DRG:
SYSTEM: LP HEATER Date: / /
LCC12CL011/012
1 LPH-1A/1B LEVEL V. HIGH LCC11CL011/012
LCA61AA001
2 LPH-1 BYPASS VALVE (CDV-30)CLOSE 1.5 SEC PULSE
LCC21CL011
1 LPH-2 LEVEL V. HIGH LCC21CL012
LCC22CL011
(STEP03) LCA71AA051
LPH-2 BYPASS VALVE (CDV-
33)CLOSE
2 AND 1.5 SEC PULSE
LPH-2 LEVEL NOT HIGH
AND
TURBINE NOT TRIPPED
LCC31CL011
1 LPH-3 LEVEL V. HIGH LCC31CL012
LCC32CL011
(STEP03) LCA81AA001
LPH-3 BYPASS VALVE (CDV-
36)CLOSE
2 AND 1.5 SEC PULSE
LPH-3 LEVEL NOT HIGH
AND
TURBINE NOT TRIPPED
2 TURBINE TRIPPED
2 TURBINE TRIPPED
(STEP-05)
LCM40AA004
LPH-2 EXT STM DRN VALVE(EXV-
1 119) CLOSED 1.5 SEC PULSE
LBS21AA003
LPH-2 EXT STM ISO VALVE(EXV-
2 1.5 SEC PULSE
11)OPENED
2 TURBINE TRIPPED
LCC31CL011
1 LPH-3 LEVEL V.HI LCC31CL012
LCC32CL011
2 TURBINE TRIPPED
(STEP-05)
LCM40AA003
LPH-3 EXT STM DRN VALVE(EXV-
1 118) CLOSED 1.5 SEC PULSE
LBS31AA003
LPH-2 EXT STM ISO VALVE(EXV-
2 1.5 SEC PULSE
12)OPENED
A
VERIFIED & CERTIFIED BY
DEPARTMENT JPL BHEL
MECH COMMG (TURBINE)
C&I (COMMISSIONING)
C&I(ERRECTION)
OPERATIONS