SOP No. JOB DESCRIPTION
N BY
1.1 Preface:
=> In normal operation LPG sphere 41-V-001A is designated
for receiving Mixed butane R/D from CHU, feeding to NCU ,
road tanker loading and transferring materials to propane-
LPG sphere (43-V-002A/B) for propane LPG batch preparation.
=> C4-Raff sph.C (43-V-002C) is designated for receiving C4
Raff R/D from BDEU and feeding to CHU plant. In normal
operating condition the following lines will be blinded in the
sphere.
1. 12” suction of pump 43-P-002A/B/C.
2. 6” suction of pump 43-P-008A.
3. 6” min. cir. of pump 43-P-002A/B/C
4. 3” min. cir. of pump 43-P-008A.
C4 Raff sph. A and B are used as propane LPG spheres
in which propane R/D from NCU is received. And pump
43-P-002C is used for circulation and loading purpose.
Presently LPG vaporizer system has been
disconnected.
GENERAL :
Use PPE’s like Helmet, safety shoes, goggles, organic
vapor mask & hand gloves. Impart functional & safety
training for operational handling of LPG.
Care to be taken that anybody engaged and allowed to walk
or to climb or to work on heights / areas at sphere farm
should not be exposed to direct sunrays/ sun light for more
than 30 minutes.
ACTIO
SOP No. JOB DESCRIPTION
N BY
Mix butane produced in the CHU stored in this sphere. This
1.2 mixed butane is connected to the mixed butane transfer
pumps suction header and through which it is pumped to
loading gantry.
Mercaptan dosing facility available in this sphere but it is
done presently at gantry.
During normal operation the following lines will be in
isolated Condition.
Crude propane from NCU.
ACTIO
SOP No. JOB DESCRIPTION
N BY
11. Ensure that the following instruments are in line.
LT/ LI 1201/1202 on sphere A
LSHH- 1203 (in sphere A)
TT-1201 (in sphere A), TT-1203 (sphere inlet hdr), TG- PE & M
1201 (i/o line)
PT-1203 (sphere inlet header), PG-1201 (on sphere A)
FT-1203 (on sphere inlet header)
GE-1201 to 1208 at sphere b/l
PSHH-1401, FT-1401, GE-1401, GE-1402(for pump
A)/GE 1403(for pump B), LSLL-1401,PT-1402,PG-
1401/1402 (in gantry area)
12. Ensure that the following interlocks are checked and kept in
line:
I-121 (actuated by LSHH –1203)
I-122 (actuated by PSHH –1201) PE & M
I-131 (actuated by PSL –1301) and also take its deluge
valve in line
I-141 (actuated by LSLL –1401)
I-142 (actuated by PSHH –1401)
13. Ensure that the following TSV’s and PSV’s are in line and
also ensure that its I/Vs are in LO position.
TSV –1205 in 4” LPG from road tanker line.
PSV- 1201A on the top of the sphere 41-V-001A SIC&M
TSV-1201 in 10” sphere inlet header.
TSV-1401 in 4” unloading pump 41-P-010A discharge
line.
TSV –1206 (in 10” start up line from C4 –raff)
TSV-1204 (2” LPG line to vaporizer)
TSV-1210 (LPG transfer to NCU)
TSV-3211 (6” min circn header to LPG sphere)
PSV-1501/1502 (LPG vaporizer) & PSV-2701A (CFGD)
ACTIO
SOP No. JOB DESCRIPTION
N BY
Towards propylene unloading compressor line.
Towards propylene offspec unloading line.
6” line from Bay-3 to 41-P-010A in Bay-1.
Pump 41-P-010A by closing suction, discharge
and vent flare line valves.
3” crude propane from NCU line
10” start up LPG from C4 raff spheres.
Sampling point lines in sphere and gantry area.
6” Vapor return line from LPG sphere to Bay-1.
3” vapor line from Bay-1 to Bay-3
2” nitrogen line to tanker.
4” unloading pump discharge line to C4 Mix. sphere.
4” LPG start up line to C4-raff spheres.
6”vapour balance line to C4 raff sphere
3” vapor line for butene-1 vapor return to Bay-2.
3” liquid line from Bay-3 to 41-P-010A/B.
3” liquid line from Bay-2 and Bay-3 to 41-P-009A/B.
ACTIO
SOP No. JOB DESCRIPTION
N BY
pressure.
Slowly open the globe valve at pump discharge.
The LPG vapor shall start flowing to LPG sphere. M
Once the sphere pressure is 2-2.5 kg/cm 2g, closing M
pump discharge valve can stop unloading. PUMP IS
NOT TO BE OPERATED AT THIS STAGE. M
Start removing of inerts from sphere by using the sphere
PSV bypass and reduce the sphere pressure to 1.0 M
kg/cm2g.
Repeat the operation twice. With this nitrogen
concentration in the sphere would reduce considerably. PE & M
If possible check nitrogen concentration of sphere.
When next tanker is lined up, increase the system
pressure equal to tanker without operating the pump i.e. PE & M
transfer with pressure difference.
Now connect the vapor hose and open valve on vapor
balance line. M
Take PIC-1402 in auto mode and give set point of 10 to
12 kg/cm2g. Open the tanker vapor line and allow the
vapor to valance with sphere pressure. M
Prime the unloading pump. Check the line up of
secondary seal flushing. Start service water to seal pot. PE & M
Open discharge I/V 10% and start pump. Maintain a min
flow of 30 m3/hr. M
Check the total system for any leakage.
M
22. For subsequent operation following shall be done:
Connect the hose to the tanker vapor line.
Connect the hose to the tanker liquid line. M
Note down the sphere level and check line up to sphere. M
With pump suction and discharge valve closed open M
tanker liquid line. M
Open the unloading pump suction valve and prime the
pump. Open the pump discharge valve and allow the M
material to pass the material from tanker to sphere.
Open vapor balance line to sphere. M
Start the pump as per pump starting SOP.
Keep watch on pump discharge pressure, motor amps M
Doc No. Topic Prepared by Approved by Rev. No Page
SB/BKM RM 6
HPL/IMS/IOP/SOP/ LPG Storage &
8.5.1/41/LPG Transfer System
5 of 26
28/5/19
Standard Operating Procedures
Integrated Offsites & Utilities Plant (IOP)
ACTIO
SOP No. JOB DESCRIPTION
N BY
vibration & abnormal sound and the flow through the
1.3 pump.
Keep close watch on tanker level and tanker pressure. M
At low level reduce the transfer rate to facilitate complete M
liquid transfer. M
Stop and isolate the pump from both suction and
discharge side at tanker zero level.
Close tanker side I/Vs for both liquid and vapor line. M
De-pressurize the liquid and vapor hose to flare and M
isolate it.
Disconnect the vapor and liquid hose one by one. M
Disconnect tanker earth connection. M
Remove stopper and release the truck. M
M
UNLOADING OF LPG FROM TANKER TO C4 RAFF SPHERE:
Select the pump for unloading and also the sphere for filling.
Take electrical and mechanical clearance from respective M
dept. SIC&M
Keep the sphere and LPG pipelines under the positive N 2
pressure.
SIC
1. Pump to be used for unloading: 41-P-010B
2. Sphere to be charged up: 43-V-002B. SIC
3. Unloading bay used: Bay-1 SIC
4. Ensure the presence of following utilities line in the sphere SIC
b/l .
2” IA line.
2” AP line.
2” WS line.
2” N2 line.
Fire water loop and deluge system. M
5. Ensure that the following utility lines are there in the Loading
bay B/L. gantry area.
2” WS line
3” SL line
2” AP
2” N2
6. Ensure that the following instruments are in line.
Doc No. Topic Prepared by Approved by Rev. No Page
SB/BKM RM 6
HPL/IMS/IOP/SOP/ LPG Storage &
8.5.1/41/LPG Transfer System
6 of 26
28/5/19
Standard Operating Procedures
Integrated Offsites & Utilities Plant (IOP)
ACTIO
SOP No. JOB DESCRIPTION
N BY
LI-3202/3204 (Sphere B)
LSHH-3206 (Sphere B)
PT-3202/PG-3202 (Sphere B)
TG-3202 (Sphere B)
GE-3201 to 3212 & GE –4901 to 4906 (all GE’s in
sphere B/L) PE & M
PSHH – 1401, FT-1401, GE – 1401 LALL-1401 (in
Gantry area)
7. Ensure that the following interlocks are checked
I-322 (actuated by LSHH – 3206)
I-311/312/313 and take its deluge valve (actuated by
PSL-3101/3102/3103 respectively)
I-141 (actuated by LSLL- 1401)
I-142 (actuated by PSHH- 1401)
I-143 and take its deluge valve in line (actuated by PSL PE & M
–1403).
8. Ensure that the following TSV’s and PSV’s are in line and
also ensure that its I/V’s are in LO position
TSV –3202 in 6” sphere inlet line in which LPG for M
startup joins.
PSV-3202 A/B on the top of the sphere 43-V-002B..
9. Isolate and blind the following,
6” C4 raffinate from BDEU line at sphere B/L consulting
AU (SIC).No C4 Raffinate rundown can be received M
during unloading of LPG in C4 Raffinate spheres.
3” CHU de-inventory line.
4” unloading pump discharge line to C4 Mix sphere.
10.Open SDV-3202 and lineup its I/V in 12” sphere inlet line
11. Open I/V & de-blind the 6” vapor return line to gantry in both
sphere and unloading bay B/L SIC&M
10. Place tanker at the unloading bay and ensure proper M
earthing connection to the tanker.
11. Open the I/V and line up the 4” liquid line from gantry to C4 M
raffinate sphere B and in the sphere B/L.
12. De-pressurize the vapor unloading arm by opening ¾” line
to flare and then after isolating the flare line connect the arm PE&M
to the tanker vapor line. M
13. De-pressurize the liquid unloading arm by opening ¾” line to
Doc No. Topic Prepared by Approved by Rev. No Page
SB/BKM RM 6
HPL/IMS/IOP/SOP/ LPG Storage &
8.5.1/41/LPG Transfer System
7 of 26
28/5/19
Standard Operating Procedures
Integrated Offsites & Utilities Plant (IOP)
ACTIO
SOP No. JOB DESCRIPTION
N BY
flare and then after isolating the flare line connect the arm to M
the tanker liquid line.
14. By isolating PV-1402 and pump suction line, line up the M
level gauge with the tanker and check the level.
15. Take PIC-1402 in auto mode and give proper set point to it. M
Open the tanker vapor line and allow the vapor to balance
with sphere pressure.
16. Close pump suction and discharge valve and open tanker M
liquid line.
17. Crack open the unloading pump suction and its discharge
valve. PE&M
18. Balance the liquid line of sphere and tanker.
19. After liquid balance of sphere close the pump discharge PE
valve and start the pump according to the steps given in the M
pump start up SOP.
20. Keep close watch on pump discharge pressure, motor M
amps, and flow through the pump, vibration, abnormal
sound, leakage and TSV, PSV popping through out the M
1.4 system.
21. Keep close watch on tanker level and tanker pressure. At M
low level reduce the transfer rate to facilitate complete liquid
transfer. M
22. Stop and isolate the pump from both suction side and
discharge side at the tanker zero level, with adequate M
pressure in the tanker.
23. Isolate vapor and liquid hoses and tanker level gauge.
24. Depressurize the liquid and vapor hose to flare and isolate
it. M
25. Disconnect the vapor and liquid hose one by one.
26. Disconnect the tanker earth connection.
27. Allow the truck to move from the bay. M
M
M
TRANSFER OF LPG FROM C4 RAFFINATE SPHERE TO LPG
SPHERE:
Select the C4 raffinate sphere and the pumps to be used for
transfer.
Take electrical and mechanical clearance from respective M
Doc No. Topic Prepared by Approved by Rev. No Page
SB/BKM RM 6
HPL/IMS/IOP/SOP/ LPG Storage &
8.5.1/41/LPG Transfer System
8 of 26
28/5/19
Standard Operating Procedures
Integrated Offsites & Utilities Plant (IOP)
ACTIO
SOP No. JOB DESCRIPTION
N BY
dept.
SIC&M
1. Pump to be used for transfer: 43-P-002A
2. Sphere to be filled up : 41-V-001A.
3. Sphere from which transfer is to take place: 43-V-002B. SIC
4. Ensure the presence of following utilities line in the sphere SIC
B/L. SIC
2” IA line. SIC &M
2” AP line.
2” WS line.
2” N line.
Fire water loop and deluge system.
5. Ensure that the following instruments are in line.
LI-3202/3204 (Sphere B) SIC&M
LSHH-3206 (Sphere B)
PT-3202/PG-3202 (Sphere B)
TG-3202 (Sphere B)
GE-3201 to 3212 & GE –4901 to 4906 (all GE’s in
sphere B/L)
LT/ LI 1201/1202 on sphere A
LSHH- 1203 (in sphere A)
TT-1201(in sphere A), TT-1203(sphere inlet hdr), PE
PT-1203(sphere inlet hdr),
FT-1203 (on sphere inlet header)
GE-1201 to 1206 at sphere b/l
ACTIO
SOP No. JOB DESCRIPTION
N BY
PSV-3202 A/B on the top of the C4 raffinate sphere 43-
P_002B
TSV-3205 in 10” pump discharge header
PSV-1201 A/B on the top of the LPG sphere.
TSV – 1201 in LPG sphere inlet line.
8.Ensure that the following are isolated or blinded.
3” CHU de-inventory line to sphere 43-V-002B. SIC&M
3” mixed butane line from CHU to sphere 43-V-002B
6” C4 raffinate from BDEU to sphere B by closing SDV-
3202.
6” Sphere B suction line to 43-P-008A.
6” Sphere B suction line to 43-P-010A&B
4’’ min. circulation line downstream I/V’s of 43-P-008A
and 43-P-010A/B , .
12” line from sphere 41-V-001A to pump 43-P-002A/B/C. M
6’ min. circulation line of LPG.
12’ line from LPG sphere to 43-P-002A/B/C suction
headers, in LPG sphere B/L.
4’ LPG for start up line in C4 raffinate sphere B/L....
6” C4 raffinate vapor balance line from gantry.
3’ crude propane from NCU line in LPG spheres B/l.
4’ LPG road tanker to LPG sphere...
Sampling points of LPG and C4 raffinate spheres.
9.Open the C4 raff. Sphere I/O line to pump suction header of
43-P-002A/B.
1.5 10.Close FV-3201 fully by taking FIC –3201 in manual mode
and open the upstream and downstream I/V’s for FV-3201. M
5. Ensure that the 10” LPG line from C 4 raff. Sphere to LPG
sphere is being lined up through which transfer to take M
place.
6. Open the pump A(43-P-002A) suction valve. M
7. Prime the pump completely and start the pump as per the
pump start up SOP.
8. Once the system gets stabilized route the LPG-to-LPG M
sphere.
9. Take FIC-3201 in Auto mode. PE&M
10. Keep close watch on C4 raff sphere/LPG sphere level;
pump discharge pressure, motor amperage and vibration. M
Doc No. Topic Prepared by Approved by Rev. No Page
SB/BKM RM 6
HPL/IMS/IOP/SOP/ LPG Storage &
8.5.1/41/LPG Transfer System
10 of 26
28/5/19
Standard Operating Procedures
Integrated Offsites & Utilities Plant (IOP)
ACTIO
SOP No. JOB DESCRIPTION
N BY
11. Once the sphere gets emptied out stop the pump
12. Normalize the transfer system by closing 10” LPG transfer
valve from 43-P-002A/B discharge header at LPG B/L M
M
START-UP PROCEDURE OF LPG UNLOADING PUMPS 41-P-
010A/B M
ACTIO
SOP No. JOB DESCRIPTION
N BY
normal discharge pressure.
19. If the pump is not developing pressure stop the pump and M
prime it completely.
20. Close the vent valve and restart the pump.
21. Then follow the step-17 to 18. M
Close the pump suction and discharge side vent line.
22.Empty polymer drums of MEG handed over to Materials M
team,thereafter materials disposing these drum through auction M
as scrap. M
ACTIO
SOP No. JOB DESCRIPTION
N BY
I-121 (actuated by LSHH –1203)
I-122 (actuated by PSHH –1201)
I-131 (actuated by PSL –1301) and also take its
deluge valve in line
I-123/124 (actuated by 41-P-003A/B trips)
6. Ensure that the following TSV’s and PSV’s are in line and
also ensure that its I/Vs are in LO position
PSV –1203 in 4” LPG pump discharge header. PE
PSV- 1201A/B on the top of the sphere 41-V-001A.
ACTIO
SOP No. JOB DESCRIPTION
N BY
the FIC-1201 and change it to the auto mode and close FV- M
1201 bypass valve. M
15. Crack open the I/V in LPG to NCU line and ensure that LPG
is being drawn slowly and steadily.
16. Keep a close watch on pump discharge pressure, M
amperage, sphere level, LPG flow rate and pump vibration.
SIC&M
START-UP PROCEDURE OF LPG Transfer Pumps 41-P-003A/B
ACTIO
SOP No. JOB DESCRIPTION
N BY
Select the pump to be used for transfer.
Take the mechanical and electrical clearances for running M
the pump. PE & M
LPG vaporizer and CFGD is to be ready to receive LPG
liquid and vapor respectively.
1. Say pump 41-P-007 A to be used for transfer. M
2. Say sphere 41_P-001A from which LPG is to drawn out. SIC
3. Ensure the presence of following utilities in the sphere B/L SIC&M
as per process requirement. M
2” IA line
2” AP line
2” WS line
2” N line
Fire water header and deluge system.
4. Ensure that the following instruments in line.
LT-1201/1202(sphere A)
LSHH-1203 (sphere A)
TT-1201, TG-1201 (sphere A)
PG-1201 (sphere A) and PG-1204 ( pump 41-P-007A)
GE-1201 – 1207 (all GE’s in LPG sphere B/L)
5. Ensure that the following interlocks are checked SIC&M
I-121 (actuated by LSHH-1203)
I-131 (actuated by PSL-1301) and also take its Deluge
valve in line. SIC
6. Ensure that the following TSV’s and PSV’s are in line and
also ensure that its I/V’s are in LO position
PSV-1204 in 2” LPG pump discharge header.
PSV-1201 A/B on the top of the sphere 41-V-003A M &SIC
PSV-1202 in discharge line of the pump 41-P-007A
Isolate the following
Pump 41-P-007B by closing its suction and discharge
valves.
12” outlet line from the sphere 41-V-001A to mixed
butane loading pumps (43-P-003A/B/C)
Vapor return line for future connections.
Sphere inlet line by closing SDV-1201
Minimum circulation line from 43-P-003A/B/C
Vapor line by closing ROV –1203 and its downstream I/v
Doc No. Topic Prepared by Approved by Rev. No Page
SB/BKM RM 6
HPL/IMS/IOP/SOP/ LPG Storage &
8.5.1/41/LPG Transfer System
15 of 26
28/5/19
Standard Operating Procedures
Integrated Offsites & Utilities Plant (IOP)
ACTIO
SOP No. JOB DESCRIPTION
N BY
LPG feed pump, which is not running.
4” Minimum circulation line by closing ROV-1202 if 41-P-
003A/B are not running.
7. Isolate and Blind the following
4” road tanker line to sphere
1.9 2” line of heavies from Propane Purification. SIC&M
3” Crude propane from NCU line.
10” Start up LPG from C4 Raffinate spheres
3” Mixed butane from NCU line
10” line from ship tanker
2” Sampling point line
8. Open the suction valve of 41-P-007A
9. Ensure that the 41-P-007A-discharge valve is in open
condition. M
10. Fully open the minimum circulation line valve. M
11. Adjust the stroke length of the pump and keep it in 90% of
maximum. PE
12. Start the pump as per the pump stat up SOP. M
13. take the whole LPG back to the suction header through
minimum circulation line. M
14. Once the vaporizer is ready to take LPG, slowly close the M
minimum circulation line valve till the desired flow is
required in the vaporizer. M
1.10 15. As per the required flow adjust the stroke length of the
pump.
16. Keep a close watch on the amps, flow and discharge M
pressure of the pump.
M
START UP PROCEDURE OF LPG TO VAPORIZER PUMP
1. Select the pump for transfer.
2. Get the clearance for running of motor and pump from
electrical and mechanical department. M
3. Check lubricant in bearing housing, universal coupling and
motor and if necessary top up. M
4. Ensure that the discharge I/V is in open position. M
5. Ensure that the min. circulation valve is in 50% open
position manually. M
Doc No. Topic Prepared by Approved by Rev. No Page
SB/BKM RM 6
HPL/IMS/IOP/SOP/ LPG Storage &
8.5.1/41/LPG Transfer System
16 of 26
28/5/19
Standard Operating Procedures
Integrated Offsites & Utilities Plant (IOP)
ACTIO
SOP No. JOB DESCRIPTION
N BY
6. Adjust the stroke length according to the desired flow.
7. Open the suction valve and prime the pump. M
8. Start the motor and closely watch the pump discharge M
pressure, amps and the flow. M
9. Open the min. circulation C/V and its bypass to adjust the M
pump discharge pressure, flow and amps.
10. Stabilize the vaporizer level, pressure and temperature SIC
manually. SIC
11. Now put the entire controller in Auto.
M
CHANGE OVER OF LPG TRANSFER PUMPS M
ACTIO
SOP No. JOB DESCRIPTION
N BY
12. Stop pump A and isolate its suction, discharge and vent to flare
lines.
M
Transfer LPG from 41-V-001A to 43-V-002A/B
M
Transfer of LPG from 41-V-001A to 43-V-002A/B is done for
Propane-LPG batch preparation in these two spheres.
ACTIO
SOP No. JOB DESCRIPTION
N BY
1301)
07.Ensure that the following are isolated or blinded
3” CHU de-inventory line to sphere 43-V-002B.
6” C4 raffinate from BDEU to sphere A and B .
6” Sphere B suction line to 43-P-008A suction header.
6” Sphere B suction line to 43-P-010A&B suction header.
12” suction of pump 43-P-002A and B.
3’’ min. circulation line I/V’s in the lines from 43-P-008A
and 3’’ min. circulation line I/V’s in the lines from 43-P- PE
010A/B , of the Spheres 43-V-002A/B.
08.Open 12’ suction line from LPG sphere to 43-P-002A/B
09.Open 6” min. cir. manual I/V in 43-V-002B and close the same
valve in 43-V-002A.
10. Open min. cir. ROV-3205 in 43-V-002B and close the same M
(ROV-3202) in 43-V-002A. M
11. Close 6’’ min. cir. manual I/v of 43-P-002A/B in sphere 41-V-43-v-
001A PE &M
12. Start pump 43-P-002A as per pump starting procedure.
13. Keep close watch on level rising in 43-V-002B. and transfer M
LPG corresponding propane received in that sphere.
14.After completion of transfer open 6’’ min. cir. manual valve of M in
1.13 sphere 41-V-001A and close min. cir. manual valve in 43-V-002B M
ACTIO
SOP No. JOB DESCRIPTION
N BY
ACTIO
SOP No. JOB DESCRIPTION
N BY
PROCEDURE WHILE LPG PUMP TRIPS/CAVITATES M
GENERAL:
Inform the east control room shift in charge about the
pump problem.
Inform the NCU shift in charge about the disturbance in
LPG Supply.
WHEN PUMP TRIPS M
1. Verify whether the pump has tripped due to electrical
problem or due to interlock actuation. M
1.15 2. IF ELECTRICAL PROBLEM THEN
Inform the sub station in 12 in charge about the problem M and
start the stand by Pump.
Once the problem is rectified restart the pump as per the pumpM
start up SOP.
If not the problem due to the motor . Hand over the motor toMthe
Electrical department. M
3. IF INTERLOCK GETS ACTUATED THEN
Find out whether the interlock gets actuated due to high SIC
temperature surrounding (may be fire) the sphere or not.
(I-131).
If yes inform the fire station immediately and take
necessary action in field as per SIC. SIC
1.16
Act as per in case fire SOP.
If the interlock actuation is not due to the fire then inform
the instrumentation personnel and ask them to check the SIC
interlock and it’s thoroughly. SIC
Once it is solved start the pump as per the pump start SIC
up-SOP.
ACTIO
SOP No. JOB DESCRIPTION
N BY
(LPG TO NCU)
SIC&M
Ensure that minimum circulation valve FV-1201 or FV-
1202 is opening according to its given set point.
If FV-1201/1202 fails attend it immediately and open its
by pass valve slowly. This has to be done in continuous M
communication with ECR in –charge.
Communicate with NCU SIC whether the stoppage is for
a short period of for a long period.
If it is for a short period then allow the pump to run M
keeping the minimum circulation line full open.
M
POWER FAILURE
M
GENERAL:
1. Inform in-charge of
a) Unloading gantry area
b) NCU
About non-availability of LPG.
INSTRUMENT AIR FAILURE SIC
GENERAL: PE&M
ACTIO
SOP No. JOB DESCRIPTION
N BY
3. Inform the consumer about the non-availability of LPG.
4. On instrument air failure,
The entire sphere ROV’s –1201/1202/1203 will close. SIC
SDV’ 1201 will close. SIC
Minimum flow control valve FV-1201/1202 will go to fail SIC
open position, thus protecting the pumps. SIC
GENERAL:
In the event of fire, the sphere security system will isolate
the affected sphere and protect the adjacent sphere. In the
event of fire in the loading area, the firewater security
system of the loading gantry will come into action. The
operator shall take following action as soon as fire is
1.20 detected in the sphere area.
ACTIO
SOP No. JOB DESCRIPTION
N BY
10. De-energize the motor. M
11. Prepare and issue WP for working or the pump to mechanical
M &SIC
shift-in-charge. M
12. De-couple the motor if required. M
1.21 M
HAND OVER OF LPG Pumps FOR HOT JOB (41-P-003 A/B, 41- SIC
P-007)) SIC
ACTIO
SOP No. JOB DESCRIPTION
N BY
flare header.
2. Inform technical analysis laboratory personnel about the SIC& M
requirement of sample analysis.
ACTIO
SOP No. JOB DESCRIPTION
N BY
sphere is totally isolated and blinded with LPG system.
13. Connect plant air connection from hose station to sphere
(through I/O line) and start air purging M
14. Vent air through instruments drain valve also. After air
purging the sphere may be flushed with water if continuous M
Water supply and proper drainage facility is provided
15. .After analyzing the oxygen level and LEL content inside the M
sphere by fire and safety dept., permit for man entry can be
issued. SIC&
16. During pressurization activity for hydrotesting SAFET
purpose ,servo to be isolated. Y
SIC
SIC