You are on page 1of 1

Oil & Gas

Fitness-for-Purpose (FFP) Assessment

Confirming the condition of the pipeline and Benefits


recommending immediate actions.
Experienced integrity engineers choose the most
appropriate assessment code
Following in-line inspection of a pipeline, the objective of a Most appropriate and not just most conservative approach
Fitness-For-Purpose (FFP) Assessment is to quickly assess to assess features
the results of the inspection and to identify and prioritize Provides exact tasks to plan repair and maintenance
any features which may be an immediate threat to the Resulting actions reduce the immediate risk to the pipeline
integrity of the pipeline for remedial action.

Key objectives
The aim of the FFP Assessment is to assess the features
reported by the inspection in terms of their immediate
integrity. The FFP Assessment will provide a written report
Peak Depth [% wt]

on the pipeline condition and advise on and justify the need


for a further detailed FFP and Future Integrity Planning and/
or other studies to ensure the future integrity of the pipeline.

Scope Modified B31.G, 68% SMYS


Modified B31.G, 95% SMYS
QA Assessment of input data External Corrosion Features
Selection of appropriate assessment code Internal Corrosion Features

Detailed Feature Assessment


Assessment of the immediate integrity of the pipeline Axial Length [mm]
Prioritization of immediate remedial actions and/or repairs
Advise of the need for any additional detailed Example of defect assessment in accordance with DNV
assessments/studies

2012 ROSEN Swiss AG. All Rights Reserved.


AIMS-FFP_SF_E_CMR_3.0_201206

www.rosen-group.com

You might also like