Company: Page: 1 of 9
Facility:
1.5. Plugging of sand filter 1.5.1. Flow of LPG through 1.5.1.1. FAL 001 provided in Review the need for PDAH across TOYO
FD 34003 the vessel may be restricted. the LPG line at the inlet of sand filter FD 34007.
the unit.
1.6. PIC 052 malfunctions 1.6.1. Entire coker LPG 1.6.1.1. FAL 001 provided in Review the design pressure (31.5 PMC/
and closes PV 052 in the treating unit and LPG the LPG line at the inlet of kg/cm2 g) of equipment and lines in TOYO/
LPG line to B/L. section of DCU may be the unit. the LPG product line (Unit 340) in Licensor
subjected to LPG product... view of the LPG product pump...
PHAWorks by Primatech Inc.
Action Items
Company: Page: 2 of 9
Facility:
Company: Page: 3 of 9
Facility:
6.2. Equipment 6.2.1. Equipment may be 6.2.1.1. MDMT of caustic Examine if MDMT of -27 oC is PMC
depressurization for subjected to low temperature wash column, caustic wash suitable for LPG being produced in
maintenance. contactors and sand filters is DCU.
-27 oC.
Review the MDMT of LPG filters FD PMC
34001 A/B to make it suitable for
LPG depressurization.
Company: Page: 4 of 9
Facility:
Company: Page: 5 of 9
Facility:
Company: Page: 6 of 9
Facility:
Company: Page: 7 of 9
Facility:
Company: Page: 8 of 9
Facility:
25.2. Overflow line 25.2.1. With the siphon Review the hydraulic seal provision TOYO/P
connected to CCBD with breaking valve remaining in with siphon breaker in the overflow MC
hydraulic seal and siphon open position, HC vapour line from caustic tanks. The
breaking valve. from CCBD may escape to objective is to ensure that seal is
atmosphere or air may enter always maintained and no vapour
the system. If the siphon from CCBD can escape through
breaking valve is removed or siphon breaking valve.
closed, the hydraulic seal in
the overflow line cannot be
assured. This may cause
vapour from CCBD entering
the tank.
25.3. Metering pump GA 25.3.1. Possible reverse flow 25.3.1.1. Injection of caustic Provide check valve in the caustic TOYO
34004 A/B trips while of LPG into the fresh castic as a make up is operator injection line to caustic prewash
supplying to caustic tanks FB 34001/ FB attended operation. column to prevent reverse flow of
prewash column DA 34001. 34002. LPG into the tank.
25.4. Caustic circulation 25.4.1. Possible reverse flow 25.4.1.1. This facility is used Provide check valve in the TOYO
pump GA 34002 A/B trips of LPG into the CFC solvent during startup and is normally regenerated caustic line (CL-
while supplying to caustic wash contactor. Potential operator attended. 3400121) to caustic prewash
prewash column DA 34001. overpressure. column to prevent reverse flow of...
PHAWorks by Primatech Inc.
Action Items
Company: Page: 9 of 9
Facility:
25.5. Improper lining of 25.5.1. Possible gravitation 25.5.1.1. Operating Consider provision of check valve TOYO
caustic receipt from OSBL from one tank to other procedures in the caustic inlet line to each of
(Both tank inlet valves left causing operational problem the tank.
open) and overflow
25.6. Improper lining of 25.6.1. Possible gravitation 25.6.1.1. Operating Provide spectacle blind in the TOYO
caustic receipt from OSBL from one tank to other procedures interconnecting line (CL-3400330)
(Interconnecting valve causing operational problem for both the tanks.
between outlet line of both and overflow
tanks open)
Node 1: LPG Treatment: Untreated LPG from B/L through caustic contactors to B/L as treated LPG 1
Parameter: Flow 1
Parameter: Pressure 2
Parameter: Temperature 3
Parameter: Level 3
Parameter: Others 4
Node 2: LPG Treatment:Caustic Solution circulation from CFC 2nd stage to inlet of Regenerator 5
Parameter: Flow 5
Parameter: Temperature 5
Parameter: Others 6
Node 6: LPG Treatment:Naptha from B/L to solvent wash contactor and then to B/L 7
Parameter: Others 7
Node 7: Caustic storage and pumping system 8
Parameter: Others 8