Bay Involved
80MVA Transformer 2
Panel Involved 80MVA Transformer 2 (HV Side)
80MVA Transformer 2 (LV Side)
Work Description 1. To carry out protection relay routine maintenance works
Relay setting check
Relay function test and contact timing operating test
Relay DC supply check
Record the test result
2. Check all relay outputs are unlatched after testing
Started Date for Isolation
26th June 2023
Finished Date for Isolation
27th June 2023
TPC&I Authorised Personnel
Anthony Ak Behos
TPC&I Competence Personnel
Dennis Kon
Supervisor in Charge
Eric Ha Chung Zheng
Prepared by Checked By
1|Page
Protection, Control & Instrumentation
Transmission
HV Side: Panel 02
1. Biased Differential Relay 7SR2422
2. OC Relay MCGG 62
3. Earth Fault Relay MCGG 22
4. HV REF MCAG 14
5. LV REF MCAG 14
6. Transformer Guard Relay VAA 121
7. Circuit Breaker Failure Current Unit 1 & 2
MCTI 39
Protection Relay & Type Relay
8. Circuit Breaker Failure Timer 1 & 2 MVTT 14
9. Lockout 1 & 2 Relay MVAJ 25
LV Side: NA
1. Directional Relay METI 31
2. OCEF Relay MCGG 82
3. Standby Earth Fault Relay MCGG 22
4. SBEF Stage 1 & 2 Timer MVTT 14
5. Lockout Relay MVAJ 25
2|Page
Protection, Control & Instrumentation
Transmission
1.0 80MVA 132/33kV Transformer 2
1.1 (HV Side Relay Panel)
a) Isolation List
Step Panel Description Isolation Point Isolated Remarks
132/33kV Isolate CBF to initiate BBP at terminal:
Transformer 2 PAC:61 [P121]
CBF To Initiate BBP
1. (HV Side
Main Panel (R1)
PAC:62 [P129]
Relay Panel) PAC:63 [P108]
PAC:64 [P124]
Isolate CBF to initiate BBP at terminal:
PAC:71 [P221]
CBF To Initiate BBP
2. Duplicate Panel (R2)
PAC:72 [P229]
PAC:73 [P208]
PAC:74 [P224]
3. Defeat CBF Timer 1 & 2
By withdraw CBF Timer 1
4. By withdraw CBF Timer 2
Isolate trip circuit 1 to trip CB at terminal:
5. Trip Circuit 1
PAC:42 [K113(T)] – Trip Coil 1
Isolate trip circuit 2 to trip CB at terminal:
6. Trip Circuit 2
PAC:47 [K213(T)] – Trip Coil 2
Isolate Trip Link
3|Page
Protection, Control & Instrumentation
Transmission
LK 9: OC trip to initiate LO 2
Isolate Trip Link:
13. EF Protection Relay
LK 10: Trans. E/F trip to initiate LO 2
Isolate Trip Link
LK 4: (MT Buchholz oil surge trip, OLTC Oil
14. Transformer Guard Relay Surge Trip, ET Common Trip) to initiate LO 1
LK 11: (Oil/Winding Temp. Trip, Main Tank
Pressure Relief Trip) to initiate LO 2
Isolate Trip Link:
15. HV REF Protection Relay
LK 7: HV REF trip to initiate LO 2
Isolate Trip Link:
16. LV REF Protection Relay
LK 8: LV REF trip to initiate LO 2
Short CT at Terminal: PAD: 1[A11] RØ
2[A31] YØ
17. Biased Diff. CT (HV)
3[A51] BØ
4[A70] N
Short CT at Terminal: PAD: 20[A111] RØ
21[A131] YØ
18. Biased Diff. CT (LV)
22[A151] BØ
23[A177] N
Short CT at Terminal: PAD: 18[A71] NCT CT sharing with
19. HV REF CT
19[A70] Bias Diff.
Short CT at Terminal: PAD: 26[A177] CT sharing with
20. LV REF CT
27[A174] Bias Diff.
Short CT at Terminal: PAD: 15[C171]
21. EF CT
16[C170]
Short CT at Terminal: PAD: 6[C11] RØ
7[C31] YØ
22. OC CT
8[C51] BØ
9[C70] N
Isolated by TPC&I Authorised Personnel
Checked and Agreed by Competent Personnel
4|Page
Protection, Control & Instrumentation
Transmission
b) Normalization List
Step Panel Description Normalize Point Normalized Remarks
132/33kV Normalize CT at Terminal: PAD: 1[A11] RØ
Transformer 2 2[A31] YØ
1. (HV Side
Biased Diff. CT (HV)
3[A51] BØ
Relay Panel) 4[A70] N
Normalize CT at Terminal: PAD: 20[A111] RØ
21[A131] YØ
2. Biased Diff. CT (LV)
22[A151] BØ
23[A177] N
Normalize CT at Terminal: PAD: 18 [A71] CT sharing with
3. HV REF CT
19 [A70] NCT Bias Diff.
Normalize CT at Terminal: PAD: 26[A177] CT sharing with
4. LV REF CT
27[A174] Bias Diff.
Normalize CT at Terminal: PAD: 15[C171]
5. EF CT
16[C170]
Normalize CT at Terminal: PAD: 6[C11] RØ
7[C31] YØ
6. OC CT
8[C51] BØ
9[C70] N
7. CBF Protection 1 Relay Normalize/Insert back CBF Protection 1 relay
6|Page
Protection, Control & Instrumentation
Transmission
Checked and Agreed by Competent Personnel
REMARKS:
If there are any changes in isolation, get prior approval before proceeding from Sr. Manager TPC&I
7|Page
Protection, Control & Instrumentation
Transmission
Isolate Trip Link:
b) Normalization List
Step Panel Description Normalize Point Normalized Remarks
132/33kV Normalize CT at Terminal: PAD: 1[C11] RØ
Transformer 2 3[C31] YØ
1. (LV Side
DOCEF CT
5[C51] BØ
Relay Panel) 7[C70] N
Normalize VT at Terminal: PAD: 13[E12] RØ
2. DOCEF VT 14[E32] YØ
15[E52] BØ
3. Standby EF CT Normalize CT at Terminal: PAD: 10[C171]
11[C170]
8|Page
Protection, Control & Instrumentation
Transmission
Normalize Trip Link:
9|Page