CERTIFICATE OF

design
PRACTICAL COMPLETION
Project :
Date :

The work performed under this contract has been reviewed and found to be practically
completed including all corrective work during the defect liability period.
The date of practically completion is to day, ..
The designated area or scope of work is for entire jobs that mentioned in contract agreement.

Most of items to be completed or corrected prepared by the Supervisor and Hotel Operator as
in attachment and has been inspected and approved by Supervisor and Hotel Operator.

Remarks:
See attached corrective work list (Checklist) that has been signed by Hotel Operator,
Supervisor and Contractor.
Reference document:
. project contract document that have been signed
on , 2002, inclusive all drawings, specification and Consultants instructions.

The Certificate of Practical Completion is agreed and accepted by:

Owner, Contractor,
.

( ) ( .. )

Consultant, Management Hotel,


C DESIGN

( .. ) ( )