STEP-1:
335.35
Total working load on plinth = = 223.57 KN
1.5
F CK = 20 N/mm2
F y= 415 N/mm2
10
I,e w f = x223.57 = 22.35 KN
100
Total load = 223.57+22.35 = 245.92 KN
Total load
Area of footing =
SBC of soil
245.2
= =1.63m 2
150
Side of footing =√ A =√ 1.63
=1.27 m ≈ 1.5 m
= 367.8 KN
STEP – 2
BENDING MOMENT :
factor load
Actual upward soil pressure (q) =
area of footing
367.8
=
1.5× 1.5
= 163.46 KN/ m 2
Critical section for maximum B.M lies at the base of the column ( from clause 3.4.2.3.2 of IS 456)
q ×l ×(l−a)2
B.M =
8
163.46× 1.5×(1.5−0.23)2
= = 49.43 KN-m
8
STEP – 3
DEPTH OF FOOTING
Considering b = 1500 mm
B.M. = Q x b x d 2
d =109.27 mm ≅ 110 mm
STEP-4
REINFORCEMENT
A st × f y
M ud =0.87 x f y x A stx d (1- )
f ck × b ×d
A st × 415
49.43x106 =0.87 x 415 x A stx 200 x(1- )
20× 1500× 200
A st = 720 mm2
Assme # 10mm
720
No. of bars = π = 9.16 no.s ≅ 10no.s
× 102
4
Distribution of traverse reinforcement
Provide 10mm dia 10No.
π
Actual Ast = 10× ×102 = 785.39 mm2
4
STEP 5
l−a
= q×l× [ 2
−d ]
1.5−0.23
= 163.443×1.5× [ 2
−0.2 ]
= 106.632 KN
Vu
Nominal shear stress τv =
bd
106.63× 103
=
1500 ×200
= 0.35 N/mm 2
785.3
Percentage of steel = X 100
1500 X 200
= 0.261 %
0.25 – 0.50
0.36 – 0.48
τc = 0.365
Permissible shear stress (kτc) depending upon the thickness of slab, grade of
concrete and % of A st
τv < kτc
STEP 6
d
The critical plane lies at a distance of around face of column
2
Shear acting on the hatched area = q × (l2-(a+d)2)
= 163.443 ×(1.52-(0.23+0.2)2)
= 337.52 KN
= 4×(230+200)×200
= 344000 mm 2
q(l 2− ( a+d )2 )
Nominal shear force τv =
4 (a+ d) d
337.52 X 103
= = 0.98 N/mm2
344000
Permissible shear stress Z p = ksτc
k s = 0.5+βc
230
βc = =1
230
k s = 0.5+1 = 1.5