40AA004
LPH-2 EXT STM DRN VALVE(EXV-
119) OPENED

LPH-2 EXT STM DRN VALVE-EXV119 (LCM40AA004)


S/ LOGIC DESCRIPTION STATUS METHOD
N REMARKS TAG
VERIFIED & CERTIFIED BY
DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
33
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /

LOGIC FOR AUTO OPEN:

(STEP-01)LPH-2 EXT STM DRAIN


1 1.5SEC PULSE
VALVE(EXV-119)OPEN

(STEP-51) LPH-2 EXT STM ISO VALVE(EXV- LBS21AA003


11)CLOSED
LCM40AA004
2 AND 1.5SEC PULSE
LPH-2 EXT STM DRAIN VALVE(EXV-
119)OPENED
LBS21AA003
LPH-2 EXT STM ISO VALVE(EXV-
3
11)CLOSED

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
34
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /

LOGIC FOR PROTECTION OPEN :

1 LPH-2 LEVEL V.HI

2 TURBINE TRIPPED

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
35
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /

S/N LOGIC DESCRIPTION REMARKS TAG STATUS METHOD

LOGIC FOR AUTO CLOSE:

(STEP-05)
LCM40AA004
LPH-2 EXT STM DRN VALVE(EXV-
1 119) CLOSED 1.5 SEC PULSE

LBS21AA003
LPH-2 EXT STM ISO VALVE(EXV-
2 1.5 SEC PULSE
11)OPENED

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
36
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /
LPH-3 EXT STM ISO VALVE-EXV12 (LBS31AA003)
S/
LOGIC DESCRIPTION REMARKS TAG STATUS METHOD
N

LOGIC FOR AUTO OPEN:

LPH-3 SERVICE SEQ ORDER ON(STEP-04 LBS31AA003


1 LPH-3 EXT STM ISO 1.5SEC PULSE
VALVE(EXV12)OPENED

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
37
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /
S/N LOGIC DESCRIPTION REMARKS TAG STATUS METHOD

LOGIC FOR PERMISSIVE OPEN:


LPH-3 LEVEL NOT HIGH LCC31CL011
LCC31CL012
AND
LCC32CL011
TURBINE NOT TRIPPED
AND
LPH-3 COND I/L ISO VALVE(CDV-34)
1 LCA80AA002
OPENED
LCA90AA002
AND
LPH-3 COND O/L ISO VALVE(CDV-35)
OPENED

LOGIC FOR PROTECTION CLOSE :

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
38
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /

1 LPH-3 LEVEL V.HI

2 TURBINE TRIPPED

LPH-3 COND I/L ISO VALVE(CDV-34) LCA70AA002


3 NOT OPENED

LPH-3 COND IOL ISO VALVE(CDV-35) LCA80AA001


4 NOT OPENED

LPH-3 COND BYP VALVE(CDV-36) NOT LCA81AA051


5 CLOSED

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
39
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /

S/N LOGIC DESCRIPTION REMARKS TAG STATUS METHOD

LOGIC FOR AUTO CLOSE:

LPH-3 SERVICE SEQ ORDER


LBS31AA003
ON(STEP-51)
LPH-3 EXT STM ISO VALVE(EXV-
12)CLOSED
1 AND 1.5 SEC PULSE LCM40AA003
LPH-3 EXT STM DRN VALVE(EXV-
118) OPENED

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
40
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /

LPH-3 EXT STM DRN VALVE-EXV118 (LCM40AA003)


S/
LOGIC DESCRIPTION REMARKS TAG STATUS METHOD
N

LOGIC FOR AUTO OPEN:

(STEP-01)LPH-3 EXT STM DRAIN


1 1.5SEC PULSE
VALVE(EXV-118)OPEN

(STEP-51) LPH-3 EXT STM ISO VALVE(EXV- LBS31AA003


12)CLOSED
LCM40AA003
2 AND 1.5SEC PULSE
LPH-2 EXT STM DRAIN VALVE(EXV-
118)OPENED
LBS31AA003
LPH-3 EXT STM ISO VALVE(EXV-
3 1.5SEC PULSE
12)CLOSED

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
41
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /

LOGIC FOR PROTECTION OPEN :

LCC31CL011
1 LPH-3 LEVEL V.HI LCC31CL012
LCC32CL011

2 TURBINE TRIPPED

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
42
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /

S/N LOGIC DESCRIPTION REMARKS TAG STATUS METHOD

LOGIC FOR AUTO CLOSE:

(STEP-05)
LCM40AA003
LPH-3 EXT STM DRN VALVE(EXV-
1 118) CLOSED 1.5 SEC PULSE

LBS31AA003
LPH-2 EXT STM ISO VALVE(EXV-
2 1.5 SEC PULSE
12)OPENED

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
43
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
44
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /

VERIFIED & CERTIFIED BY


DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
45
PROTECTION & INTERLOCK PROTOCOL Unit-2
DRG:
SYSTEM: LP HEATER Date: / /

A
VERIFIED & CERTIFIED BY
DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS
46