Protection, Control & Instrumentation

Transmission

Isolation List for Protection, Control and Instrumentation Works

Substation Sejingkat 132/33KV Substation

Bay Involved
 80MVA Transformer 2
Panel Involved  80MVA Transformer 2 (HV Side)
 80MVA Transformer 2 (LV Side)
Work Description 1. To carry out protection relay routine maintenance works
 Relay setting check
 Relay function test and contact timing operating test
 Relay DC supply check
 Record the test result
2. Check all relay outputs are unlatched after testing
Started Date for Isolation
26th June 2023
Finished Date for Isolation
27th June 2023
TPC&I Authorised Personnel
Anthony Ak Behos
TPC&I Competence Personnel
Dennis Kon
Supervisor in Charge
Eric Ha Chung Zheng

Prepared by Checked By

Eric Ha Chung Zheng Anthony Ak Behos/Dennis Kon


TPC&I EE TPC&I STA/
Date: 8/6/2023 Date: 8/6/2023
Approved by

Yeo Lip Ming


TPC&I covering Senior Manager
Date: 8/6/2023

1|Page
Protection, Control & Instrumentation
Transmission

Isolation List for Protection, Control and Instrumentation Works

Substation Sejingkat 132kV Substation

Bay Involved 80MVA 132/33kV Transformer 2

Panel Involved 80MVA 132/33kV Transformer 2 (HV & LV Relay panel)

HV Side: Panel 02
1. Biased Differential Relay 7SR2422
2. OC Relay MCGG 62
3. Earth Fault Relay MCGG 22
4. HV REF MCAG 14
5. LV REF MCAG 14
6. Transformer Guard Relay VAA 121
7. Circuit Breaker Failure Current Unit 1 & 2
MCTI 39
Protection Relay & Type Relay
8. Circuit Breaker Failure Timer 1 & 2 MVTT 14
9. Lockout 1 & 2 Relay MVAJ 25
LV Side: NA
1. Directional Relay METI 31
2. OCEF Relay MCGG 82
3. Standby Earth Fault Relay MCGG 22
4. SBEF Stage 1 & 2 Timer MVTT 14
5. Lockout Relay MVAJ 25

Updated Date 21st January 2021

2|Page
Protection, Control & Instrumentation
Transmission
1.0 80MVA 132/33kV Transformer 2
1.1 (HV Side Relay Panel)
a) Isolation List
Step Panel Description Isolation Point Isolated Remarks
132/33kV Isolate CBF to initiate BBP at terminal:
Transformer 2 PAC:61 [P121]
CBF To Initiate BBP
1. (HV Side
Main Panel (R1)
PAC:62 [P129]
Relay Panel) PAC:63 [P108]
PAC:64 [P124]
Isolate CBF to initiate BBP at terminal:
PAC:71 [P221]
CBF To Initiate BBP
2. Duplicate Panel (R2)
PAC:72 [P229]
PAC:73 [P208]
PAC:74 [P224]
3. Defeat CBF Timer 1 & 2
By withdraw CBF Timer 1
4. By withdraw CBF Timer 2
Isolate trip circuit 1 to trip CB at terminal:
5. Trip Circuit 1
PAC:42 [K113(T)] – Trip Coil 1
Isolate trip circuit 2 to trip CB at terminal:
6. Trip Circuit 2
PAC:47 [K213(T)] – Trip Coil 2
Isolate Trip Link

7. Lockout Relay 1  LK 1: LO 1 to Trip Coil 1


Isolate Terminal Link
PAC: 96 [K83/132] – LO 1 to Intertrip 33KV
Isolate Trip Link

8. Lockout Relay 2  LK 5: LO 2 to Trip Coil 2


Isolate Terminal Link
PAC: 96 [K83/132] – LO 2 to Intertrip 33KV
9. CBF Protection 1 Relay By withdraw CBF Protection 1 relay

10. CBF Protection 2 Relay By withdraw CBF Protection 2 relay

Biased Differential Isolate Trip Link


11. Protection Relay 
LK 3: Biased Diff. trip to initiate LO 1
12. 3 Phase OC Protection Relay Isolate Trip Link

3|Page
Protection, Control & Instrumentation
Transmission

 LK 9: OC trip to initiate LO 2
Isolate Trip Link:
13. EF Protection Relay
 LK 10: Trans. E/F trip to initiate LO 2
Isolate Trip Link
 LK 4: (MT Buchholz oil surge trip, OLTC Oil
14. Transformer Guard Relay Surge Trip, ET Common Trip) to initiate LO 1
 LK 11: (Oil/Winding Temp. Trip, Main Tank
Pressure Relief Trip) to initiate LO 2
Isolate Trip Link:
15. HV REF Protection Relay
 LK 7: HV REF trip to initiate LO 2
Isolate Trip Link:
16. LV REF Protection Relay
 LK 8: LV REF trip to initiate LO 2
Short CT at Terminal: PAD: 1[A11] RØ
2[A31] YØ
17. Biased Diff. CT (HV)
3[A51] BØ
4[A70] N
Short CT at Terminal: PAD: 20[A111] RØ
21[A131] YØ
18. Biased Diff. CT (LV)
22[A151] BØ
23[A177] N
Short CT at Terminal: PAD: 18[A71] NCT CT sharing with
19. HV REF CT
19[A70] Bias Diff.
Short CT at Terminal: PAD: 26[A177] CT sharing with
20. LV REF CT
27[A174] Bias Diff.
Short CT at Terminal: PAD: 15[C171]
21. EF CT
16[C170]
Short CT at Terminal: PAD: 6[C11] RØ
7[C31] YØ
22. OC CT
8[C51] BØ
9[C70] N
Isolated by TPC&I Authorised Personnel
Checked and Agreed by Competent Personnel

4|Page
Protection, Control & Instrumentation
Transmission

b) Normalization List
Step Panel Description Normalize Point Normalized Remarks
132/33kV Normalize CT at Terminal: PAD: 1[A11] RØ
Transformer 2 2[A31] YØ
1. (HV Side
Biased Diff. CT (HV)
3[A51] BØ
Relay Panel) 4[A70] N
Normalize CT at Terminal: PAD: 20[A111] RØ
21[A131] YØ
2. Biased Diff. CT (LV)
22[A151] BØ
23[A177] N
Normalize CT at Terminal: PAD: 18 [A71] CT sharing with
3. HV REF CT
19 [A70] NCT Bias Diff.
Normalize CT at Terminal: PAD: 26[A177] CT sharing with
4. LV REF CT
27[A174] Bias Diff.
Normalize CT at Terminal: PAD: 15[C171]
5. EF CT
16[C170]
Normalize CT at Terminal: PAD: 6[C11] RØ
7[C31] YØ
6. OC CT
8[C51] BØ
9[C70] N
7. CBF Protection 1 Relay Normalize/Insert back CBF Protection 1 relay

8. CBF Protection 2 Relay Normalize/Insert back CBF Protection 2 relay


Normalize Trip Link
9. Biased Protection Relay
 LK 3: Biased Diff. trip to initiate LO 1
Normalize Trip Link
10. 3 Phase OC Protection Relay
 LK 9: OC trip to initiate LO 2
Normalize Trip Link:
11. EF Protection Relay
 LK 10: Trans. E/F trip to initiate LO 2
12. Transformer Guard Normalize Trip Link
5|Page
Protection, Control & Instrumentation
Transmission

 LK 4: (MT Buchholz oil surge trip, OLTC Oil


Surge Trip, ET Buchholz Trip) to initiate LO 1
Protection Relay
 LK 11: (Oil/Winding Temp. Trip, Main Tank
Pressure Relief Trip) to initiate LO 2
Normalize Trip Link:
13. HV REF Protection Relay
 LK 7: HV REF trip to initiate LO 2
Normalize Trip Link:
14. LV REF Protection Relay
 LK 8: LV REF trip to initiate LO 2
Normalize Trip Link

15. Lockout Relay 1  LK 1: LO 1 to Trip Coil 1


Normalize Terminal Link
PAC: 96 [K83/132] – LO 1 to Intertrip 33KV
Normalize Trip Link

16. Lockout Relay 2  LK 5: LO 2 to Trip Coil 2


Normalize Terminal Link
PAC: 96 [K83/132] – LO 2 to Intertrip 33KV
Normalize trip circuit 1 to trip CB at terminal:
17. Trip Circuit 1
PAC: 42 [K113(T)] – Trip Coil 1
132/33kV Normalize trip circuit 2 to trip CB at terminal:
18. Transformer 2 Trip Circuit 2
PAC: 47 [K213(T)] – Trip Coil 2
(HV Side
19. Relay Panel) CBF Timer 1 & 2
By insert/put back CBF Timer 1
20. By insert/put back CBF Timer 2
By normalize CBF to initiate BBP at terminal:
PAC:61 [P121]
CBF To Initiate BBP
21. Main Panel (R1)
PAC:62 [P129]
PAC:63 [P108]
PAC:64 [P124]
By normalize CBF to initiate BBP at terminal:
PAC:71 [P221]
CBF To Initiate BBP
22. Duplicate Panel (R2)
PAC:72 [P229]
PAC:73 [P208]
PAC:74 [P224]

Normalized by TPC&I Authorised Personnel

6|Page
Protection, Control & Instrumentation
Transmission
Checked and Agreed by Competent Personnel

REMARKS:
 If there are any changes in isolation, get prior approval before proceeding from Sr. Manager TPC&I

1.2 (LV Side Relay Panel)


a) Isolation List
Step Panel Description Isolation Point Isolated Remarks
132/33kV Isolate CBF tripping signal
Transformer 2
(LV Side
 PAC: 36 [P127]
1. Relay Panel) CBF Protection Relay  PAC: 37 [P101]
 PAC: 38 [P102]
 PAC: 39 [P108]
2. Defeat CBF Timer Withdraw CBF Timer
Isolate trip circuit to trip CB at terminal:
3. Trip Circuit
PAC: 28 [K3(T)] – Trip Coil
4. CBF Relay Withdraw CBF relay
Isolate Trip Link:
5. Lockout Relay
 LK 1: LO to Trip Coil
6. Directional Protection Relay
(METI31)
Isolate Trip Link:
 LK 4: DOC to trip LO
 LK 5: DEF to trip LO

7|Page
Protection, Control & Instrumentation
Transmission
Isolate Trip Link:

7. 3 PH Overcurrent Relay  LK 4: DOC to trip LO


 LK 5: DEF to trip LO
Isolate Trip Link:

SBEF & SBEF Timer 1 & 2  LK 6: SBEF Stage 2 to trip LO


8. Protection Relay Isolate Terminal Link
PAA: 7 [K1] & 8 [K97/T2]: SBEF Stage 1 to trip
Bus Coupler
Short CT at Terminal: PAD: 1[C11] RØ
3[C31] YØ
9. DOCEF CT
5[C51] BØ
7[C70] N
Open VT at Terminal: PAD: 13[E12] RØ
10. DOCEF VT 14[E32] YØ
15[E52] BØ
Short CT at Terminal: PAD: 10[C171]
11. Standby EF CT
11[C170]
Isolated by TPC&I Authorised Personnel
Checked and Agreed by Competent Personnel

b) Normalization List
Step Panel Description Normalize Point Normalized Remarks
132/33kV Normalize CT at Terminal: PAD: 1[C11] RØ
Transformer 2 3[C31] YØ
1. (LV Side
DOCEF CT
5[C51] BØ
Relay Panel) 7[C70] N
Normalize VT at Terminal: PAD: 13[E12] RØ
2. DOCEF VT 14[E32] YØ
15[E52] BØ
3. Standby EF CT Normalize CT at Terminal: PAD: 10[C171]
11[C170]
8|Page
Protection, Control & Instrumentation
Transmission
Normalize Trip Link:

4. Directional Protection Relay  LK 4: DOC to trip LO


(METI31)
 LK 5: DEF to trip LO
Normalize Trip Link:

5. 3 PH Overcurrent Relay  LK 4: DOC to trip LO


 LK 5: DEF to trip LO
Normalize Trip Link:

SBEF & SBEF Timer 1 & 2  LK 6: SBEF Stage 2 to trip LO


6. Protection Relay Normalize Terminal Link
PAA: 7 [K1] & 8 [K97/T2]: SBEF Stage 1 to trip
Bus Coupler
Normalize Trip Link:
7. Lockout Relay
 LK 1: LO to Trip Coil
8. CBF Protection Relay Normalize/Insert back CBF relay
Normalize trip circuit to trip CB at terminal:
9. Trip Circuit
PAC:28 [K3(T)] – Trip Coil
10. CBF Timer Normalize/Insert back CBF Timer
Normalize CBF tripping signal
 PAC: 36 [P127]
11. CBF To Initiate BBP  PAC: 37 [P101]
 PAC: 38 [P102]
 PAC: 39 [P108]
Normalized by TPC&I Authorised Personnel
Checked and Agreed by Competent Personnel
REMARKS:
 If there are any changes in isolation, get prior approval before proceeding from Sr. Manager TPC&I