Professional Documents
Culture Documents
19 Dec 16
19 Dec 16
TANK ULLAGE ULLAGE VOLUME VOLUME FREE WATER OIL VOL V.C.F. OIL VOLUME W.C.F
CORRECTED T.O.V. T.O.V. Interface Int. Cor'ed Volume G.O.V. TEMP TEMP API 60 F TABLE 6 @ 60F TABLE 11
NO. m.cm m.cm CU.M. BBLS m.cm m.cm CU.M. VOL.(BBLS) BBLS C F G.S.V. G.S.V. N.S.V.
1C 18.63 18.335 22 140 Nil 0 140 32.4 90.3 45.0 0.98480 138 0.069 138 0.12515
2C 14.49 14.205 1,302 8,190 17.685 17.397 161.604 1,016 7,174 33.7 92.7 45.0 0.98360 7,056 3.528 7,053 0.12515
3C 16.65 16.362 590 3,713 Nil 3,713 36.9 98.4 45.0 0.98065 3,641 1.821 3,639 0.12515
4C 16.80 16.513 534 3,359 Nil 3,359 37.2 99.0 45.0 0.98035 3,293 1.647 3,292 0.12515
5C 17.85 17.563 137 862 Nil 862 33.1 91.6 45.0 0.98415 849 0.424 848 0.12515
6C 17.43 17.143 285 1,794 NIL 0 1,794 35.0 95.0 45.0 0.98245 1,762 0.88 1,761 0.12515
7C 16.79 16.503 535 3,365 NIL 0 3,365 38.2 100.8 45.0 0.97945 3,296 1.648 3,294 0.12515
8C 16.90 16.616 454 2,857 NIL 0 2,857 35.6 96.1 45.0 0.98190 2,805 1.403 2,804 0.12515
SL.P 18.23 17.926 9 60 18.500 18.196 0.8 5 55 33.0 91.4 45.0 0.98425 54 0.027 54 0.12515
SL.S 7.05 6.740 365 2,294 11.920 11.610 209.02 1,315 979 32.0 89.6 45.0 0.98515 965 0.482 964 0.12515
TOTAL
TOTAL 4,235 26,633 371 2,336 24,298 23,859 23,847
REMARKS: 948 69 879 865 865
01.48AM 'Carg 2,954 2,893 2,892
Total cargo Di 143,804 143,804 141,609 141,460
PRODUCTION L
Gross Volume :(T.O.V.) 26,633 Oil Volume @ 60 F :(T.C.V.) 23,859 DRAFT FWD 6.40 m AFT
Less Free Water : 2,336 Less OBQ/ROB :
Oil Volume :(G.O.V.) 24,298 Overall Loaded Vol @ 60 F:
Oil Volume @60F:(G.S.V.) 23,859 Long tons/Metric tons :
Long Tons/Metric Tons : 2,986 3,034 Vessel Experience Factor :
API 60 F : 44.5 Adjusted Volum @ 60 F : Capt. Juanda Pardede
B.S & W. % Vol :. 0.05 Long Tons/Metric Tons : CARGO INSPECTOR
BERTH: OYONG
PORT: OYONG OILFIELD
DATE: 19-Dec-16
2,986 3,034
Staff
Surya Putra Jaya Master Capt. Ihwan Asrul Santos Rep. Capt. Juanda Pard
Water Offtake
Total Water in Cargo (bbls) 2,336 Note : Offtake OC 046 to MT. Olympic Sky
PFW PH 0
Note: PRODUCTION LOADING INTO COT 2C
OIW Average (mg/I) 10 01.48 :Complated discharged to Olympic sky
Regulated Waste
Category Vol (m3) Kg Comments
Biological Waste 0 0
Note :
OYONG OPERATORS DAILY REPORT
Fuel
FSO-MFO FSO-MDO Service Vessel
MDO
Meetings
Incidents
Type Reference Comments
NIL
Drills
Type Time Comment
19-Dec-16
141,460
2,892
pic Sky
deg C
deg C
O COT 2C
o Olympic sky
7738 / 23859
e Vessel
Comment
t. activity
pection / SPKK
lay down
Comment
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT
Mooring/Unmooring :
03.42 : Olympic Sky Cast off
Bunkering/Debunkering :
ENGINE :
1. Maintenance of air conditioner in engine room
- Cleaned evaporator tube
- Cleaned condenser tube
2. Maintenance RO No.2
- Cleaned membrane shell
3. Renewed gland packing atomizing steam valve
4. Running up A/E 1 & 2:
15.30 - 17.30: - Landing mooring hawser to KST 51
9. EHS AUDIT/INSPECTION
by Adventure 1 ( Out )
TOTAL
3460
3458
TRANS ROB
0 240,512
0 92,427
ROB `
45
125
ROB
200
POB
23
28-Nov-13
NIL
NIL
NIL
NIL
NIL
FUEL STATUS REPORT
MDO
NIL
FUEL STATUS REPORT
MFO
Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr )
01 270,112 0 0 0 0 270,112
02 270,112 0 0 0 0 270,112
03 270,112 0 0 0 0 270,112
04 270,112 0 0 0 0 270,112
05 270,112 0 0 0 0 270,112
06 270,112 0 0 0 0 270,112
07 270,112 0 0 0 0 270,112
08 270,112 0 0 0 0 270,112
09 270,112 0 0 3,500 0 266,612
10 266,612 0 0 1,000 0 265,612 Internal Cargo Transferred
11 265,612 0 0 0 0 265,612
12 265,612 0 0 0 0 265,612
13 265,612 0 0 1,000 0 264,612 Internal Cargo Transferred
14 264,612 0 0 0 0 264,612
15 264,612 0 0 6,500 0 258,112 Heating Cargo Operation
16 258,112 0 0 0 0 258,112
17 258,112 0 0 6,400 0 251,712 Debottoming PW COT 4C
18 251,712 0 0 11,200 0 240,512 Off take OC046
19 240,512 0 0 0 0 240,512
20
21
22
23
24
25
26
27
28
29
30
LOG SHEET DOMESTIC & SANITARY WASTE WATER
TOTAL 373 368 393 361 383 363 363 381 369 370 360 235
LOG SHEET DOMESTIC & SANITARY WASTE WATER
TOTAL 240 227 242 227 239 234 239 230 227 237 226 145
LOG SHEET COOLING WATER
TOTAL 153,529 143,947 154,096 148,766 153,882 149,184 154,039 153,898 148,948 154,148 148,907 94,467
Averag
e/Day 4,953 5,141 4,971 4,959 4,964 4,973 4,969 4,964 4,965 4,973 4,803 3,047
LOG SHEET RESERVOIR OSMOSIS WASTE WATER
TOTAL 3,155 2,465 3,200 3,200 2,655 2,540 2,215 2,825 2,900 3,080
DATA PERSONNEL ON BOARD
3 ANDI A UNIT 2/O Main Deck Assist C/O released mooring hawser Positive 1
4 INDRA 3/O CCR room Check leaving crew & visitor manifest Positive 1
5 JULY MANGIRI C/E Engine room House keeping engine room area Positive 1
8 HENDRA PRATAMA 4/E Engine room Renewed gland packing atomizing steam valve Positive 1
9 NIKO E/E Engine room Repaired lighting in engine room looker Positive 1
10 AANG Bosun Main Deck Relased mooring hawser as crane operator Positive 1
11 ACHMAD NURUL HUDA AB Main Deck Assist C/O released mooring hawser Positive 1
13 BAYU SEGARA AB Main Deck Assist C/O released mooring hawser Positive 1
17 SUAIB MTM A/E area Refilled water tank A/E No.2 & 3 Positive 1
20 ROCHIM COOK Mess room Daily house keeping in mess room area Positive 1
Officer mess
21 RANGGUN JAWI STWD room
House keeping in Officer mess room Positive 1
TOTAL 22