BS
Normal Condition
Factor 2 2 2 2
Case:1 1224.43 874.88 20.93 15.01 20.93 874.88
Case:2 1123.71 975.59 18.61 14.61 18.61 975.59
Broken Wire Condition
Factor 1.25 1.25 1.25 1.25
Case:3 886.05 627.33 16.16 15.15 16.16 627.33
Case:4 1052.26 827.13 44.91 46.07 44.91 827.13
Case:5 1003.26 774.87 42.81 38.81 42.81 774.87
Case:6 960.21 721.16 41.72 44.78 41.72 721.16
Case:7 1068.08 789.87 38.3 39.51 38.3 789.87
Case:8 1021.39 740.63 39.42 41.16 39.42 740.63
Case:9 967.45 697.35 39.7 50.97 39.7 697.35
Case:10 823.66 689.72 14.72 14.91 14.72 689.72
Case:11 988.29 882.61 44.1 45.71 44.1 882.61
Case:12 939.2 830.88 42 38.45 42 830.88
Case:13 896.03 777.05 41.07 44.94 41.07 777.05
Case:14 1011.99 853.99 38 39.87 38 853.99
Case:15 965.39 804.68 37.37 41.1 37.37 804.68
Case:16 911.56 761.52 37.76 50.82 37.76 761.52
Stringing Condition
Factor 1.25 1.25 1.25 1.25
Case:17 62.87 0 2.94 2.99 2.94 0
Case:18 100.12 0 7.66 4.15 7.66 0
Case:19 121.76 0 10.45 4.83 10.45 0
Case:20 147.23 0 14.73 4.73 14.73 0
Case:21 141.26 0 6.46 3.32 6.46 0
Case:22 179.44 0 4 4.21 4 0
Case:23 216.26 0 7.53 4.18 7.53 0
BS +3M
Normal Condition
Factor 2 2 2 2
Case:1 1245.4 878.09 21.49 8.41 21.49 878.09
Case:2 1144.69 978.79 20.67 8.2 20.67 978.79
Broken Wire Condition
Factor 1.25 1.25 1.25 1.25
Case:3 900.29 623.69 14.74 10.38 14.74 623.69
Case:4 1067.08 819.29 39.56 38.41 39.56 819.29
Case:5 1021.91 771.86 38.35 31.68 38.35 771.86
Case:6 981.4 723.03 37.63 38.44 37.63 723.03
Case:7 1079.95 787.66 36.72 33.82 36.72 787.66
Case:8 1036.77 742.13 37.11 33.92 37.11 742.13
Case:9 987.72 701.41 37.05 42.83 37.05 701.41
Case:10 837.9 686.08 14.23 10.25 14.23 686.08
Case:11 1003.42 875.16 39.4 38.23 39.4 875.16
Case:12 958.17 828.17 38.2 31.49 38.2 828.17
Case:13 917.55 779.24 37.56 38.53 37.56 779.24
Case:14 1023.56 851.52 35.43 34.01 35.43 851.52
Case:15 980.46 805.87 35.8 33.88 35.8 805.87
Case:16 931.51 765.27 35.8 42.74 35.8 765.27
Stringing Condition
Factor 1.25 1.25 1.25 1.25
Case:17 71.71 0 2.16 2.14 2.16 0
Case:18 106.73 0 6.39 2.71 6.39 0
Case:19 125.95 0 8.9 3.05 8.9 0
Case:20 149.31 0 12.32 2.99 12.32 0
Case:21 151.41 0 4.95 2.32 4.95 0
Case:22 188.31 0 2.66 2.77 2.66 0
Case:23 223.95 0 5.42 2.75 5.42 0
BS +6M
Normal Condition
Factor 2 2 2 2
Case:1 1262.89 885.04 28.5 51.78 28.5 885.04
Case:2 1162.2 985.74 25.07 47.77 25.07 985.74
Broken Wire Condition
Factor 1.25 1.25 1.25 1.25
Case:3 911.29 623.75 23.04 36.54 23.04 623.75
Case:4 1077.43 816.6 50.29 59.98 50.29 816.6
Case:5 1035.4 774.06 47.85 54.24 47.85 774.06
Case:6 996.91 729.58 45.37 53.04 45.37 729.58
Case:7 1090.01 787.82 41.58 48.44 41.58 787.82
Case:8 1050.02 745.63 39.17 55.98 39.17 745.63
Case:9 1005.34 706.94 36.72 63.93 36.72 706.94
Case:10 848.91 686.14 20.91 34.06 20.91 686.14
Case:11 1014.03 872.8 48.69 57.42 48.69 872.8
Case:12 971.92 830.63 46.27 51.67 46.27 830.63
Case:13 933.34 786.05 43.81 55.17 43.81 786.05
Case:14 1033.37 851.23 43.18 50.85 43.18 851.23
Case:15 993.44 809.1 40.75 53.77 40.75 809.1
Case:16 948.87 770.51 38.29 61.73 38.29 770.51
Stringing Condition
Factor 1.25 1.25 1.25 1.25
Case:17 76.97 0 2.93 3.12 2.93 0
Case:18 110.09 0 7.41 4.74 7.41 0
Case:19 127.46 0 10.06 5.59 10.06 0
Case:20 148.9 0 13.07 6.56 13.07 0
Case:21 157.81 0 6.87 6.22 6.87 0
Case:22 193.6 0 5.21 7.85 5.21 0
Case:23 228.24 0 7.54 9.39 7.54 0
BS +9M
Normal Condition
Factor 2 2 2 2
Case:1 1273.62 891.24 23.14 1.81 23.14 891.24
Case:2 1172.91 991.94 23.1 1.77 23.1 991.94
Broken Wire Condition
Factor 1.25 1.25 1.25 1.25
Case:3 917.24 625.11 14.92 5.35 14.92 625.11
Case:4 1084.73 814.41 34.42 29.02 34.42 814.41
Case:5 1045.56 774.94 34.08 24.57 34.08 774.94
Case:6 1009.33 733.71 33.74 32.06 33.74 733.71
Case:7 1093.32 791.01 35.1 28.4 35.1 791.01
Case:8 1055.91 751.7 34.81 25.2 34.81 751.7
Case:9 1014.49 715.29 34.53 32.7 34.53 715.29
Case:10 854.86 687.5 14.89 5.33 14.89 687.5
Case:11 1021.55 870.91 34.87 28.99 34.87 870.91
Case:12 982.3 831.75 34.54 24.55 34.54 831.75
Case:13 945.99 790.43 34.22 32.04 34.22 790.43
Case:14 1036.46 854.19 34.59 28.37 34.59 854.19
Case:15 999.11 814.94 34.29 25.17 34.29 814.94
Case:16 957.79 778.63 34 32.67 34 778.63
Stringing Condition
Factor 1.25 1.25 1.25 1.25
Case:17 79.14 0 1.33 1.25 1.33 0
Case:18 110.62 0 4.85 1.26 4.85 0
Case:19 126.91 0 6.95 1.26 6.95 0
Case:20 146.33 0 9.37 1.27 9.37 0
Case:21 160.98 0 3.28 1.28 3.28 0
Case:22 195.83 0 1.29 1.29 1.29 0
Case:23 229.6 0 3.16 1.31 3.16 0
Compression
Normal Condition
1273.62 891.24 23.14 1.81
1205.06 1172.91 991.94 23.1 1.77
1104.35 1262.89 885.04 28.5 51.78
1262.89 885.04 28.5 51.78
54.46
95.01
119.65
147.58
131.29
170.98
209.19
1224.43
1123.71
886.05
1052.26
1003.26
960.21
1068.08
1021.39
967.45
823.66
988.29
939.2
896.03
1011.99
965.39
911.56
62.87
100.12
121.76
147.23
141.26
179.44
216.26
1245.4
1144.69
900.29
1067.08
1021.91
981.4
1079.95
1036.77
987.72
837.9
1003.42
958.17
917.55
1023.56
980.46
931.51
71.71
106.73
125.95
149.31
151.41
188.31
223.95
1262.89
1162.2
911.29
1077.43
1035.4
996.91
1090.01
1050.02
1005.34
848.91
1014.03
971.92
933.34
1033.37
993.44
948.87
76.97
110.09
127.46
148.9
157.81
193.6
228.24
1273.62
1172.91
917.24
1084.73
1045.56
1009.33
1093.32
1055.91
1014.49
854.86
1021.55
982.3
945.99
1036.46
999.11
957.79
79.14
110.62
126.91
146.33
160.98
195.83
229.6
Design of Footing Pad for Tower Type DS, Soil Type - C1-Rev-B
Condition Normal Condition Broken Wire / String
NWC-C1 NWC-C2 NWC-C3,C4 BWC-C1 BWC-C2
Load Inputs:
Factored load along leg:
Axial Compression Load Cu = 1273.620 1172.91 1262.89 1093.320 975.93
Axial Uplift Load Uu = 891.24 991.940 885.04 791.01 890.380
Transverse Shear Tu = 23.14 23.1 28.500 35.1 40.42
Longitudinal Shear Lu = 1.81 1.77 51.780 28.4 41.42
Slope Parameters:
Tower Vertical Slope = 7.830 7.830 7.830 7.830 7.830
Tower Resultant Slope 1 = 11.01 11.01 11.01 11.01 11.01
Develop DE = 1.0187 1.0187 1.0187 1.0187 1.0187
Material Parameters:
Design of Footing Pad for Tower Type DS, Soil Type - C1-Rev-B
Condition Normal Condition Broken Wire / String
NWC-C1 NWC-C2 NWC-C3,C4 BWC-C1 BWC-C2
Density of Soil S = 17.66 17.66 17.66 17.66 17.66
Density of Concrete C = 24.00 24.00 24.00 24.00 24.00
Angle of Conical Frustum = 20 20 20 20 20
Angle of Internal Friction = 30 30 30 30 30
Safe Bearing Capacity of Soil SBC = 250 250 250 250 250
Concrete(Cube Strength) FCU = 30 30 30 30 30
Concrete(Cylinder Strength) F'C 0.8*FCU = 24 24 24 24 24
Grade of Steel FY = 460 460 460 460 460
Geometric Property:
Depth of Footing below Ground D = 3.45 3.45 3.45 3.45 3.45
Footing Details
Length(Long) LLF = 3.20 3.20 3.20 3.20 3.20
Breadth(Tran) LTF = 3.20 3.20 3.20 3.20 3.20
Depth DF = 0.45 0.45 0.45 0.45 0.45
Area AF LLF*LTF = 10.24 10.24 10.24 10.24 10.24
Volume VF AF*DF = 4.61 4.61 4.61 4.61 4.61
Weight WF VF * C = 110.59 110.59 110.59 110.59 110.59
Section Modulus (Long) ZLF LLF*L /6
TF
2
= 5.461 5.461 5.461 5.461 5.461
Section Modulus (Tran) ZTF LTF*L /6
LF
2
= 5.461 5.461 5.461 5.461 5.461
Chimney Details
Length(Long) LLC = 0.65 0.65 0.65 0.65 0.65
Breadth(Tran) LTC = 0.65 0.65 0.65 0.65 0.65
Depth below G.L. DC D-DF = 3.00 3.00 3.00 3.00 3.00
Plinth Height DP = 0.45 0.45 0.45 0.45 0.45
Chimney top to Bracing Hole DB 0.05 0.05 0.05 0.05 0.05
Height along Leg HC (DC+DP)*DE = 3.51 3.51 3.51 3.51 3.51
Area AC LLC*LTC = 0.42 0.42 0.42 0.42 0.42
Volume VC AC*HC = 1.48 1.48 1.48 1.48 1.48
Design of Footing Pad for Tower Type DS, Soil Type - C1-Rev-B
Condition Normal Condition Broken Wire / String
NWC-C1 NWC-C2 NWC-C3,C4 BWC-C1 BWC-C2
Weight WC VC * C = 35.64 35.64 35.64 35.64 35.64
Uplift check:
Weight of Conical Frustum FS = 399.25 399.25 399.25 399.25 399.25
S * D2 * Tan * (9LTF +2D *Tan)/6
MRT
Resisting Moment(Tran) (WF+WC+WS+FS)* LTF/2 + MP = 1927.79 1927.79 1927.79 1927.79 1927.79
MRL
Resisting Moment(Long) (WF+WC+WS+FS)* LLF/2 +MP = 1927.79 1927.79 1927.79 1927.79 1927.79
Top Reinforcement
During Uplift condition the top of pad experience the pressure
Total max Load W UR-(WF+WC+WS) = 228.52 179.10 231.57 44.78 -33.25
Transverse load Moment MTT UR*eL - TRU*(D+DP+DB) = 51.72 52.32 62.26 119.46 137.35
Longitudinal load Moment MLT UR*eT - LRU*(D+DP+DB) = 9.59 10.19 108.24 98.29 140.51
Gross Pressure PGROT W/AF + MT/ZLF + ML/ZTF = 33.54 28.94 53.83 44.24 47.63
Main Reinforcement TS1 = 12.00 12.00 12.00 12.00 12.00
Area of Main Reinforcement AS1 = 113.10 113.10 113.10 113.10 113.10
Effective Depth d1 (DF-C-TS1/2) = 369.00 369.00 369.00 369.00 369.00
Cantilever Length of Footing X1 (LLF - LLH)/2 = 1.337 1.337 1.337 1.337 1.337
Bending Moment MDT PDT*LTF*X12/2 = 95.92 82.75 153.95 126.52 136.20
Coefficient RN MDT/0.9(LTF*d2) = 0.24 0.21 0.39 0.32 0.35
Percentage of Reinforcement (0.85F'c)/FY(1-((1-(2RN/0.85 F'c))) =
0.05 0.05 0.09 0.07 0.08
Critical Section at " 1.5*d "distance from the face of the Chimney
Depth d = 367.0 367.0 367.0 367.0 367.0
Factors
C LLC/LTC = 1.000 1.000 1.000 1.000 1.000
bo 2*((LLC+d) + (LTC+d)) = 4.068 4.068 4.068 4.068 4.068
S = 20 20 20 20 20
Shear Factor V1 0.17(1+2/C) = 0.51 0.51 0.51 0.51 0.51
V2 1/12[(S * d/bo)+2] = 0.32 0.32 0.32 0.32 0.32
V3 = 0.33 0.33 0.33 0.33 0.33
Punching Shear PS CU + WC = 1309.26 1208.55 1298.53 1128.96 1011.57
Allowable Shear PSA 0.85*Min(V1:V3)*(Fcu)* bo*d
= 1970.916 1970.916 1970.916 1970.916 1970.916
1077.43 1005.34 kN
816.6 706.94 kN
50.290 36.72 kN
59.98 63.930 kN
1.25 1.25
1.5 1.5
1.5 1.5
1.5 1.5
861.94 804.27 kN
653.28 565.55 kN
40.23 29.38 kN
47.98 51.14 kN
846.08 789.47 kN
641.26 555.14 kN
156.63 137.99 kN
164.38 159.76 kN
128.45 105.75 kN
136.21 127.52 kN
Broken Wire / Stringing Condition
BWC-C3 BWC-C4
17.66 17.66 kN/m3
24.00 24.00 kN/m3
20 20 Deg
30 30 Deg
250 250 kN/m2
30 30 N/mm2
24 24 N/mm2
460 460 N/mm2
3.45 3.45 m
3.20 3.20 m
3.20 3.20 m
0.45 0.45 m
10.24 10.24 m2
4.61 4.61 m3
110.59 110.59 kN
5.461 5.461 m3
5.461 5.461 m3
0.65 0.65 m
0.65 0.65 m
3.00 3.00 m
0.45 0.45 m
0.05 0.05 m
3.51 3.51 m
0.42 0.42 m2
1.48 1.48 m3
Broken Wire / Stringing Condition
BWC-C3 BWC-C4
35.64 35.64 kN
1.29 1.29 m3
29.43 29.43 m3
519.71 519.71 kN
3.00 3.00
0.33 0.33
2.67 2.67
3.45 3.45 m
3.00 3.00 m
519.91 519.91 kN/m
91.83 91.83 kN/m
23.75 23.75 kN.m
199.73 199.73 kN.m
223.48 223.48 kN.m
0.53 0.53 m
0.53 0.53 m
Broken Wire / Stringing Condition
BWC-C3 BWC-C4
992.31 935.70 kN
170.56 126.90 kN.m
201.18 212.88 kN.m
164.97 153.59 kN/m2
28.84 29.16 kN/m2
< 250 < 250
399.25 399.25
kN
1065.19 1065.19 kN
641.26 555.14 kN
2.28 2.64
>1.5, O.K >1.5, O.K
1193.75 1011.90
kN.m
1927.79 1927.79
kN.m
1.61 1.91
>1.5, O.K >1.5, O.K
1224.37 1097.88
kN.m
1927.79 1927.79
kN.m
1.57 1.76
>1.5, O.K >1.5, O.K
Broken Wire / Stringing Condition
BWC-C3 BWC-C4
156.63 137.99 kN
164.38 159.76 kN
164.38 159.76 kN
137.64 137.64 kN
137.75 137.75 kN
872.97 840.28 kN
1148.36 1115.67 kN
6.99 6.98
>1.5,O.K >1.5,O.K
2169.00 2169.00 kg
5.32 5.32 kN
2.82 2.82 kN.m
233.97 233.97 kN.m
83.04 83.04
16.00 16.00 mm
201.06 201.06 mm2
75.00 75.00 mm
367.00 367.00 mm
0.062 0.062 m
1.337 1.337 m
589.69 549.01 kN.m
1.52 1.42
Broken Wire / Stringing Condition
BWC-C3 BWC-C4
0.34 0.32
%
0.20 0.20 %
0.34 0.32 %
4037.64 3748.29 mm2
159.35 171.65 mm
150.00 mm
0.37 0.37 %
24.69 110.80 kN
167.74 123.67 kN.m
198.36 209.66 kN.m
69.45 71.85 kN/m2
12.00 12.00 mm
113.10 113.10 mm2
369.00 369.00 mm
1.337 1.337 m
198.59 205.48 kN.m
0.51 0.52
0.11 0.12 %
0.20 0.20 %
0.20 0.20 %
2361.60 2361.60 mm2
153 153 mm
150 mm
0.20 0.20 %
Broken Wire / Stringing Condition
BWC-C3 BWC-C4
367.0 367.0 mm
1.000 1.000
4.068 4.068
20 20
0.51 0.51
0.32 0.32
0.33 0.33
1113.07 1040.98
1970.916 1970.916
Safe Safe
Condition
Load Inputs:
Compression Load CU
Uplift Load UU
Long Moment MT
Trans Moment ML
Slope Parameters:
Tower Vertical Slope
Tower Resultant Slope 1
Develop DE
Material Parameters:
Grade of Concrete FCU
Grade of Steel FY
Chimney Details
Length(Long) h
Breadth(Tran) b
Depth below G.L. DC
Plinth Height DP
Height along Leg HC (DC+DP)*DE
Lateral Ties
As per Clause 3.12.7.1
Spacing of Ties Sv (12 * m)
Provided Spacing
Provide 12 Nos of 20 mm Dia Rebar with 10 mm Lateral ties at 200 Spacing
Lateral Ties
As per Clause 3.12.7.1
Spacing of Ties Sv (12 * m)
Provided Spacing
Provide 12 Nos of 20 mm Dia Rebar with 10 mm Lateral ties at 200 Spacing
Normal Condition Broken Wire / Stringing Condition
NWC-C1 NWC-C2 NWC-C3,C4 BWC-C1 BWC-C2 BWC-C3
= 30 30 30 30 30 30
= 460 460 460 460 460 460
1005.34 kN
706.94 kN
126.68 kN.m
220.56 kN.m
7.830 Deg
11.01 Deg
1.0187
30 N/mm2
460 N/mm2
650 mm
650 mm
3.00 m
0.45 m
3.51 m
32.50 mm
32.50 mm
32.67 kN.m
32.67 kN.m
126.68 kN.m
220.56 kN.m
20.00 mm
10.00 mm
75.00 mm
555 mm
555 mm
0.08
0.88
0.23 kN.m/m
0.40 kN.m/m
0.40 %
0.40 %
8.00 Nos
2513.27
0.59 %
419987 mm2
5219.13 kN
O.K
240 mm
200 mm
32.50 mm
32.50 mm
22.98 kN.m
22.98 kN.m
126.68 kN.m
220.56 kN.m
20.00 mm
10.00 mm
75.00 mm
555 mm
555 mm
0.06
0.88
0.23 kN.m/m
0.40 kN.m/m
332.04 kN.m
0.85
0.06 N/mm2
0.04 N/mm2
0.10 %
0.40 %
8.00 Nos
2513.27
0.59 %
419987 mm2
738967 kN
O.K
240 mm
200 mm