The obligation of the Design Team Consultants shall be to design and develop a hotel,
which encompasses not only code compliant standards, but also those, which provide
the best available practices and protection available at the time of construction.
In locations where there is an absence of relevant code or that they are in any way
lesser than the following standards, the latter shall form the required minimum standards
for newly constructed hotels.
i
Life Safety and Security Minimum Standards
It is a minimum standard that all newly constructed Hotels are
designed and constructed to be in full compliance with NFPA 101 or its subsequent
revision.
All life safety and security systems must also comply with Engineering
Recommendations and Minimum Standards or the prevailing codes and legal
requirements issued by authorities having jurisdiction over the project, whichever is
demonstrably higher.
ii
Table of Contents
General Introduction …………………….i
Scope of Work of Consultants …………………….1
Area Program …………………..22
Guestrooms, Suites, & Corridors …………………..23
Mock-Up Room …………………..34
Mock-Up Room Review & Inspection Checklist …………………...37
Prototype Room …………………..38
Public Areas …………………..41
Food & Beverage Outlets, Banqueting & Meeting Facilities …………………...48
Kitchens, Bars, and Pantries …………………..56
Recreation and Leisure Facilities …………...……...81
Back of House Facilities …………...……...96
Hotel Laundry & Valet …………...…….113
Definition of FF&E …………...…….123
FF&E Purchasing …………...…….136
Sustainable Design …………...….…149
Security Systems …………....……152
Acoustical Performance …………....……157
Hardware …………....……159
Back of House Finishes …………....……178
Operable Partitions …………....……187
Project Completion …………....……190
iii
Scope of work of MEP consultants
1
Design Architect / Local Architect
The scope of the Design Architect's basic services include those described in the
following paragraphs and shall also where required include coordination with Owner
provided Architect of Record and all Owner appointed Project Consultants and members
of the Project Design Team.
2
Phase Three – Design Development
- Development of approved schematic phase documents to establish the final scope,
relationships, form, size, and appearance of the project by plans, sections,
elevations and details.
- Detailed specification of systems, materials and equipment.
- Coordination of documents with Owner/Developer's appointed Consultants and
T.S., in accordance with the design development timetable and preliminary
estimate of probable construction cost.
- Advisory of any adjustments to the project delivery timetable or cost resulting from
changes in program, scope or design requirements.
- Interaction, as required, with all authorities having jurisdiction over the project to
ensure ongoing code compliance.
- Presentation of developed documentation to Owner/Developer and T.S. for
review and approval or modification as required.
3
Phase Six – Construction
- Administration of the project including construction contract(s).
- Review and appropriate action on Contractors’ shop drawings, product data and
samples for compliance with the contract documents.
- Provide interpretations of the contract documents consistent with the intent and
reasonably inferable.
- Secure Contractors’ certification of components and/or systems where required by
contract or prevailing code.
- Distribution of Contractors’ submittals to Owner/Developer and T.S. for receipt of
comments prior to issuing approval.
- Site visits to become familiar with the works, monitor and report on quality,
adherence to contract documents, and progress of the works in accordance with the
project delivery timetable.
- Evaluation and certification of Contractors’ applications for payments, maintenance
of records detailing, payments, changes, and retention in accordance with contract
conditions and progress of the works.
- Provide inspection reports detailing rejection of works, which do not conform to the
contract documents. Conduct additional inspection or arrange testing of the rejected
works where necessary to ensure compliance with the intent of the contract
documents.
- Project completion services including final evaluation of all completed works in
accordance with the contract documents together with certification of substantial
completion and listing of all items to be completed.
Interior Designer
4
- Preparation and presentation to Owner/Developer and T.S. of documents
illustrating interior space planning, guestroom configuration, design character and
appearance for review and approval or modification, as required.
- Presentation to Owner/Developer and T.S. of all schematic phase documentation for review and
5
Phase Four – Construction Documents
- Submittal of final design documents including FF&E specifications in a form suitable
for competitive tendering, line by line cost estimate in compliance with budget, and
coordinated scaled drawings.
- Briefing/liaison with Purchasing Agent on recommended sources, Manufacturers,
and rendering assistance in the interpretation and clarification of drawings and
specifications.
- Participation in the pre-qualification of bidders.
- Coordination with Owner/Developer and T.S. to identify items, which require
prototype approval prior to manufacture.
6
Resort Master Planning Consultant
Phase One – Preliminary Concept
- Site evaluation including review of property surveys, certified land boundaries,
topographic base maps, aerial photographs, environment character, vegetation
delineation maps, easements and rights of way, structure placement, engineering
information, local planning reports, compliance with all prevalent codes, etc.
- Familiarization with T.S. Design Recommendations and Minimum Standards.
- Attendance at a design team briefing with the Owner/Developer, T.S., and
Consultant team to understand the development objectives and development
program.
- Review any other planned development in the vicinity that may have an impact on
the project’s future development potential.
- Preparation of feasibility report, including review of marketing, economic data, and
other studies prepared by others.
- Preparation of a Resort Master Plan Concept Report with summary of significant
data, overall project program, including site analysis maps and drawings, square
meterage requirements, area schematics and study of pedestrian and vehicular
approach, parking, circulation, incorporation of utilities and outline operational
functionality.
- Preparation of conceptual drawings, sketches, renderings, electronic visualizations
that serve to record and illustrate the approved preliminary concept.
- Coordination with project delivery timetable.
- Preparation of probable cost in conformance with budget established with
Owner/Developer for review and approval or modification, as required.
7
Phase Three – Design Development / Final Resort Master Plan
- Development of approved Resort Master Plan and related documents to establish
the final scope, relationships, and master plan implementation requirements by
plans, sections, and details.
- Coordination of documents with Owner/Developer's appointed Consultants in
accordance with the design development timetable and preliminary estimate of
landscaping cost.
- Advisory of any adjustments to the project delivery timetable or estimated cost
resulting from changes in program, scope or design requirements.
- Presentation of developed documentation to Owner/Developer and T.S. for
review and approval or modification, as required.
Landscape Designer
Phase One – Preliminary Concept
- Site evaluation including review of certified land boundaries, environment character,
topography, rights of way, structure placement and compliance with all prevalent
codes.
- Familiarization with T.S. Design Recommendations and Minimum Standards.
- Preparation of landscape program including square meterage requirements, area
schematics and study of pedestrian and vehicular approach, parking, circulation,
incorporation of utilities and outline operational functionality.
- Preparation of conceptual drawings, sketches, renderings, electronic visualizations
that serve to record and illustrate the approved preliminary concept.
- Coordination with project delivery timetable.
- Preparation of probable cost in conformance with budget established with
Owner/Developer for review and approval or modification, as required.
8
Phase Two – Schematic Design
- Coordination with T.S. Preliminary Area Program requirements, external area
planning and functional relationships.
- Preparation of schematic site plan detailing, grading, drainage/irrigation, hardscape,
softscape outline specifications, wet features, architectural, structural and civil
engineering requirements, landscaping features, and lighting concept (in
collaboration with the Lighting Consultant).
- Preliminary estimate of landscaping cost in accordance with approved probable
cost.
- Preparation of landscape design development timetable in coordination with project
delivery timetable.
- Consultation with Architect to ensure compliance with prevailing codes and permits.
- Presentation of all schematic phase documentation to Owner/Developer and
T.S. for review and approval or modification, as required.
9
Phase Five – Tender & Negotiation
- Assistance in the establishment and management directives of an on-site/off-site
nursery (if applicable).
- Render assistance to qualified bidders in the interpretation and clarification of
drawings and specifications.
- Analysis of received bids to ensure compliance, or otherwise, of bids with approved
construction documents.
- Analysis of proposed alternatives and recommendations for acceptance/rejection.
- Coordination as necessary with Owner/Developer to ensure competitively tendered
items remain in compliance with budget, required revisions to design documents.
10
- Consultation with Architects and MEP Consultants and all authorities having
jurisdiction over the project for the purpose of ensuring developed designs, systems,
components and equipment specifications comply with all prevailing codes and
project permits.
- Preliminary area-by-area schedule of service connections and loads of all MEP
Services for both BOH and public area show kitchens.
- Preparation of schematic space utilization plans for both BOH and public area show
kitchens illustrating functionality, resource traffic patterns and operational delivery
together with architectural and Interior Design requirements.
- Preliminary estimate of probable kitchen equipment costs.
- Preparation of kitchen design development timetable in coordination with project
delivery timetable.
- Presentation of all schematic phase documentation to Owner/Developer and
T.S. for review and approval or modification, as required.
11
Phase Four – Construction Documents
- Briefing/liaison with Purchasing Agent on recommended sources, Manufacturers
and rendering assistance in the interpretation and clarification of drawings and
specifications.
- Preparation of installation, testing, commissioning and handover timetable in
accordance with the project delivery timetable.
- Preparation in accordance with Owner/Developer's directives on tender information
forms and instructions to allow the competitive bidding of the project.
- Participation in the pre-qualification of bidders, review of tender packages.
- Assistance with Owner/Developer’s preparation of Contract Agreements.
- Advisory to Owner/Developer of any adjustments to previous preliminary estimates
of cost including those due to changes in program or project scope and design
intents.
- Assistance in preparation and filing of all documents required by authorities having
jurisdiction over the project in order to secure all related permits, certificates and
licenses.
12
- Provide inspection reports detailing rejection of works, which do not conform to the
contract documents. Conduct additional inspection or arrange testing of the rejected
works where necessary to ensure compliance with the intent of the contract
documents.
- Project completion services including testing and commissioning of all completed
works in accordance with the contract documents, together with certification of
substantial completion and listing of all items to be completed or remedied.
Laundry Consultant
Phase One – Preliminary Concept
- Not required.
13
- Coordination of design development documents with Owner/Developer's appointed
Consultants in accordance with the design development timetable and preliminary
estimate of construction cost.
- Revised estimate of costs in accordance with the developed design and initial
budget.
- Interaction as required with all authorities having jurisdiction over the project to
ensure on-going code compliance.
- Presentation of developed documentation to Owner/Developer and T.S. for
review and approval or modification, as required.
14
Phase Six – Construction
- Review and appropriate action on Contractors’ shop drawings, product data and
samples for compliance with the contract documents.
- Periodic site visits and reporting to become familiar with the works monitor and
report on quality, adherence to contract documents, and progress of the works in
accordance with the project delivery timetable.
- Provide interpretation of the contract documents consistent with the intent and
reasonably inferable.
- Provide inspection reports detailing rejection of works, which do not conform to the
contract documents. Conduct additional inspection or arrange testing of the rejected
works where necessary to ensure compliance with the intent of the contract
documents.
- Project completion services including testing and commissioning of all completed
works in accordance with the contract documents, together with certification of
substantial completion and listing of all items to be completed or remedied.
15
- Presentation of developed design documentation to Owner/Developer and T.S.
for review and approval or modification, as required.
16
- Provide inspection report detailing completion of manufacturing, delivery and
installation in accordance with contract documents.
Uniform Designer
Phase One – Preliminary Concept
- Not required.
17
Phase Five – Tender & Negotiation
- Rendering assistance to qualified bidders in the interpretation and clarification of
drawings and specifications.
- Participation in the review of bids, to ensure compliance with approved interior
design documents.
- Analysis of proposed alternatives and recommendations for acceptance/rejection.
- Coordination with Owner/Developer, T.S. and Purchasing Agent to ensure that
competitively tendered items remain in compliance with budget, necessary revisions
to design documents.
18
Phase Four – Construction Documents
- Preparation in accordance with Owner/Developer’s directives of tender information
forms and instructions for open competitive bidding of the project.
- Assistance with the Owner/Developer’s preparation of Contract Agreement.
- Review of original sources of FF&E specifications with related Consultants, pre
qualification of bidders in coordination with Owner/Developer and T.S.,
International supply market research for possible alternative sources and
recommendations to Owner/Developer and T.S.
- Preparation of timetable scheduling contract, tendering, bid review and award
periods.
- Preparation of preliminary cash flow in accordance with budget.
- Attendance at T.S. tabletop presentation.
- Review of Mock-up Room inspection Report.
19
- Evaluation and certification of Suppliers' application for payments/invoice in
accordance with the terms and conditions of supply.
- Preparation and submittal to Owner/Developer and T.S. of delivery and
installation schedules in coordination with the construction and handover timetables.
- Monitor deliveries and reconcile with purchase contracts, circulate receiving advisory
to Owner/Developer and T.S.
- Coordinate installation and final placement with respective Consultant
Owner/Developer and T.S., circulate installation report to Owner/Developer and
T.S.
- Prepare final inventory of all FF&E items together with financial reconciliation.
Specialist Consultants
Specialist Consultants include those that are required due to the specific nature or
configuration of a particular project. Requirements for appointing each of these, along
with their Scope of Work, should be discussed and agreed upon between the
Owner/Developer and T.S. This topic is also discussed at the Project Kick-Off
Meeting.
These Specialist Consultants include, but are not limited to the following:
- Curtain Wall / Façade Consultant
- Artwork Consultant
- Golf Course Designer
- Water Features Consultant
- Lagoons Consultant
- Marina Consultant
- Other Specialist Consultants, as required
Structural Engineer
The Structural Engineer’s Scope of Work is not included in this chapter. This
consultant’s deliverables are not required to be submitted to T.S. However, T.S.
may request certain drawings and documents for reference and file purposes.
20
Additional Consultants
The following consultant Scope of Work minimum requirements are included in T.S.
Engineering Recommendations and Minimum Standards (E.R.M.S.) chapter, “Scope of
Work of Consultants”, copy attached for reference.
- Mechanical, Electrical, Plumbing (MEP) Consultant
- Lighting (Interior / Exterior) Designer
- Audio Visual Consultant
- Security Consultant
- Communications Technology Consultant
- Acoustic Consultant
- Vertical Transportation Consultant
- Sustainable Design Consultant
- Fire and Life Safety Consultant
- Testing and Commissioning Consultant
21
Attachment
Scope of Work of MEP Consultants
Introduction
The following document outlines the minimum scope of work that the related key
Consultant each of whose appointment shall require prior approval from T.S. shall
perform in accordance with the letter of appointment issued by the Owner/Developer.
chanical, Electrical, Plumbing (MEP) Consultant
Mechanical, Electrical, Plumbing (MEP) Consultant
5
Phase Five – Tender & Negotiation
- Evaluate the tenders, and assist with the tender interviews and appointment of
Contractor(s).
Lighting Designer
Lighting Designer
6
- Coordinate design details and intent with Architect, Interior Designer, Art Consultant,
Signage Consultant, Audio Visual, MEP Consultants. Prepare diagrams for
integration with the Interior design, Sustainability MEP design.
- Make final amendments to the designs and budgets.
Consultant
Audio Visual Consultant
7
- Prepare a conceptual audio visual study, connected load evaluation, acoustical
zoning and application of new technical trends.
- Give a full presentation, and review the initial design concept.
- Presentation to Owner/Developer of all schematic phase documents for review and approval
or modification,as required.
8
- Coordinate with Contractor on site for final testing, commissioning and training.
- Review the operations manual prepared by the Contractor.
- Prepare final equipment schedule for the hotel maintenance team.
- Perform field inspections and coordinate Contractor handover of the contract works.
9
- Interaction, as required, to obtain all permits and approvals related to security
requirements issued by authorities having jurisdiction over the project and
subsequent hotel operation and implementation of requirements.
- Provision of detailed specifications for systems, materials, equipment and services.
Specifications will be generic, performance related and suitable for competitive
bidding.
- Coordinate the integration of security requirements with all related consultants in
accordance with the design development timetable. Review of documents for
completeness.
- Advisory to Owner/Developer of changes/modifications arising from non-compliance
to Security requirements.
- Preparation and presentation to Owner/Developer and of property and
operational security master plan for review and approval or modification, as required.
10
networks, and the convergence/ integration between these systems and other
systems, as established during the familiarization process. This report must be
submitted to the Owners for reviews.
11
- Review final contract documents, and product certificates (i.e., cables, connectors,
terminal equipment, etc.) prepared by contractor.
- Evaluate tenders and assist in tender reviews and interviews.
12
- Participate in the review of bids, to ensure compliance with the design intent.
- Analyze proposed alternatives and recommendations for acceptance/ rejection.
- Provide standards for testing and commissioning to be followed by a qualified
acoustician.
- Review testing results provided by the acoustician for comment or approval.
- Attend the Testing and Commissioning.
13
Sustainable Design Consultant
14
Phase Three - Design Development
- Provide schematics, drawings, equipment product specifications and preliminary
costing.
- Coordinate and advise Fire and Life safety issues with the Architect, Kitchen, and
MEP consultants to ensure compliance with Owner and local authority
requirements.
- Provide fire modeling of different areas of the building for inclusion to design
document and presentation to Owner and The Operator.
- Coordinate services requirements with the MEP consultant.
- Coordinate the integration of Fire and Life Safety systems with a system integrator.
- Coordinate schedule and Testing and Commissioning (T&C) specifications with the
T & C consultant.
- Attend coordination meetings as necessary and required by the contract.
15
Phase Two - Design Development
- Develop and suggest solutions that lead to minimum maintenance and energy use.
- Attend design review and coordination meetings.
- Coordinate sustainable/green building initiatives with the Sustainability Consultant.
- Provide review of design at 50% CD stage for adherence to Owner’s project design
criteria prior to mid-point of development.
- Make sure the design is commissionable.
- Prepare commissioning plan and detailed specifications.
- Ensure that commissioning requirements are included in construction documents.
- Prepare draft verification test procedures and coordinate T & C schedule with the
overall project schedule.
- Participate in the review of bidding.
- Ensure that all the components necessary for meaningful verification testing (e.g.
temperature and pressure gauges, flow meters, control system interfaces, etc.) are
included in the design.
- Conduct/witness and document verification tests.
- Draft project Handover Certifications to ensure that job is completed in a sequential
manner stage by stage, with all site verifications performed on time, and issues a
copy to T.S.
16
- Verification of all performance parameters of the plant as a system.
- Supervise Integrated Operation Process.
- Ensure provisions and review extended maintenance agreement.
- Calculate overall system efficiency.
- Report results and finding to Owner and T.S.
- Issue a summary together with the report.
17
T.S. Area Programs are developed and issued at various project stages. The first
“Version No. 1” Preliminary Area Program (PAP) is developed following T.S. initial
project evaluation and is an agenda item discussed at the Project Kick-Off Meeting. The
T.S. Area Programs are issued to the Owner/Developer for distribution to and use by
the Design Consulting Team as required.
The Preliminary Area Program will be updated by T.S. through a process of revised
“Preliminary”, “Intermediate”, and ultimately “Final” Area Programs to reflect project
requirements of the Owner/Developer.
The Preliminary Area Program lists the minimum Operational Net Area requirements
for the various operated facilities. Note that these Operational Net Area
requirements will require that estimated net-to-grossing ratios be applied to estimate the
total Hotel Gross Area. However, as this net-to-gross ratio will be dependent on the
actual architectural configuration of the building. The Preliminary Area Program
estimated Hotel Gross Area shown is only provided to assist with preliminary and
conceptual planning.
The T.S. Area Program is the first of several documents which make up the
design guidelines, goals and objectives used by the Design Team. At later phases and
as the project progresses, other guide documents will be developed for the project,
including Food & Beverage Design Briefs, Recreational & Leisure Facility Concepts, etc.
22
Introduction
The term ‘typical guestroom’ applies to a single bay room irrespective of its bed
configuration (king, queen, twin, single, etc.). Club guestrooms have no differing
architectural or design characteristics from a ‘typical guestroom’.
Differences are only found in the service package and amenities provided. The term
‘suite’ applies to a guestroom configured from multiple bays i.e. two bay suite, three bay
suite, etc. The term ‘accessible guestrooms’ applies to guestrooms, which are ‘typical
guestrooms’ that incorporate features to allow handicapped occupants safe enjoyment of
the room and which comply with prevailing codes, and which minimally meet ADA or
internationally recognized accessible design guidelines.
The term ‘corridor’ applies to the corridor leading to and from the ‘guestrooms’ and the
circulation area around the ‘guest elevators’.
Exiting Concepts
All Guestrooms, Suites & Corridor areas must be designed and constructed to be in full
compliance with NFPA 101 or its subsequent revision.
These requirements include but are not limited to the following examples:
- Each area and level within that area must be provided with a primary means of
egress that provides a continuous, unobstructed and protected path to the
outside of the building.
23
Space Design Requirements
All guestroom and suite materials, components, assemblies and construction methods
must achieve a minimum fire resistant rating of thirty (30) minutes.
All emergency exit route materials, components, assemblies and construction methods
must achieve a minimum fire resistant rating of ninety (90) minutes.
Minimally provide life safety systems, emergency lighting and signage in accordance
with T.S. Engineering Recommendations and Minimum Standards.
All doors positioned on emergency exit routes must be minimally equipped with
electromagnetic or solenoid hydraulic hold open devices interfaced and controlled by
central life safety system or localized dual-ionization and optical detection devices.
All doors leading to exits must open in the direction of travel. Doors leading into
staircases must open into the staircase well housing a closed tread and riser staircase
with a continuous running handrail. Single exit door width must be a minimum of 1000
mm with a minimum closed stair tread width of 1200 mm. Double width exit doors must
be a minimum of 1800 mm with a minimum closed stair tread width of 2200 mm. All door
landings must be positioned perpendicular to the stair treads. Opening of the exit doors
must not impede the stairway or landing area. All doors must be equipped with self
closing devices and non-lockable hardware except where exiting directly to building
exterior. At these locations, exiting route must be unlockable and equipped with a panic
device; entry from exterior must be lockable.
Minimum height to upper surface of top rail for all balconies, parapets, guardrails etc.,
must be between 1005 - 1015 mm AFFL with handrails located between 850 - 960 mm
AFFL.
Guestrooms are typically located either vertically floor by floor, or in the case of a resort,
horizontally, individually or in small multiple unit clusters. Multiple Bay Suites should be
located at building corners where appropriate bay configurations and external views can
be achieved.
It is recommended to minimize the varying room types, i.e. rooms, which do not share
common dimensions and elements and that common room types and room
configurations are vertically stacked. Suites should be distributed evenly throughout the
guestroom floors or clusters and not concentrated on one level or within certain clusters.
It is also recommended that the service shaft is positioned in order that it may serve two
adjacent guestrooms and one common, corridor side, access door. T.S. Engineering
Recommendations and Minimum Standards for service shaft requirements.
24
The specific room quantity and configurations will be confirmed in the Preliminary Area
Program issued by T.S.
The composition and square meterage dedicated to these areas will vary according to
the overall bay size and geometry.
A suite would minimally have the above four components and dependant on overall size,
also incorporate:
- Guest’s powder room
- Separate dining area
- Separate kitchen/pantry area
- Separate living area
- Separate study area
Dependant on architecture and minimally in all resorts each room and suite would also
have:
- Exterior balcony
Typical Guestroom
Entrance Area
- Guestroom entry door minimally equipped with:
- Rebated door frame and door panel equipped with door frame acoustic seal
and door panel acoustic seal.
- Door chime interfaced with Do Not Disturb indicator and integrated with room
number plaque on adjacent wall.
- Lighting control switch/dimmer for all guestroom areas
- Emergency escape route instructions.
25
- Key card master switch/energizer control, DND control and lighting control
switch/ dimmer for all guestroom areas.
Living/Sleeping/Study Area
- Minimum ceiling height 2800 mm.
- Lighting control switches/dimmers at both sides of the bed area for all guestroom
areas.
- Temperature and fan speed control.
- Lighting control switches/dimmers at desk area for adjacent fixtures.
- Duplex power outlets at each side of the bed area, including additional easily
accessible duplex outlet for mobile phone/laptop charging.
- Duplex power outlets above and below the desk in the study area. The outlet
above the desk to have universal configuration.
- Additional duplex power outlets in accordance with T.S. ER&MS
requirements.
- Exterior glazing must minimally incorporate an operable section provided with
limiter and F.C.U. cut out micro switch.
- Bathtub:
- Cast iron or cold pressed steel, baked porcelain finish with non-slip base and
sound suppressant insulation.
- Minimum interior dimensions are 1600 x 650 x 420 mm.
- Pop up drain with integrated strainer.
- Covered overflow located below bathtub rim level or optional overflow into
adjacent deck drain or floor drain.
- Faucet set with anti-scald feature, hot and cold water indicators and
integrated flow diverter to hand held shower with wall bracket or retracting
mechanism into tub base.
- Minimum one towel bar within reach of the bathtub.
- Wall mounted grab bar.
- Shower cubicle:
- Minimum internal dimensions for four fixture bathrooms, 1100 x 1000 mm and
for three fixture bathrooms, 1500 x 1100 mm with non-slip recessed floor.
- All glazing elements must minimally be frameless tempered and laminated
glass.
26
- Minimally equipped with rotary style thermostatically controlled or optional
digital thermostat faucet set with anti-scald feature, hot and cold water
indicators supplying one ceiling or wall mounted, adjustable stream (spray,
pulse, full action) showerhead or one rainwater/deluge showerhead.
Recommended additional hand held shower located on wall mounted sliding
rail. All controls, temperature, volume and divertors must be reachable
without having to enter the area of the water flow.
- Recommended wall mounted mirror, self draining amenity shelf and separate
grab rail.
- Minimum one towel bar within reach of the area of the shower.
- Flush, non-abrasive stainless steel covered floor drain located at perimeter or
rear corner of cubicle. Floor to be positively cambered to fall to drain.
Recommended to avoid threshold at entry to cubicle. If required, threshold
must be smooth profiled with 40 mm radius.
WC Area:
- Minimally located in separate room, minimum interior dimensions 1100 x
1600 mm, with full height door, equipped with privacy lock with external
override feature.
- Minimally provide vitrified porcelain WC, rear discharge connection with
concealed cistern. Integrated seat and cover. Provide toilet roll holder with
integrated cover plate.
- Where required by local code or custom: vitrified porcelain bidet, rear
discharge, integrated faucets and direction nozzle.
- Minimally provide wall mounted telephone in accordance with T.S.
Telephone Equipment Schedule.
Provide lighting control switches/dimmers at bathroom entry for all lighting fixtures.
27
Bathroom Dry/Wardrobe/Dressing Area
- Clothes wardrobe with dimensions 1500-1800 width mm x 800 mm depth,
accessible from living and bathroom area. Interior of wardrobe minimally fitted
with built-in drawers, hanging rod and top shelf, tie rack, shoe rack, wall mounted
ironing board, and iron. Top of drawer unit and adjacent walls fitted with stainless
steel protection rails.
- Minimum full length tempered glass mirror.
- Minimum ceiling height 2400 mm.
Suites
Provide the following additional elements in suites:
28
Exterior Balcony
- Minimally 2500 mm deep width equal to span of guestroom bay. Provide
architectural element acting as side screens.
- Minimally provide balustrade with a minimum height of 1100 mm with integral
uprights and horizontals at a maximum of 100 mm centres.
- Provide overhead or wall mounted lighting fixtures.
- Equip exterior door with F.C.U. cut out micro switch.
- Floor drain.
- Seating/ chaise lounge group.
Guestroom Corridors
- All materials, components, assemblies and construction methods must achieve a
minimum fire resistant rating of ninety (90) minutes.
- Minimally provide life safety systems, emergency lighting and signage in
accordance with T.S. Engineering Recommendations and Minimum
Standards
- All doors positioned in the corridor route must be minimally equipped with
electromagnetic or solenoid hydraulic hold open devices interfaced and
controlled by central life safety system or localized dual-ionization and optical
detection devices.
- Minimum ceiling height 2500 mm.
- Minimum widths must be 1600 mm for single loaded, 1800 mm for double
loaded.
- Provide centrally dimmable or system controllable lighting control for independent
circuits supplying ceiling and wall mounted lighting fixtures.
- Provide an architectural detail and protective finish material selection throughout
corridor area.
29
- Fire fighting devices, hose reels, extinguishers should be contained in recessed
cabinets.
- BOH, maids' pantries, storerooms and other rooms leading off the corridor must
present an integrated design solution with a typical guestroom entry.
- Locate guest accessible ice dispenser in separate room adjacent to corridor.
Provide hard flooring surface with floor drain.
Guest Elevators
- All guest elevators are to be in accordance with T.S. Engineering
Recommendations and Minimum Standards.
Floors
Natural Stone R R R M
Ceilings
Painted Gypsum M M M M
Lighting
- Minimally provide master or card reading energizer switch control of fixtures with
separate circuitry and local three way or programmable system control for walls
and ceiling fixtures in entry, living, sleeping and bathroom areas.
- Locate master switches at bedside and main entry areas.
- Sleeping area must minimally be provided with separate circuitry/switching for left
and right hand sides.
- Minimally provide waterproof fixtures in bathroom wet area.
- Provide low wattage night light fixture to gently illuminate entry/bathroom areas.
- Minimally provide a balance of ceiling, wall and free standing fixtures.
- Use only incandescent or low voltage halogen/led bulbs.
- Coordinate with Lighting Consultant.
Telephone
- Minimally provide jacks at: Bathroom x 1, Sleeping area x 2, Desk x 2.
- Locate desk telephone jack below desk with cable management system
integrated into desk design and separate readily accessible data jack for high
speed Internet access above and adjacent to desktop.
- Minimally provide handsets in accordance with T.S. Engineering
Recommendations and Minimum Standards.
- Coordinate with MEP Consultant and T.S. Engineering Recommendations
and Minimum Standards.
Electrical
- Minimally provide 15 amp grounded power outlets throughout all areas.
- Minimally provide earth leakage protected universal power shaver outlet adjacent
to bathroom vanity counter.
- In addition to local power outlets provide a minimum of two universal power
outlets at desk and bedside areas. Ensure adequate spacing between duplexed
outlets to allow concurrent use of power transformers and equipment
accessories.
- Coordinate with MEP Consultant and T.S. Engineering Recommendations
and Minimum Standards.
31
Door Lock, Do Not Disturb, Energy Management System
- Minimally provide contact Smart Card or contact less transponder type lock
system with integrated lock set and card reader.
- Minimally coordinate Do Not Disturb system with exterior room number sign and
door chime. Minimally provide individual guestroom energy management system.
- Coordinate with MEP Consultant and T.S. Engineering Recommendations
and Minimum Standards.
Miscellaneous FF&E
- Coordinate millwork and free standing FF&E items to minimally accommodate:
– Refrigerated mini-bar cabinet or drawer.
– Mini-safe.
– Hot water kettle/coffee/espresso maker.
– Wall or stand mounted LCD Television. Screen dimensions to be coordinated
with viewing distance.
– Coordinate all items with T.S. Product Specifications.
HVAC
- Minimally equip each guestroom bay with heating and cooling fan coil unit.
Multiple units for suites must be equipped with parallel controls in open locations
and individual controls in individual rooms.
- Minimally provide one lockable access panel, integrally designed with adjacent
elements.
- Minimally provide one horizontally and vertically adjustable supply air grill,
integrally designed with adjacent elements.
- Provide return air path via entrance area ceiling plenum duct/linear slot diffuser.
- Provide control panel for fan speed and temperature with digital readout of
temperature set level and current room temperature.
- Provide exhaust air path via bathroom area ceiling plenum duct/ linear slot
diffuser.
- Coordinate with MEP Consultant and T.S. Engineering Recommendations
and Minimum Standards.
32
Material Usage for Guestroom Areas
The following table details materials that are suitable for Guestroom areas. Those
materials, which are indicated as 'minimum' must be utilized, others which are either
indicated as 'recommended' may be utilized appropriately with prior consultation and
approval from T.S.
Introduction
The Mock-Up Room is an important milestone in the design process of the Typical
Guestroom. The completed Mock-Up Room is a true constructed representation of how
the actual room will appear to a guest checking in.
The Mock-Up Room is guided by the Interior Design Consultant to illustrate the design
intent; whereas, the Prototype Room discussed in the Prototype Room chapter
represents the first actual constructed room for approvals.
This process allows The Operator and the Owner/Developer to see and approve an actual
design early in the process and before the actual building is constructed. In addition, the
Owner/Developer will have received an anticipated construction and FF&E cost report
prepared by the General Contractor or Fit-Out Contractor and FF&E Purchasing Agent.
The appropriate value engineering steps can then be identified and incorporated during
the Design Development phase, thus allowing the final Guestroom to remain within
budget.
The Owner/Developer and the Design Consultants are responsible for constructing and
finishing the room.
34
Process
The Mock-Up Room shall be constructed either on-site or off-site and composed of a
King Guestroom with connecting door to Twin Guestroom and Corridor section.
The Mock-Up Room is constructed following the completion and approval of the Interior
Design Phase II documentation and all related architectural and MEP documents and
contains all:
- Architectural work
- Interior Fit-Out, Millwork and FF&E
- All MEP and life safety installations
- Miscellaneous operating equipment
At this stage the Owner/Developer will typically have appointed a General Contractor or
Fit-Out Contractor whose responsibility would be to complete the Mock-Up Room in
accordance with the above documents. The Mock-Up Room must be constructed at or
near the site, and oriented similarly to actual construction. The construction should
include the proposed exterior glazing system, and mechanical, electrical and plumbing
connections.
Whilst on-site locations may not be possible, off-site locations must ensure that the
completed Mock-Up Room is secured and weatherproofed and available for continued
reference until such time that the Prototype Room is completed.
A major component of the two Guestrooms and Corridor include all the FF&E items
specified by the Interior Designer. The Owner/Developer, General Contractor or Fit-Out
Contractor may use this opportunity to commission specialist FF&E
Manufacturers/Suppliers to manufacture, deliver and install FF&E items as part of the
bid selection process that is required to identify a successful vendor.
The Operator will assist the Owner/Developer in sourcing other items of FF&E, which are not
included as part of the Interior Designer’s package. A sample Review & Inspection
Checklist is included later in this section.
Review
The Mock-up Room Review represents a major milestone in the project timetable and
the following key activities must be completed:
This progress should be reported and the review date confirmed to all relevant parties.
35
Approximately one week prior to the review the Interior Designer should be present to
assist with the assembly and positioning of the room components and to fine-tune and
accessorize the room. The Interior Designer shall then review the room to ensure the
original approved design intent has been achieved and that the components are indeed
ready for review.
This two step review is structured over two full days including time required for Operator to
conduct a detailed photographic survey, which will support their written inspection.
- Day One: Interior Designer’s Presentation to Owner/Developer and Operator
- Day Two: Review of Architectural, Interior Fit-Out, and MEP. This review is
generally attended by The Operator, Architect, General Contractor or Fit-Out Contractor,
Interior Designer, MEP Consultant. Conduct photographic record of Mock-Up
Room.
In addition to operators Review & Inspection Checklist, each Consultant shall prepare their
own report, which shall incorporate all the agreed comments together with their own
action notes required to trace the revisions of their design documentation.
The observations and comments from these reviews will be mutually agreed upon by the
Owner/Developer and Operator. Depending on the extent and nature of these comments
the Owner/Developer and The Operator may:
- Approve the Mock-Up Room subject to incorporation of comments
or
- If extensive modifications are required the existing Mock-Up Room shall be
physically modified and re-inspected at a later date.
36
Attachment
Mock-Up Room
- Mock-Up & Prototype Room Procedures
Mock-Up & Prototype Room Procedures
- Interior Designer
Design Documentation - Architect
- MEP
- Lighting Designer
- Source
Material Specifications - Construct
- Install
- King
Mock-Up Review - Twin
- Corridor
- King
Mock-Up Room Approval Mock-Up Re-inspect - Twin
- Corridor
Design/Construction
Documentation
Contracts Awarded
- Source
Material Specifications - Construct
- Install
Contract Correction
Report Circulation
Modify
- Wardrobe Checklist
- Bedroom Checklist
- Bathroom Checklist
37
Attachment
Mock-Up Room Review & Inspection
Checklists
- FF&E Requirements for Mock-Up Rooms
- Corridor Checklist
- Entrance Area Checklist
- Wardrobe Checklist
- Bedroom Checklist
- Bathroom Checklist
FF&E Requirements for Mock-Up Room Schedule
Item Qty. Qty.
Area Group Action Description King Twin Coordinate
Entry HESB OC/DV Amenity tray 1 1 Interior Designer/Operations
Abbreviations: H Operator
Operations Regional Office/Specialist
OC/DV Owning Company/Developer
MEP MEP Consultant/Contractor
HESB Hotel Equipment Specification Book
Inventory Hotel consumable item inventory (non-FF&E budget)
Project Name
Mock-Up Room Review & Inspection Checklist
Corridor Checklist
Qualifications: OK = Acceptable X = Not Acceptable M = Missing NR = Not Reviewed
NA = Not Applicable
Abbreviations: GC = General Contractor ID = Interior Designer Arch = Architect OC = Owning Company
T.S. = Technical Services
C 1.10 Sprinklers
– ceiling or wall type
– recessed
– cap finish
– alignment
C 1.12 Walls
– painting
– wall coverings
C 1.14 Baseboard
– profile
– dust accumulation
– hardwood edges
C 1.17 Artwork
– secure mounting detail
– anti-theft
– frame finish
Ref. No. Subject Q Comments Action By Photo No.
C 1.18 Wall Lighting
– circuitry
– dimming/set back
C 1.21 Flooring
– specification compliance
– installation
C 1.24 Plant/Planter
– location
C 1.33
C 1.34
C 1.35
END
Project Name
Mock-Up Room Review & Inspection Checklist
King Entrance Area Checklist
Qualifications: OK = Acceptable X = Not Acceptable M = Missing NR = Not Reviewed
NA = Not Applicable
Abbreviations: GC = General Contractor ID = Interior Designer Arch = Architect OC = Owning Company
T.S. = Technical Services
E 2.15 Sprinklers
– ceiling or wall type
– recessed
– cap finish
– alignment
E 2.23 Walls
– paint
– wallcovering
E 2.24 Baseboard
– profile
– dust accumulation
– hardwood edges
E 2.25 Ceiling
E 2.30 Artwork
– scale
– secure/anti-theft mounting detail
– frame finish
E 2.31
E 2.32
E 2.33
END
Project Name
Mock-Up Room Review & Inspection Checklist
King Wardrobe Checklist
Qualifications: OK = Acceptable X = Not Acceptable M = Missing NR = Not Reviewed
NA = Not Applicable
Abbreviations: GC = General Contractor ID = Interior Designer Arch = Architect OC = Owning Company
T.S. = Technical Services
W 3.7 Baseboard
W 3.8 Rod
– height
– hanger clearance (front and rear)
– material
– finish
– stability
W 3.14 Drawers
– cut out (view contents)
– glides
W 3.16 Lighting
– heat
– location
– intensity
– focus
– type
END
Project Name
Mock-Up Room Review & Inspection Checklist
King Bedroom Checklist
Qualifications: OK = Acceptable X = Not Acceptable M = Missing NR = Not Reviewed
NA = Not Applicable
Abbreviations: GC = General Contractor ID = Interior Designer Arch = Architect OC = Owning Company
T.S. = Technical Services
B 4.1 Flooring
– specification compliance
B 4.2 Walls
– paint
– wallcovering
B 4.4 Ceiling
– fixture alignment
B 4.5 Cornice
B 4.7 Baseboard
– profile
– dust accumulation
– hardwood edges
B 4.10 Sheers
– specification compliance
– manual/motorized
– fire retardant
– height AFFL
B 4.11 Drapery
– manual/motorized
– fire retardant
– blackout attached/removable
– overlap runners
– height AFFL
Bedside:
– location & height above & below
– clearance for adaptor or transformer
– duplex universal power
– telephone
– finish
B 4.22 Ottoman
– height/ergonomics
– scale/proportion
– fabric content & treatment
Ref. No. Subject Q Comments Action By Photo No.
B 4.23 Cocktail Table
– height/ergonomics
– scale/proportion
– top material/durability
B 4.29 Clock/Alarm
– scale/legibility/illuminated
– functionality
B 4.31 Headboard
– ergonomics/scale
– functionality/comfort
– finish material/durability
Ref. No. Subject Q Comments Action By Photo No.
B 4.32 Mattress & Box Spring
– height & alignment of bedside table
– frame, glides/casters
– to conform with T.S. Product
Specification
B 4.34 Duvet
– to conform with T.S. Product
Specification
B 4.36 Artwork
– scale
– secure/anti-theft mounting detail
– frame finish
B 4.41 Sprinklers
– ceiling or wall type
– recessed
– cap finish
– alignment
Ref. No. Subject Q Comments Action By Photo No.
B 4.42 Telephone (desk)
– functionality and features
– scale/appearance/color
– connection to outlet & cable finish
– power outlet
B 4.46 TV
– size, brand appropriate, & room
viewing ratio & angle
– built-in DVD player
– multiple HDMI/USB/Bluetooth
connectivity
– remote control field
– cable management
– ITV control box location
– connection to outlet & cable finish
– wall bracket, pan & tilt
– wall bracket, ITV control box
B 4.74
B 4.75
B 4.76
END
Project Name
Mock-Up Room Review & Inspection Checklist
King Bathroom Checklist
Qualifications: OK = Acceptable X = Not Acceptable M = Missing NR = Not Reviewed
NA = Not Applicable
Abbreviations: GC = General Contractor ID = Interior Designer Arch = Architect OC = Owning Company
T.S. = Technical Services
BA 5.6 Threshold
– profile
– material
BA 5.22 WC
– color match
– water saving device
BA 5.24 WC Door
– finish
– latch/levers, hinges and stopper
– hardware finish
BA 5.26 WC Light
– alignment
– intensity
– reflector color
BA 5.27 WC Telephone
– alignment
– height
– cable management
BA 5.29 Sink
– color match
– material
BA 5.30 Sink Drain
– overflow drain/drain stopper
Ref. No. Subject Q Comments Action By Photo No.
BA 5.31 Sink Faucet/Mixer
– location/access
– temperature indicator
– finish
BA 5.40 Exhaust
– location, WC/shower
– grill/diffuser/shadow gap
– blackout
– noise level
BA 5.43 Speaker
– location
– clarity
BA 5.57 Bathrobes
– quantity
BA 5.60 Hide-A-Line
– location
BA 5.65 Artwork
– scale
– secure mounting/anti theft
– frame finish
BA 5.68
BA 5.69
BA 5.70
END
Attachment to this chapter:
- Mock-Up & Prototype Room
Procedures
Introduction
The purpose of the Prototype Room, which follows the approval of the Mock-up Room
and precedes the mass fit-out of the guestrooms on site, is to ensure continuity of the
approved design and to establish and record the agreed quality of workmanship and
materials. Prototype Rooms must be completed on site, and generally within the actual
building structure.
The term “Prototype Room” is used to describe the constructed minimum provision on
site of a Typical Guestroom, in full compliance with the Design Recommendation and
Minimum Standards and following the approved Mock-up Room presentation.
A typically representative room, as the most common type and configuration, is required
to include:
- All architectural and finishing materials
- All MEP and life safety systems, installed and functional
- All FF&E items
- All artwork, artifacts, & accessories
- All lighting
The Prototype Room must minimally be completed, inspected and approved by T.S.
and the Owner/Developer prior to constructing any other guestrooms. This procedure
will minimize the repetition of incorrect/non-approved design, construction errors and/or
poor quality of workmanship, all of which will require remedying prior to handover to the
Hotel Operator and final completion.
The primary objectives of the Prototype Room are to ensure that the design intent
approved at the Mock-up Room and in subsequently approved documentation is
implemented for final construction. The room also serves to establish and record that the
quality of workmanship and materials remains in compliance with
Design Recommendations and Minimum Standards.
38
Once the Prototype Room is completed and approved, it must be maintained in a secure
and tamperproof condition to be used as a benchmark reference and quality control for
all constructed guestrooms.
An inspection involving the participation of the Owner/Developer and The Operator International
provides for confirmation of approved intent and the acceptance of quality of
workmanship and materials or for mutually agreed issues to be recorded for remedy.
A more detailed inspection will be conducted by Operator using a similar pre-set point by
point checklist that was utilized for the Mock-Up Room inspection.
The room will also be photographically recorded and the reports circulated to the
attending parties.
39
Prototype Room Approval
Dependant on the extent and nature of the comments from the initial and detailed
inspections, the Owner/Developer and The operator may approve the room or
require that the room be physically modified according to the comments as soon as
possible.
40
Attachment
Prototype Room
- Mock-Up & Prototype Room Procedures
Mock-Up & Prototype Room Procedures
- Interior Designer
Design Documentation - Architect
- MEP
- Lighting Designer
- Source
Material Specifications - Construct
- Install
- King
Mock-Up Review - Twin
- Corridor
- King
Mock-Up Room Approval Mock-Up Re-inspect - Twin
- Corridor
Design/Construction
Documentation
Contracts Awarded
- Source
Material Specifications - Construct
- Install
Contract Correction
Report Circulation
Modify
The architecture of the building together with the interior design concepts and the scale
of the property will identify the configuration of the Public Areas. Specific requirements
for the referenced project will be confirmed in the Preliminary Area Program issued by
T.S.
All public area materials, components, assemblies and construction methods must
achieve a minimum fire resistant rating of thirty (30) minutes.
All emergency exit route materials, components, assemblies and construction methods
must achieve a minimum fire resistant rating of ninety (90) minutes.
Minimally provide life safety systems, emergency lighting and signage, and security
systems in accordance with T.S. Engineering Recommendations and Minimum
Standards.
All doors positioned on emergency exit routes must be minimally equipped with
electromagnetic or solenoid hydraulic hold open devices interfaced and controlled by
central life safety system or localized dual-ionization and optical detection devices.
All doors leading to exits and along exit ways must open in the direction of travel,
including exit doors entering stairwells and to the building exterior. Exit stairs are to
41
include a closed tread and riser stair detail and a continuous handrail. Single exit door
width must be a minimum of 1000 mm with a minimum closed stair tread width of 1200
mm. Double width exit doors must be a minimum of 1800 mm with a minimum closed
stair tread width of 2200 mm. All door landings must be positioned perpendicular to the
stair treads. Opening of the exit doors must not impede the stairway or landing area. All
doors must be equipped with self closing devices and non-lockable hardware except
where exiting directly to building exterior. At these locations, exiting route must be un-
lockable and equipped with a panic device; entry from exterior must be lockable.
Minimum height to upper surface of top rail for all balconies, parapets guardrails etc.,
must be between 1005 - 1015 mm AFFL with handrails located between 850- 960 mm
AFFL.
Provide a digital music server based background music system in accordance with
T.S. Engineering Recommendations and Minimum Standards.
The use of fluorescent and or PL type lamps in lighting fixtures is not acceptable.
All Public Area show kitchen, bar, pantry, public toilets and other ''wet'' areas are to be
minimally provided with anti-fracture waterproof membranes at all walls and floors.
Entry and circulation throughout public areas by disabled guests and visitors is minimally
required. All facilities should comply with prevailing local codes or minimally meet
international accessible guidelines.
It is essential that the Public Areas present a cohesive practicality and operational
effectiveness whilst still retaining a unique design element.
Exiting Concepts
All Public areas must be designed and constructed to be in full compliance with NFPA
101 or its subsequent revision.
These requirements include but are not limited to the following examples:
- Each area and level within that area must be provided with a primary means of
egress that provides a continuous, unobstructed and protected path to the
outside of the building.
- Alternative/secondary means of exit shall be provided at each building level or
where the maximum allowable travel distance from the occupied area has been
reached or exceeded.
- Each means of egress provides a flow/direction of travel leading from the
occupied area to the outside of the building.
- The exit discharge shall be at grade.
42
Space Design Requirements
Porte-Cochere and Entry
- Minimum ceiling height of 2800 mm.
- Minimally provide a porte-cochere for vehicular and pedestrian arrivals. The extent of
coverage will be largely dependent on the building’s scale, location and external
traffic flow.
- Minimum ceiling/vertical clearance 5000 mm.
- Minimally provide illuminated external signage at entry level, on building facade and
at rooftop level. Scale of signage and material usage will be in harmony with building
exterior and in full compliance with The Operator Brand Manager guidelines on signage.
- Minimally provide two vehicle lanes: one for passenger loading and unloading and
one for traffic flow through. In larger hotels a third lane may be required for
passenger loading.
- Minimally provide traffic flow, warning, clearance and safety signage as required.
- Provide a parking and valet car delivery waiting area.
- Taxi waiting should not be allowed in the Porte Cochere. Provide a remote waiting
area with a call signal system.
- Ensure separation of pedestrian and vehicular traffic by use of differing grade levels,
materials and barriers, as appropriate to the arrival area.
- In properties where required, provide a minimum of 3 and a maximum of 5 flag poles
with lockable internal halyard systems.
- If required by T.S. Preliminary Area Program, provide awaiting and loading areas
for buses and coaches. Provide a drivers waiting lounge.
- Where appropriate with climatic conditions, provide external spot heating at porte-
cochere canopy.
- Provide entry doors and vestibules sized suitably for arrivals, luggage handling, and
security screening. Vestibules are to be HVAC and temperature controlled, as
required. Hinged, balance, or sliding doors are preferred, with revolving doors
discouraged.
- Provide a separate entry from the Guest doors for luggage handling carts.
- Entry doors should provide direct access to the Lobby.
- Luggage entry should provide direct access to luggage security screening, secured
storeroom, and service elevator. See also T.S. requirements for Security
screening and luggage handling.
- Minimally provide recessed walk-off dirt catcher mats at all entry areas. Coordinate
material selection and finish with interior design.
- All entry doors must be fully compliant with prevailing codes and minimally meet
international accessible guidelines.
43
Lobby
- The Hotel is to have a separate arrival area and lobby from all other uses in mixed
use developments.
- Provide separate arrival lobbies for Hotel, Banqueting Facilities and Serviced
Apartments (other areas may require separate lobby such as at hotel, with MICE
business, airline crew, etc.).
- Minimum ceiling height 5000 mm, subject to the volume of the space, and as
appropriate for specific projects.
- Provide adequate circulation space through the entry sequence and Lobby areas,
and Front Desk.
- Minimally provide seating groups throughout Lobby Areas, occasional tables for
house phone locations, and human scale lighting.
- Minimally provide adequate directional, location and advisory signage in both local
and English languages throughout all areas.
44
- Locate Guest Service Center clerks’ station behind but with clear vision to the
Reception Area. Equip stations with chairs and desks suitably coordinated with
PABX, data and auxiliary equipment requirements in accordance with T.S.
Telephone and Computer Equipment Schedules. Provide acoustic partitions.
- Locate rental offices and boardroom within Business Center and equip with desks,
boardroom table, chairs, and credenza. Provide data, voice and audio/visual
requirements as detailed in T.S. Engineering Recommendations and Minimum
Standards.
Public Toilets
- Minimum ceiling height 2800 mm.
- Provide a minimum of one Male and one Female Public Toilet for all public areas.
- All toilet areas are to be accessible by disabled guests. Provide a minimum of one
accessible water closet and one lavatory at each location, one set each for male and
female.
- The required water closets and hand wash basins shall be distributed between the
sexes based on the percentage of each sex anticipated in the occupant load. The
occupant load shall be composed of 50 percent of each sex, unless statistical data
provided by the Owner / Developer indicates a different distribution of the sexes.
- Minimum quantities must comply with the criteria in the following chart or in
accordance with local codes, whichever is the greater.
45
- Minimum space zoning configuration per Public Toilet Room:
- Entry vestibule, HVAC air lock area
- Hand wash basin, vanity mirror, hand dryer, towel area
- Seated dry vanity/make-up mirror area (female only)
- Urinals area (male only)
- WCs compartment area
- Provide signage at vestibule area.
- Hand wash basin to be minimally equipped with natural stone vanity counter and
back splash, under mounted wash hand basins, electronically activated hot and cold
faucets, integrated soap dispenser, full width mirror mounted over counter.
- Provide paper towel dispensers and waste receptacles.
- Provide electrically heated and sanitized hand dryers, wall mounted.
- Minimally pitch natural stone floor, slope to floor drain located under vanity counter.
- Seated dry vanity area to be minimally equipped with natural stone vanity counter,
full width mirror mounted over counter, wall and ceiling light fixture, upholstered
vanity stools.
- Provide full-length mirror on adjacent wall.
- Provide wall mounted artwork.
- Provide wall mounted individual urinals with:
- Privacy wings
- Electronic flush mechanism
- Minimally pitch natural stone floor, slope to floor drains located under urinals
- Detail wall above urinals to provide ledge/shelf at +1600 mm AFFL
- Minimally provide WC compartments with:
- Doors and partitions, full height
- Minimum compartment dimension 850 x 1500 mm
- WCs to be equipped with hidden cistern tank and electronic flush valve
- Detail wall behind WC to have ledge / shelf at +900 mm AFFL
- Minimally provide coat hook, privacy lock, hold open cam with hinges, double
toilet roll dispenser, and disposable seat cover dispenser.
- Minimally finished with natural stone floor pitched to fall to concealed floor drain
- Provide Janitors Closet with lockable storage cabinet.
Cloak Rooms
- Minimum ceiling height 2800 mm.
- Minimally provide one cloakroom per Public Area level.
46
- Serviced Cloakroom must be provided with an issue counter at 1050 mm AFFL
equipped with interior lockable sliding or hinged panels above to be fully coordinated
and integrated in accordance with T.S. Millwork Design Guidelines.
- Provide access via lockable entry door.
- Provide screen walls behind Issue Counter to prevent vision into Cloakroom interior.
- Interior of Cloakroom must be provided with hanging rails suspended 1700mm AFFL,
wall mounted over shelves, lockable cabinets and drawers.
- Coordinate lighting of Cloakroom interior.
47
Introduction
Food and Beverage outlets and banqueting facilities are to be located adjacent to and
directly accessible from the Public Areas. Depending on the extent of the project, some
food and beverage outlets may minimally require or be provided with a separate direct
street access. All banqueting facilities with a capacity greater than 300 persons must
minimally be provided with separate street access, lobby and if necessary
elevator/escalator service.
Entry and circulation throughout all food & beverage outlets and banqueting facilities by
disabled guests and visitors is minimally required. All facilities should comply with
prevailing local codes or minimally meet internationally recognized disabled design
guidelines.
All emergency exit route materials, components, assemblies and construction methods
must achieve a minimum fire resistant rating of ninety (90) minutes.
Minimally provide life safety systems, emergency lighting and signage in accordance
with T.S. Engineering Recommendations and Minimum Standards.
All doors positioned on emergency exit routes must be minimally equipped with
electromagnetic or solenoid hydraulic hold open devices interfaced and controlled by
central life safety system or localized dual-ionization and optical detection devices.
All doors leading to exits must open in the direction of travel. Doors leading into
staircases must open into the staircase well housing a closed tread and riser staircase
with a continuous running handrail. Single exit door width must be a minimum of 1000
mm with a minimum closed stair tread width of 1200 mm. Double width exit doors must
be a minimum of 1800 mm with a minimum closed stair tread width of 2200 mm. All door
landings must be positioned perpendicular to the stair treads. Opening of the exit doors
must not impede the stairway or landing area. All doors must be equipped with self
closing devices and non-lockable hardware except where exiting directly to building
exterior. At these locations, exiting route must be unlockable and equipped with a panic
device, entry from exterior must be lockable.
48
Minimum height to upper surface of top rail for all balconies, parapets, guardrails etc.,
must be between 1005 - 1015 mm AFFL with handrails located between 850 - 960 mm
AFFL.
To ensure ease of circulation adequate directional signage in both local and English
languages to all food and beverage outlets, banqueting and public facilities including
toilets, reception, lobby, cloakroom, etc. must be provided. Location signage must
minimally be provided to uniquely identify each outlet, banqueting and meeting room.
Banquet and Meeting Room directories at main circulation areas must be provided to
allow change of information and messages to be displayed. Location signage at each
banqueting and meeting room must also minimally be detailed to allow change of
information and indication of room-in-use.
The Preliminary Area Program issued by T.S. will provide the detailed requirements
including square meterage, seat count, internal zoning. Additional conceptual
requirements will be detailed in the Food & Beverage Design Brief issued by T.S.
All kitchen, bar, pantry, public toilets and other ''wet'' areas are to be minimally provided
with anti-fracture waterproof membranes at all walls and floors.
Provide a digital music server based background music system to all areas in
accordance with T.S. Engineering Recommendations and Minimum Standards.
The use of fluorescent and or PL type lamps in lighting fixtures is not acceptable.
Exiting Concepts
All Food & Beverage areas must be designed and constructed to be in full compliance
with NFPA 101 or its subsequent revision.
These requirements include but are not limited to the following examples:
- Each area and level within that area must be provided with a primary means of
egress that provides a continuous, unobstructed and protected path to the
outside of the building.
- Alternative/secondary means of exit shall be provided at each building level or
where the maximum allowable travel distance from the occupied area has been
reached or exceeded.
- Each means of egress provides a flow/direction of travel leading from the
occupied area to the outside of the building.
- The exit discharge shall be at grade.
49
Space Design Requirements – Food & Beverage Outlets
The scale and diversity of the Food and Beverage Outlets will be unique to the
referenced project. A detailed requirement will be contained within the Preliminary Area
Program issued by T.S.
Food and Beverage outlets can be further defined as restaurants and bars. Restaurants
can be categorized as:
- All Day Dining Restaurant
- Specialty Restaurant
- Lobby Lounge
- Pool Restaurant
While the interior design concepts of each restaurant will be a unique reflection of the
Food & Beverage Design Brief, restaurants are generally zoned according to the
following criteria:
- Reception, Hostess/Cashier, Waiting
- Locate at point of entry/exit.
- Minimally all restaurants to be architecturally detailed to allow secure closure
of the area.
- Minimum ceiling height 3000 mm.
- Locate Hostess/Cashier Station.
- Provide reach-in cloak/bag closet.
- Minimally provide adjacent seating group.
- Provide millwork item, furniture piece to locate menus, stationery, cashiering
system equipment, audio-visual and lighting system controls as required.
- Holding Bar
- Locate adjacent and with visual connection to entry reception.
- Provide mixture of bar seating, group seating.
- Coordinate bar requirements with “Bar space design requirements.”
- Dining Area
- Minimum ceiling height 3000 mm.
- Provide differing floor levels, low height partitions, seating groups, banquette
seating. Provide table sizes and configurations in accordance with Food &
Beverage Design Brief.
50
- Provide integrated service stations to be fully co-ordinated with Interior
Designer and Kitchen Consultants. Locate tea/coffee making facilities,
counter top sink, undercounter refrigerator, warming cabinet, cashiering
system equipment and provide storage for operating equipment.
- Provide direct access to external dining areas as required.
- Provide private dining rooms as required by T.S. Preliminary Area
Program.
- Minimally equip each private dining room with reach-in coat closet and lounge
style-seating group at entry area.
- Table configuration to allow for grouping tables together to provide large
capacity dining table.
- Provide service station as required.
- Show Kitchen
- Minimum ceiling height 3000 mm.
- Coordinate fully with Interior Designer, Lighting Consultant and Kitchen
Consultant for architectural finishes, kitchen equipment finishes, exhaust
hood detailing, display cabinets, lighting concept, controls and fixture
selection.
- Detail Show Kitchen front counter to allow dining, waiting staff pick up and
display as required.
51
Space Design Requirements – Banqueting & Meeting
Facilities
The scale, extent and diversity of these areas will vary from hotel to hotel. A detailed
requirement for the project will be contained within the Preliminary Area Program issued
by T.S.
Smaller scale facilities may be located adjacent to the Public Areas of the Hotel and may
minimally share toilet, telephone, and cloakroom facilities. Minimally each hotel will
require a dedicated Pre-function Area.
Larger facilities may be located in a dedicated wing of the hotel building with its own
street access, receiving lobby, elevator/escalators, multiple pre-function areas, toilets,
cloakrooms and telephone areas.
Minimally provide audio visual systems and components in accordance with T.S.
Engineering Recommendations and Minimum Standards and the AV Equipment
Schedule for the referenced project.
- Pre-Function Areas
- Minimum ceiling height 5000 mm.
- Provide decorative ceiling and wall mounted lighting fixtures in addition to
down lights and ceiling track lighting.
- Provide direct access into associated Banquet Meeting Rooms, circulation
access to elevator/escalator/staircase, cloakrooms, telephones and toilets.
- Minimally provide locations for directional and event signage.
- Minimally provide direct 2000 mm width free access route to BOH areas and
banquet equipment storage.
- Minimally provide a dedicated Pre-function area for each separate banquet,
meeting room greater than 300 m². Rooms less than a total of 300 m² ma
share a common Pre-function area. Minimally provide one Pre-function area
per banquet floor level.
- Provide natural daylight source with electronically controlled window
treatment.
52
- Ballrooms
- Minimum ceiling height - fully coffered ceilings.
- Minimally provide decorative ceiling and wall mounted lighting fixtures in addition to
downlightsand thetrical and ceiling track lighting.
- Minimally provide movable partition system in accordance with T.S.
Preliminary Area Program.
- Minimally provide 1200 mm clear entry, double, full height entry doors to all
divisible areas.
- Minimally provide column free space throughout ballroom area.
- Minimally provide audio visual systems and components in accordance with
T.S. Engineering Recommendations and Minimum Standards and the AV
Equipment Schedule for the referenced project.
- Provide back stage areas, artists’ dressing room, etc. in larger Ballrooms in
accordance with T.S. Preliminary Area Program and Engineering
Recommendations and Minimum Standards.
- Provide audio visual control room with unobstructed vision into each divisible
area in accordance with T.S. Preliminary Area Program and Engineering
Recommendations and Minimum Standards. Vision panels must be
coordinated with Interior Designer/AV Consultant.
- Minimally provide direct 2400 mm width free access route to dedicated
banquet equipment storage, service and freight elevator (if applicable).
- Minimally provide screenwall service vestibule, with open access into each
divisible ballroom area Access to BOH area via two 900 mm wide full swing
self closing service doors, equipped with clear glass vision panels. Provide
adjacent wall mounted door viewer to allow vision into each ballroom section
from BOH service vestibule. Coordinate vestibule lighting with Lighting
Consultant.
- Minimally provide recessed dirt/grease catching flooring surface within
service vestibules.
- Minimally provide chair rail protectors and wainscot protection at all areas.
- Provide natural daylight source with electronically controlled blackout
drapery.
53
- Meeting Rooms
- Minimum ceiling height.
- Boardroom
- Coffee Bar
- Back counter with fully automatic coffee machine, under-counter refrigerated
drawers, sink, hot water tap with under-counter boiler, shelving for operating
equipment storage.
- Front counter (900 mm height) to be used as bar counter or for food display.
55
Introduction
The following Design Recommendations and Minimum Standards together with the
referenced project's Preliminary Area Program, Operating Concepts and outline space
planning are provided to guide and assist Designers and Consultants with the design
development, equipment layouts and specifications. Close co-ordination with the
project's interior design and back of house layouts are required to ensure an integrated
and viable proposal.
T.S. Preliminary Area Program will detail the specific areas and square meterage
required for the referenced project.
Smaller properties may have consolidation of these areas, as detailed in the referenced
Preliminary Area Program.
56
Receiving Area
- Vegetable rough cleaning/de-boxing area:
- Spinner with floor drainage
- Double sink with floor drainage
- Charcoal/wood storage
- Recessed floor scale with drainage
Dry Store
Dry goods arrive pre-packaged and do not require refrigerated storage.
Minimum requirements:
- Enclosed, lockable and humidity controlled storage area
- High-density stainless steel or other NSF approved materials for shelving and
dunnage racks
57
Beverage Store
The Beverage store is the location for the stock of liquor, wine, beer and soft drinks of
the entire hotel. Each outlet will receive their stock from here on a daily basis to follow
local codes.
Minimum requirements:
- Enclosed and lockable storage area
- Walk-in chiller
- Stainless steel dunnage racking made of NSF approved materials
- Designated areas for chilled keg storage and ambient post mix cabinet
- Stainless steel wine shelving
Minimum requirements:
- 40 (ltr) rotary blender
- Table top multi-purpose vegetable cutter
- Potato peeler located adjacent to a sink unit
- Bench scale
- Juice extractor (centrifugal type)
- Citrus juicer
- Preparation counter with double sink
- Work counter with recessed cutting boards
- Scale
- Walk-in chiller
- Floor drains throughout
- Handwash sink with soap dispenser, integrated towel holder and garbage bin
- Knife Sterilizer
- In some countries, juice making rooms are separated due to hygiene codes.
- Vacuum packing machine
58
Meat, Poultry & Fish/Seafood Preparation
Meat, poultry, & seafood are all separated areas with chiller. Meat cutting is limited to
breaking down of primal cuts, grinding and cleaning/trimming. The seafood preparation
section should be located in an area separated from the butchery to avoid the cross over
of goods. These areas should have electrolytic ozone water system for cleaning
purposes.
Minimum requirements:
- Meat
- Bone saw (not to be located in direct traffic areas)
- Bowl cutter with lid
- Knife sterilizer
- Thawing cabinet
- Scale with label
- Scale without label
- Butcher bins
- Meat mincer
- Meat slicer
- Preparation table with double sink
- Vacuum packing machine
- Walk-in freezer
- Walk-in chiller
- Floor drains throughout
- Handwash sink with soap dispenser, integrated towel holder and garbage bin
- Fish/Seafood
- Fish preparation table with hand shower and recessed cutting board
- Fish file cabinet (drawer type)
- Floor drains throughout
- Handwash sink with soap dispenser, integrated towel holder and garbage bin
- Knife sterilizer
- Smoker
- Vacuum machine
- Thawing cabinet
- Scale with label
- Separate sashimi room in certain countries
- Poultry
- Preparation table with sink
- Walk-in chiller
- Walk-in freezer
- Thawing cabinet
- Vacuum packing machine
- Scale with label
- Floor drains throughout
- Handwash sink with soap dispenser, integrated towel holder and garbage bin
59
Bakery & Pastry Production
The bakery area is used for dough preparation and baking of goods whilst in the
adjacent pastry area pastries and desserts are prepared and cakes decorated. Both
areas are supported by a shared walk-in cold room and freezer. Additionally, as detailed
in the Preliminary Area Program issued by T.S., a separate area with a dedicated
air conditioning unit is required for the production of chocolate and ice creams.
Minimum requirements:
- Bakery
- Flour racks/ingredient bins
- Work counter with double sink unit
- Hanging bakers scale
- Mechanical scale
- Dough kneader
- Dough sheeter
- Dough divider
- Planetary mixer
- Spiral mixer
- Stirring machine
- Bread slicer
- Rotating oven
- Four burner range without oven
- Deck baking oven (baking sheets to be compatible in size with trays & trolleys
with proofer)
- Proofer (roll-in) (baking sheets to be compatible in size with baking ovens)
- Bakers table with wooden top
- Floor drains throughout
- Handwash sink with soap dispenser, integrated towel holder and garbage bin
- Pastry
- Floor model mixers (x 2)
- Table top model mixer
- Table top whip
- Cream dispenser
- Mechanical scale
- Blast chiller/freezer
- Counter with marble tops
- Walk-in chiller – pastry/balcony
- Walk-in freezer – pastry/balcony
- Issuing chiller (large hotels)
- Work counter with sink & refrigerated base
- Work counter with freezer base
- Central pot wash area
- Double sinks
- Storage for pots/pans
- Pot wash machine
- Floor trough
- Floor drains throughout
- Handwash sink with soap dispenser, integrated towel holder and garbage bin
60
- Water chiller/meter
- Pot wash area with floor trough (in large bakery/pastry only)
- Chocolate Room
- + 16 C to 18 C
- Working counter with sink
- Chocolate grater
- Praline cutter
- Chocolate tempering unit (x2)
- Blixer (robot coupe)
- Chocolate enrobing machine
- Microwave oven
- Scale
- Refrigerator
- Marble top working counter
- Handwash sink with soap dispenser
- Integrated towel holder and garbage bin
Issuing Office
Minimum requirements:
- Issuing office equipped with clerk’s desk, chairs, lockable filing cabinet, and clear
glass vision panels to assembly area.
- Provide adequate space for cart storage and assembly of orders.
- Locate at exit of the Food & Beverage Storage and Food Production Area.
Chef Office
- Desk/chair/lockable filing cabinets with glass vision panels
- Smaller hotels can be shared with issuing office
61
Laboratory
- In many countries, a dedicated laboratory is required.
- Three compartments:
1. Chemical analysis/incubation
- Incubator
- Microscope
- Weighing scale
- Water bath
- Magnetic stirrer
2. Washing/centrifuge/autoclaving
- Autoclave
- Work counter with sink
3. Microbiological
- Hot air oven
- Laminar air flow
- Combination upright chiller/freezer
- Office with desk/chair/lockable cabinets with glass vision panels
Minimum requirements:
- Humidity controlled walk-in chiller or reach-in refrigerators
- Work counter with open shelving below
- Flower preparation table with hand shower and sink
- Adequate shelving and storage facilities for the various decorative materials
Employee Restaurant
The employee restaurant provides meals throughout the day. Hot and cold foods, as well
as beverages are provided from a display counter. A dedicated kitchen is required for
this restaurant.
62
Minimum requirements:
- Handwash sinks with soap dispenser, integrated towel holder and garbage bin
located at entrance/exit to restaurant.
- Tray and cutlery trolley
- Full length sneeze guard
- Heated and ambient plate dispensers
- Cold pans with refrigerated space beneath
- Hot food well with heated storage beneath
- Condiment station
- Plate lowerator for cold and hot section (heated/non-heated)
Beverage Station
Depending on the possible configuration, the beverage station should be separated from
the food display counters.
Minimum requirements:
- Cup and glass rack lowerator
- Water boiler (consider instant hot water tap with undercounter boiler)
- Bulk brewer for coffee/tea
- Soda fountain (if applicable)
- Juice dispenser (if applicable)
- Vending machine – located in employee lounge or outside corridor
Dishwash Area
Located at the exit of the Employee Restaurant and separated from the preparation and
food display areas.
Minimum requirements:
- Dishlanding table with soaking bin and garbage below
- Pre-rinse unit
- Pass through, single tank dish washer – water & energy efficient machine to be
specified
- Dry run
- Storage shelving
- Handwash sink with soap dispenser, integrated towel holder and garbage bin
63
Restaurant Kitchen – All Day Dining
This facility will provide breakfast, lunch, dinner and 24-hour room service. The kitchen is
configured into the following sections: a hot section, a cold section, a general
preparation area and a dishwashing area. Supporting areas will include a dispense bar,
service stations equipped with tea and coffee making equipment and an ice dispensing
area.
Cold Section
Minimum requirements:
- Work counter with undercounter refrigerated drawers
- Work counter with single sink unit
- Ice cream freezer with dipper well
- Shelving for china and glassware
- Handwash sink with soap dispenser, integrated towel holder and garbage bin
- Meat slicer
- Table top food processor
- Floor drains throughout
- Electronic scale
- Convection oven (if applicable)
- Cutting boards and knife sterilizer
- Integrated waste chutes
- Printer
Hot Section
Minimum requirements:
- Griddle with oven below
- Chargrill, organic fuel fired
- Combination oven
- Electronic scale
- Double tank, single basket deep fryer
- Open burner range with oven below
- Salamander with height adjustable heat source (if applicable)
- Work counter with single sink unit
- Undercounter refrigerated drawers and doors for mis en place storage
- Heated storage with sliding doors for chinaware
- Preparation counter with cutting board and knife sterilizer
64
- Floor drains throughout
- Handwash sink with soap dispenser, integrated towel holder and garbage bin
- Integrated waste chutes
- Printer
Pot Wash
- Floor drains throughout
- Double sink pot wash unit and pot wash machine with floor trough in front and
adjacent pot shelving.
- Handwash sink with soap dispenser, integrated towel holder and garbage bin
Dishwashing Area
This section will include a dishwashing area with an adjacent operating equipment
storage area.
Minimum requirements:
- Dishlanding table with drain and over shelf for glass racks, with open space
below to locate dirty linen, cutlery soaking and garbage bins.
- A pre-rinse unit, including hand shower.
- Waste disposal units included depending on local codes.
- Double tank, rack type dishwashing machine, sized appropriately to restaurant
capacity. Consider heat recovery. Waters energy efficient machines to be
specified.
- Dry run with overhead shelf to store empty and clean dish/glass racks.
- Storage shelving for clean operating equipment.
- Silver burnishing section equipped with a heated soak sink and a silver
burnishing machine (if applicable/according to brand standards).
- Floor drains throughout
- Handwash sink with soap dispenser, integrated towel holder and garbage bin
65
Recommendation:
- Dishlanding table to be “lined” with a rubber protection to decrease breakage of
china and glassware.
Dispense Bar
Minimum requirements:
- Reach-in refrigerator with glass doors (only for BOH bars)
- Refrigerated undercounter bottle storage
- Wine bottle storage (refrigerated/non-refrigerated)
- Ice chest
- Blender station with sink unit
- Storage for glassware
- Undercounter liquor freezer
- Refrigerated bottle drawers
- Bulkhead storage for liquors
- Undercounter water cooled ice machine
- Undercounter freezer
- Ice crusher
- Floor drains throughout
- Handwash sink with soap dispenser, integrated towel holder and garbage bin.
Recommendations:
- Post mix gun with storage cabinet (high volume areas only).
- Draft beer unit with refrigerated storage.
- Mug froster (high beer consumption only).
66
- Handwash sink with soap dispenser, integrated towel holder and garbage bin
- Shelving for condiments/accessories
Ice Station
- Floor trough drainage
- Parking space for ice transport trolleys
- Ice dispensing machines (water cooled) with tote and transport cart (less handling
and contamination)
Room Service
Room service order taker is situated at the room service preparation area. This requires
an enclosed area for the order taker.
For both options the Room Service area should be located adjacent to the all day dining
restaurant and with direct access to the service lift. Provision for the following
items/areas should be made.
67
Room Service Trolley Set-up Area
- Allow adequate floor and circulation space for the storage of Room Service trolleys
and hot boxes.
- Minimum trolley storage space for 10% of the total room count.
- Provide location and power supplies for Room Service hot box racking.
- Provide open shelving and cabinets for operating equipment storage.
Show Kitchen
Show Kitchen design and equipment specifications are to be co-ordinated between
Kitchen Consultant, Interior Designer, Lighting Consultant and MEP Consultant, and are
based on the following minimum standards and recommendations in addition to the
typical kitchen requirements.
- Cooking suites:
- High-end brands to be considered only and coordinated with Interior Designer
- All equipment to be mounted on plinths for hygiene reasons
- Working counter heights not to exceed 900 mm
Wine Display
- Technical requirements of compressors, condensing units, must be specified and
coordinated with kitchen consultants.
- Shop drawings must be coordinated & reviewed with Kitchen Consultants.
Lighting
- No fluorescent or PL type lighting fixtures.
- Theatrical lighting fixtures recommended in order to highlight specific points of
action.
- Lighting system to be included in central dimming system in accordance with T.S.
Engineering Recommendations and Minimum Standards.
- Hood lighting to be coordinated with Lighting Consultants – no fluorescent types.
68
Exhaust Hoods
- All hoods must be in full compliance with T.S. Engineering Recommendations
and Minimum Standards.
- Special attention is to be given to HVAC requirements to prevent the drawing of
kitchen odors into the restaurant areas.
General
- All hand wash sinks to have a soap dispenser, recessed towel dispenser, and a tilt-
out waste bin selected with Interior Designer. To be hands free (infrared or knee
operated).
Banquet Kitchen
The Banquet Kitchen should be located adjacent to and with direct access to the
Ballroom and Meeting Room facilities.
This kitchen must be divided into a cold section, a hot section, chillers, dishwashing
section, operating equipment store, dispense bar and ice production.
Cold
Minimum requirements:
- Work counters with open shelving below
- Meat slicer
- Work counters (fixed and mobile)
- Reach-in and undercounter refrigeration
- Table top food processor unit
- Freezer
- Walk-in coldroom
- Knife sterilizer
- Floor drains throughout
- Handwash sink with soap dispenser, integrated towel holder and garbage bin (in
vestibule in certain countries)
- Meat slicer
- Multi-purpose vegetable cutter
Hot
Minimum requirements:
- Mechanical tilting kettles with integrated water supply and co-ordinated floor
trough drain
- Tilting pans with integrated water supply and co-ordinated floor trough drain
69
- Roll-in combination oven with space for trolley parking and co-ordinated floor
trough drain
- Chargrill
- Solid top range with electrical oven below
- Open burner range with electric oven below
- Double tank deep fat fryer
- Floor drains throughout
- Griddle
- Electronic scale
- Knife sterilizer
- Mobile dish out counter with heated cabinets and heating device above the
counter
- Mobile tables for cold dish-out
- Walk-in cold rooms / freezer
- Issue chiller
- Handwash sink with soap dispenser, integrated towel holder and garbage bin
- Blast chiller (dish-out counters)
Dishwashing
Minimum requirements:
- Dishlanding table with drain and over shelf for glass racks and open space below
for dirty linen, cutlery soaking and garbage bins.
- Pre-rinse sink as part of the dishwasher feed, including a hand shower.
- Dishwashing machine (size is depending on the capacity of the operation),
energy & water efficient. Consider heat recovery.
- Dry run with overhead shelf to store empty and clean dish/glass racks.
- Adequate floor space for mobile dish/glass racks.
- Silver burnishing section with soak sink and burnishing machine (if applicable,
brand specific).
- Floor trough drainage throughout.
- Handwash sink with soap dispenser, integrated towel holder and garbage bin.
- Dishlanding table to be cushioned with a rubber protection panel.
70
Dishwashing & Stewarding
A dishwashing section and equipment storage area will support each Food and
Beverage area.
Dishwashing Area
Minimum requirements:
- Dishlanding table with integrated drain and over shelf for glass racks and cutlery
soaking and garbage bins.
- Pre-rinse sink as part of the dishwasher feed, including a hand shower.
- Dishwashing machine (size is depending on the capacity of the operation),
energy & water efficient machines to be specified. Heat recovery to be
considered.
- Dry run with overhead shelf to store empty and clean dish/glass racks.
- Adequate space for garbage bins and linen baskets adjacent to dishlanding
table.
- Adequate space to store mobile glass and china racks with clean dishes.
- Floor drains and troughs throughout.
- Silver burnishing section equipped with heated soak sink and burnishing
machine.
- Handwash sink with soap dispenser, integrated towel holder and garbage bin.
- Dishlanding table to be cushioned with a rubber protection panel.
- A separate glass washing machine for banquet kitchen required.
Bars
Bar equipment and components are to be adjusted according to the individual bar
concept.
Minimum requirements:
- Refrigerated undercounter storage
- Wine bottle storage (refrigerated/non-refrigerated)
- Speed rail
- Ice chest
- Blender station with sink unit
- Storage for glassware
- Undercounter liquor freezer
- Large cube ice-machine (if required)
- Refrigerated bottle drawers
- Bulkhead storage for liquors
71
- Ice crusher
- Handwash sink with soap dispenser, integrated towel holder and garbage bin
- Draft beer unit with refrigerated beer barrel storage (if required – project specific)
- Coffee machine with undercounter heated cabinet (if required)
- Mug froster (high beer consumption drawer only)
- Undercounter glass washer
- Undercounter ice machine
Lobby Bar
Located within the Lobby Lounge equipped with a basic bar set up, and an automatic
coffee machine/water faucet with undercounter boiler.
72
Kitchen Equipment - Minimum Standards
This section provides design recommendations and minimum standards for kitchen
equipment. However, these design guidelines do not make reference to any MEP
system leading up to connection points, which must minimally be in accordance with
T.S. Engineering Recommendations and Minimum Standards.
Buy-Out Equipment
Standard manufactured equipment referred to in the trade as “buy-outs” includes items
such as ranges, shelving and dunnage, fryers, preparation machines, dishwashers,
baking ovens, dough preparation/processing equipment, glasswashers, ice cube makers
(in all F&B areas and ice pantries on the guestroom floors) and standard manufactured
refrigerators and freezers.
- Minimally equip all gas burning equipment with integrated flame failure device
operating with thermocouple sensor activating relay to solenoid equipped control
valve. Ignition of gas burner to be achieved by mechanical starter button and
Piezzo crystal or electronic pulse spark.
- All equipment to be designed to prevent injury of personnel.
- All equipment has to be minimally supplied with stainless steel height adjustable
legs and self leveling feet with removable stainless steel skirting/toe plates
providing a sealed closure to the finished floor on all sides.
- All cooking equipment has to be full size units, minimum 850 mm depth.
- Controls and gauges to be in local and English language with temperatures
reading in Celsius and capacities reading in metric.
- All equipment to be gastronome (G/N) compatible.
- Exteriors to be in stainless steel throughout.
- All equipment to be provided with manufacturer's recommended spare parts kit,
one-year warranty and full set of as-built drawings and user manuals.
Custom-built items within Show Kitchens require co-ordination with the Interior Designer
and Lighting Designer for decorative finishes and lighting requirements.
All fabricated items shall be manufactured from all new materials and in accordance with
the following minimum specifications.
All equipment has to be minimally supplied with stainless steel height adjustable legs
and self leveling feet with removable stainless steel skirting/toe plates providing a sealed
closure to the finished floor on all sides.
The tops of all tables, drainboards, shelves, exterior panels, fixtures and doors of
cabinets shall each be constructed of a single sheet of metal.
73
Sheet and finished product shall be in alignment, flat, free from any waves, buckles and
surface imperfections. Sheets and finished products shall meet the following gauge
thickness within the tolerances set out by the AISI after polishing. Finished sheets and
products not conforming to these tolerances shall be rejected. Where size of finished
equipment requires the use of more than one sheet of metal, the sheets shall be butt
jointed by continuous weld for the full length. Joints are to be designed to provide a
water, grease and bacteria proof surface and should not be closer than 450 mm from the
edge of any item.
SWG THICKNESS MM SWG THICKNESS MM
12 2.64 18 1.22
14 2.03 20 0.91
16 1.63
Except where required to be removable, all flat surfaces shall be secured to sub-frame
by welding to eliminate all buckling, warping, rattling, and wobbling.
The polished grain on all surfaces of equipment shall run parallel to the longest
dimensions of the equipment except in the case where sections terminate in mitred
sections. Adjoining items and sections of equipment shall have the grain running in the
same directions. Exposed surfaces shall be finished to No. 220 grit and unexposed
surfaces to No. 90 grit. Rivets shall not be permitted in any location.
Welding means that metal joints shall be continuously welded on the exposed surface,
the exposed parts ground smooth and polished to match adjoining surfaces. All welds
shall be strong and ductile, sound, free of pits and cracks. Parts welded are to be made
homogenous and finished smooth and polished to adjoining sheet. Unexposed welds
shall be pacified to prevent attrition.
Spot welding shall be at a maximum of spacing of 75 mm, and shall be dressed smooth
on visible surfaces.
Fixtures shall be shop fabricated of one piece and shipped to the job completely
assembled wherever possible. Equipment too large to transport or enter the building, as
one piece shall be constructed so that the field joints can be welded and finished on site
in accordance with the minimum standards contained herein.
74
Bolts, screws, nuts, and washers shall be of stainless steel. The spacing and extent of
the bolts and screws shall be such as to ensure secure fastening and prevent buckling of
the metals fastened.
Dish Tables
- No. 14 gauge/2.03 mm stainless steel all welded one-piece construction.
- Reinforcement for dish tables and table tops: Framing of 127 mm by 25 mm x 25 mm
using 14 gauge/2.03 mm stainless steel channels.
- Edges - dish tables: Edges adjacent to walls or abutting units shall be turned up 250
mm and back 65 mm at 45 degrees. All other edges to have 75 mm high curb with
rolled rims.
- Pitch: Tables shall pitch to drain and pitch shall be in the main body of the top, at a
rate not less than 1%.
Base Cabinets
Base cabinets of semi-closed (open fronts) or completely closed type shall have bodies
constructed of 18 gauge/1.22 mm stainless steel with all exposed joints welded and
finished to previous specifications.
Base cabinets are to be secured to stainless steel counter tops. No exposed fasteners
will be acceptable. Bodies shall be reinforced for maximum strength and rigidity with 38
mm x 38 mm by 3.17 mm stainless steel channels. Bottoms shall be firmly closed.
75
Sliding Doors
Double panel construction with exterior panel of 16 gauge/1.63 mm stainless steel and
interior panel of 20 gauge/0.91 mm stainless steel, with 12.7 mm void between. Door
pulls should be recessed on exterior face.
Legs
Legs shall be round or square sections of 16 gauge/1.59 mm stainless steel with
internally threaded sleeves to accommodate self leveling foot with not less than 50 mm
adjustment.
Skirting-Toe Plates
Skirtings and toe plates shall be 14 gauge/2.03 mm stainless steel furnished with snap
on clips firmly attached to equipment legs and providing a sealed juncture with the
finished floor. Set back dimension shall be minimally 100 mm height x 80 mm depth.
Sinks
All sinks to be constructed of 14 gauge/2.03 mm stainless steel and creased to drain. All
sinks to be one-piece pressings with 15 mm internal radiuses. Sinks fitted with 42 mm
stainless steel strainer type drain with hand operated valve. All sinks to have skirt of 400
mm on front/service and visible sides.
Drain Boards
Corners of drain boards shall be rounded to 15 mm internal radius. All drain boards to be
pitched not less than 1% fall to sink. Drain boards to be welded to sink/counter frame.
Shelving
All shelves shall be constructed of 16 gauge/1.63 mm stainless steel with minimum of 50
mm front face turndown and 10 mm return.
Wall mounted shelving shall be mounted 25 mm off finished wall surface with 12
gauge/2.64 mm brackets flanged for 50 mm at 90 degrees. Anchor bolts/screws shall be
stainless steel.
Cabinet Shelves
Constructed of 16 gauge/1.63 mm stainless steel, with minimum of 50 mm front face
turndown and 10 mm return. All cabinet shelves are to be minimally adjustable with
runners welded to cabinet frame or interior faces.
76
Drawers
Drawers to measure 500 mm x 500 mm x 140 mm deep and shall be constructed of 18
gauge/1.22 mm stainless steel having all corners rounded, equipped with stainless steel
slides/ ball bearing nylon rollers with end stops. Front of drawer to be constructed of 18
gauge/1.22 mm stainless steel with recessed handle and provision for cylinder/lock.
Heights
All tables and counters shall be 90-92 cm high unless otherwise specified.
Sound Deadening
Undersides of all stainless steel tops on tables and counters shall be covered with a
sound deadening self adhesive sheeting. Samples and material specifications for
deadening material must minimally be approved by T.S. before application to any
units.
Exhaust Hoods
Exhaust hoods are to be integrally equipped with lighting, grease filtering system,
automatic fire suppression system interfaced with the main centralized life safety
systems and automatic wash down/cleaning system in accordance with T.S.
Engineering Recommendations and Minimum Standards. Coordinate show kitchen
exhaust hoods with the Interior Designer and Lighting Consultant.
The completed floor, wall, ceiling, and door panel construction shall achieve a thermal
conductivity (K factor) of not more than 0.12 BTU/hr/ft² per degrees Fahrenheit/inch.
Heat transfer (U factor) shall be not greater than 0.03. “R” factor shall be a minimum of
33.
All insulating materials must be CFC free and must be polyurethane that has to be
injected foamed in place using a blowing agent that is free of VOC (volatile organic
compound), has low GWP (Global Warming Potential), and has an ODP (Ozone
Depleting Potential) value 0. All insulating materials must be in compliance with
prevailing fire codes.
Wall and ceiling panels shall have interior faces minimally finished with 304 stainless
steel 18 gauge/1.22 mm panels.
Internal floor area shall be on the same plane, flush with the adjacent exterior area and
shall be finished with the same material.
All panel gaskets shall be impervious to acid, alkali and oils and vapor proof.
77
All internal corners must be minimally radiused at 25 mm.
Entrance door minimum clear opening dimension of 900 mm, outward swinging with self
closing 180° full action cam lift hinges. Door to be minimally equipped with insulated
clear glass vision panel, 600 mm x full width stainless steel 16 mm kick plates, a panic
exit device and provision to accommodate cylinder/ padlock. Door seals are to be
removable/replaceable and provide a hermetic seal.
Provide internal lighting fixtures to minimally achieve average level of 150 lux.
Provide air pressure equalization vent, heated vent required for freezers.
Provide digital thermometer reading °C/°F at entry door. Shared (internal freezer) units
to be equipped with separate externally located thermometer. Provide a temperature
monitoring system for each compartment to provide both local and centralized
audio/visual alarm. Centralized alarm must be interfaced with building automation
system, in accordance with T.S. Engineering Recommendations and Minimum
Standards.
Refrigeration Systems
T.S. requires that all refrigerants and associated systems are minimally in full
compliance with all prevailing codes and internationally accepted guidelines. All
refrigeration systems shall operate on CFC free refrigerants. Refrigerants shall be free
of VOC (volatile organic compound), has low GWP (Global Warming Potential), and has
an ODP (Ozone Depleting Potential) value 0.
- All refrigeration systems must be fully hermetic with factory assembled condenser,
evaporator and receiving tank.
- Condensers may be air or water cooled as detailed in the itemized specification.
- Evaporators must be forced air type mounted parallel with the entry door and
equipped with an integrated control system.
- Auto freezer shut off with open door signal.
- Auto freezer shut off with open door signal
- Freezer evaporators must be equipped with a run time and temperature controlled
defrost cycle. Condensation tray and drain line must be equipped with electric heat
trace and insulation to maintain +1°C constant.
- Refrigerator units are to be equipped with condensation tray.
- Fridge and freezer condensation tray and drain lines must be continuously pitched to
fall to external trap drain.
- System must minimally perform pump down cycle with prevention of refrigerant flow.
78
- Evaporators must be securely mounted to prevent vibration and associated noise.
- All pipe runs must be executed in copper, adequately protected, suspended and fully
insulated to maintain system performances measured at 27°C, 65% RH.
- Refrigerator unit, adjustable from -7° to +4°C
- Freezer unit, minimum of -18°C to -21°C
- Fish cold room -1°C to +1°C
Plumbing Requirements
All plumbing requirements must be in full compliance with T.S. Engineering.
79
- In addition to centralized water treatment as specified in T.S. Engineering
Recommendations and Minimum Standards, provide local in-line water filters.
- Minimally provide one solenoid controlled central gas supply shut-off valve at
each kitchen location. Minimally interface gas supply shut-off valves with exhaust
hood fire suppression system and centralized building life safety systems.
- Minimally provide individual local supply shut-off valves for gas, steam and water.
Shut-off valves should be located adjacent to each item of equipment and
supplied for each individual item of equipment.
Architectural Requirements
- Minimally provide non-slip ceramic floor tiles and grouting, however monolithic,
seamless flooring is preferred (epoxy resin painted concrete). Entire floor area to be
vapor, acid, alkali, oil and chemical resistant. Perimeter of floor to be provided with
radiused and coved tiles. Color and finish in accordance with T.S. Back of House
Color Schedules.
- Minimally provide ceramic wall tiles and grouting. Wall area to be vapor, acid, alkali,
oil, and chemical resistant. Color and finish in accordance with T.S. Back of
House Color Schedules.
- Minimum ceiling height in all kitchen areas to be 2800 mm. Minimally provide open
access suspended ceiling system. Ceiling tiles to be vapor resistant material or non-
corrosive metal.
- Provide wall blocking/reinforcement as necessary.
- Floor surface area of each kitchen must be continuously pitched to recessed floor
trough drains. Minimum pitch not less than 3% with a maximum pitch of 4%.
Dishwashing and ice making area may have pitch increased to maximum of 6%.
- Provide adequately dimensioned floor trough drains at:
- Walk-in cold room
- Dishwashing area
- Kitchen entry doors
- Indirectly drained equipment
80
Attachment to this chapter:
- Recommended Pool Depth Markers
Diagram
The following are T.S. guidelines for the design of Recreational and Leisure
Facilities, which include: Fitness Centers, Spas, and Camp Hyatt.
The detailed list of facilities, together with the specific minimum area requirements for
each project, will be listed by T.S. in the Preliminary Area Program.
Additionally, specific requirements will vary depending on location and market. For
example, resort versus urban locations, and requirements for in-house and/or outside
membership.
It is essential that the space planning of all spas and fitness centers provides for access
routes and circulation to and from the locker rooms without entering the operational
areas and avoid the crossover of wet and dry areas. Transitional zones must be
incorporated where conflicts arise due to building geometries.
81
Exiting Concepts
All Fitness Center & Spa areas must be designed and constructed to be in full
compliance with NFPA 101 or its subsequent revision.
These requirements include but are not limited to the following examples:
- Each area and level within that area must be provided with a primary
means of egress that provides a continuous, unobstructed and protected
path to the outside of the building.
- Alternative/secondary means of exit shall be provided at each building
level or where the maximum allowable travel distance from the occupied
area has been reached or exceeded.
- Each means of egress provides a flow/direction of travel leading from the
occupied area to the outside of the building.
- The exit discharge shall be at grade.
Entry and circulation throughout the facility by disabled guests and members is minimally
required. Facilities should comply with prevailing local codes or minimally meet
internationally recognized accessible design guidelines.
All pool, deck, sauna, steam, locker room showers, WCs and other ''wet'' areas are to be
provided with anti-fracture waterproof membranes at all walls and floors.
The lighting shall be developed by the Lighting Design Consultant and coordinated with
the overall interior design.
82
Specific requirements for each of the primary areas of the Fitness Center and Spa
Facilities are:
Locker Rooms
- Provide separate facilities for males and females.
- Minimum ceiling height of 2800 mm.
- Locate adjacent to, and with direct access from, Entry and Reception Area.
- Provide change in flooring finish and, where customarily appropriate, a change in
floor level and adjacent shoe lockers and slipper racks.
- Provide appropriate lighting for make up at dry vanity and grooming areas.
- Use of natural daylight recommended, if possible.
- Guest lockers
- Locker number on door.
- Minimum interior dimensions of 560 mm (d), 300 mm (w), 1800 mm (h).
- Digital locks with a master key system.
- Interior features to include door mounted mirror, tie rack, key/jewelry tray,
hanging rod (to accommodate three wooden coat hangers), top shelf, & double
hook.
- Door to be equipped with concealed spring hinges, top and bottom vents.
- Lockers to be installed with finished plinth base, and dropped fascia at the top.
- Coordinate with the Locker Room Interior Design.
- Provide free standing water resistant benches.
83
- Provide individual dressing rooms with lockable swing door, full length mirror, double
robe hooks, shelf, and bench.
- Miscellaneous FF&E items, provide millwork as required:
- Towel issue and towel return
- Hot and cold towel dispensers
- Safety deposit lockers, individually lockable
- Water coolers and stations
- Swimsuit dryers
- Sterilizing units for combs and hair brushes
- Floor scales
Toilets
- Minimum ceiling height of 2400 mm.
- WCs and Compartments:
- Minimum dimension 1100 x 1400 mm.
- Privacy partitions.
- Privacy lock.
- Coat hook.
- WCs wall mounted with concealed cisterns, electronic self-flushing, with seat and
lid.
- Double roll toilet tissue dispenser.
- Sanitary napkin disposal container with cover in Ladies’ toilets.
- Men’s urinals, wall mounted with privacy screens, electronic self-flushing system.
Shower Areas
- Minimum ceiling height of 2400 mm.
- Individual shower and drying compartments:
- Minimum dimensions for drying area 1000 x 900 mm.
- Door with privacy lock.
- Privacy partitions.
- Bench
- Robe hooks and towel bar
- Minimum dimensions for shower area 1000 x 1000 mm.
- Anti-scald faucet set.
- Adjustable wall or ceiling mounted showerhead(s).
- Individual floor drain.
- Shelf for personal items.
- Dispensers for body wash, shampoo, & conditioner.
- Grab rails
- Foot rest.
- Waterproof finish materials and construction methods throughout.
- Floor finishes to be non-slip and slope to drains, with radiused coves at walls.
84
- Other amenities may be required, such as athletic high pressure all body showers,
overhead waterfall nozzles, low pressure misters, aromatherapy rainwater showers,
etc.
Sauna
- Provide separate or shared facilities for males and females, dependent on local
culture.
- Minimum ceiling height 2400 mm. Ceiling to be sloped to control condensation
dripping.
85
- Walls and ceiling minimally constructed from 25 mm thick, solid tongue and grove
timber panels. Approved timbers include spruce, red cedar, hemlock. All timber to be
stabilized and prepared for high temperature exposure, smooth sanded finishes. The
wall construction system must minimally integrate ventilation gap, vapor barrier and
insulation layer.
- Two tier bench seating to accommodate a minimum of six users and minimally
constructed from solid timber planking, species to match walls and ceiling.
Dimensions and capacities will be dependent on facility size.
- Flooring to minimally be non-slip ceramic tiling, provided with removable timber slat
flooring. Provide floor drain.
- Integrated vapor proof lighting to be provided.
- Solid timber framed self-closing door with solid timber or fully insulated door handle,
double paneled tempered glass panel on outward opening hinges.
- Electric sauna heater thermostatically controllable between a minimum of 82° C and
a maximum of 100° C, room air temperature. Provide positive pressure outside
airflow to sauna heater.
- Minimally locate all sauna controls at BOH area/Reception area.
- Minimally provide multiple individual timing devices, temperature reader/thermometer
within the sauna and
- Provide provisions for integrated television, if necessary.
- Numbered towel & robe hooks and shelf for personal items
- Provide emergency call button inside Sauna.
- Wall-mounted clock.
- Other amenities may be required, such as low temperature aromatherapy Sauna
or Sanarium.
86
- Numbered towel & robe hooks and shelves for personal items (eyeglasses, etc.)
conveniently located outside entry door.
- Provide hose bib station with hot and cold water supply.
- For Hamams, provide hand held shower fixture with cold water supply. Provide
insulated piping as required.
- Locate steam outlet away from seating area. To be thermostatically controlled to
maintain a constant room temperature between 40° C and 48° C. Equip with diffuser
and escutcheon well for the introduction of essential oils.
- Minimally locate all Steam Room controls at BOH area/Reception area.
- Provide emergency call button inside Steam Room.
- Wall-mounted clock.
- Other amenities may be required, such as a Laconium, Caldarium, or Tepidarium.
Plunge Pool
- Provide separate or shared facilities for males and females, dependent on local
culture.
- Minimum depth of 1.20 m to a maximum depth of 1.50 m.
- All pool depths must comply with The Operator and local regulations. Submit details and
dimensions to T.S. for review and approval.
- Safety, hygiene and code of conduct signage and regulations in both local and
English language must be incorporated into the pool area in accordance with local
codes.
- Permanent signage indicating "No Diving", "No Running", "No Glass Containers" in
both local and English language with pictogram must minimally be provided at both
sides and both ends of the pool.
- The depth of the plunge pool must be shown adjacent by permanent markers with a
minimum height of 10 centimeters and in contrasting color to the surrounding
materials. The markers must clearly indicate the minimum and maximum depths of
the plunge pool. Depth shall be provided in both metric and imperial measurements.
The indicated depths as posted on the signage and as physically present in the
plunge pool must be absolute.
- Provide contrasting finish material colors at all edges (i.e., steps).
- Plunge pool bottom should be constant slope and not exceed a 1:12 ratio (8%).
- Provide a continuous hand hold around the perimeter of the plunge pool consisting
of a slip resistant coping ledge.
- Surrounding deck floor finish to be non-slip ceramic or natural stone tiles with
radiused coves at walls and fixed to a unitary surface.
- Walls and floor minimally constructed from ceramic or natural stone tiles fixed to a
unitary surface. Floor surface to be non-slip and with radiused coves at walls.
- Provide perimeter deck mounted skimmer system.
87
- All floor drains, circulation pump and jet pump nozzles must be fitted with an anti-
vortex cover or other means to prevent entrapment. The entire circulating system
design should conform to applicable codes and avoid entrapment hazards in the
pool.
- Maintain water temperature at 23° C.
- Provide underwater lighting system.
- Provide stainless steel access/exit steps and handrail.
- Numbered towel & robe hooks and shelf for personal items
- Provide emergency call button inside Plunge Pool.
- Provide numbered towel & robe hooks, and shelves for personal items.
Whirlpool
- Provide separate or shared facilities for males and females, dependent on local
culture.
- Pool wall, bench, and floor minimally constructed from ceramic or natural stone tiles
fixed to a unitary surface. Surfaces to be non-slip and with radiused coves at walls.
- Pre-manufactured units may be proposed as alternate to in-situ construction.
- All pool depths must comply with Operator and local regulations. Submit details and
dimensions to T.S. for review and approval.
- Safety, hygiene and code of conduct signage and regulations in both local and
English language must be incorporated into the pool area in accordance with local
codes.
- Permanent signage indicating "No Diving", "No Running", "No Glass Containers" in
both local and English language with pictogram must minimally be provided at both
sides and both ends of the pool.
- The depth of the whirlpool must be shown adjacent by permanent markers with a
minimum height of 10 centimeters and in contrasting color to the surrounding
materials. The markers must clearly indicate the minimum and maximum depths of
the whirlpool. Depth shall be provided in both metric and imperial measurements.
The indicated depths as posted on the signage and as physically present in the
whirlpool must be absolute.
- Provide contrasting finish material colors at all edges (i.e., steps).
- Provide a continuous hand hold around the perimeter of the whirlpool consisting of a
slip resistant coping ledge.
- Surrounding deck floor finish to be non-slip ceramic or natural stone tiles with
radiused coves at walls and fixed to a unitary surface.
- Provide perimeter deck mounted skimmer system.
88
- All floor drains, circulation pump and jet pump nozzles must be fitted with an anti-
vortex cover or other means to prevent entrapment. The entire circulating system
design should conform to applicable codes and avoid entrapment hazards in the
pool.
- Minimally locate all Whirlpool controls at BOH area/Reception area.
- Maintain water temperature at 40° C.
- Provide underwater lighting system.
- Provide stainless steel access/exit steps and handrail.
- Numbered towel & robe hooks and shelf for personal items
- Provide emergency call button inside Whirlpool.
- Wall-mounted clock.
Pool Areas
Lap Pool (Indoor and Outdoor)
- Entrance doors and gates to all pools should be equipped with self-closing, positive
self-latching mechanism. Levers should be located at a minimum of 115 centimeters
A.F.F.L. and provided with electronically time controlled locking hardware.
- Minimum dimensions for lap pools: 20 meters (25 meters preferred) x 9.2 meters
with a minimum depth of 1.20 meters to a maximum depth of 1.50 meters.
- All pool depths must comply with The Operator and local regulations. Submit details and
dimensions to T.S. for review and approval.
- Safety, hygiene and code of conduct signage and regulations in both local and
English language must be incorporated into the pool area in accordance with local
codes.
- Permanent signage indicating "No Diving", "No Running", "No Glass Containers" in
both local and English language with pictogram must minimally be provided at both
sides and both ends of the pool.
- Provide permanent signage at all entrance doors detailing operating hours,
prohibiting children using the pool without adult supervision, and advising that a life
guard is not on duty. Repeat advisory signage "Life Guard Not On Duty", "Use By
Children Prohibited Without Adult Supervision" at pool deck area. Signage to comply
with local regulations.
- The depths of the pool must be shown adjacent by permanent markers on both sides
and end decks and all internal faces of the pool. The depth markers must be a
minimum height of 10 centimeters and in contrasting color to the surrounding
materials. The markers must clearly indicate the minimum and maximum depths at
all areas and at all points of slope change. Depth shall be provided in both metric
and imperial measurements. The indicated depths as posted on the signage and as
physically present in the pool must be absolute.
- Recommended Pool Depth Markers – See attached diagram.
89
- Pool bottom slopes should be constant in each area and should not exceed a 1:12
ratio (8%), except transitional depth zones where the ratio should not exceed 1:3
(33%).
- Provide counter sunk stainless steel anchors to allow a rope and float line to be
positioned to demarcate lanes in lap pools and in recreational pools to be positioned
between 30 - 60 cm from the change in slope line and placed on the shallow side of
the change.
- Provide a continuous hand hold around the perimeter of the pool consisting of a slip
resistant coping ledge.
- Pools must be finished with a proven proprietary swimming pool ceramic tile or
natural stone system. This must include appropriately contrasting colors for
integrated profiles, edges, lane, and all safety markers. Floor surface to be non-slip.
Water line tiles are to be high gloss finish.
- Surrounding deck floor finish to be non-slip ceramic or natural stone tiles with
radiused coves at walls and fixed to a unitary surface.
- Provide perimeter deck mounted skimmer system.
- All floor drains, circulation pump and jet pump nozzles must be fitted with an anti-
vortex cover or other means to prevent entrapment. The entire circulating system
design should conform to applicable codes and avoid entrapment hazards in the
pool.
- Maintain water temperature at 28° C. Outdoor pool water temperature may vary
dependant on local climate, air temperature and humidity to maintain bathers'
comfort.
- Provide underwater lighting system to all pool areas.
- Provide a minimum of two entry and exit points located so as to serve both ends of
the pool and at intervals not to exceed 22 meters. Entry/exit steps and handrails
must not encroach into the lap swimming area. Provide stainless steel access/exit
steps and handrail.
- Provide pre-showers, foot baths, and eye wash stations.
- Provide life guard chair and equipment as required by local regulations.
90
- Permanent signage indicating "No Diving", "No Running", "No Glass Containers" in
both local and English language with pictogram must minimally be provided at both
sides and both ends of the pool.
- Provide permanent signage at all entrance doors detailing operating hours,
prohibiting children using the pool without adult supervision, and advising that a life
guard is not on duty. Repeat advisory signage "Life Guard Not On Duty", "Use By
Children Prohibited Without Adult Supervision" at pool deck area. Signage to comply
with local regulations.
- The depths of the pool must be shown adjacent by permanent markers on both sides
and end decks and all internal faces of the pool. The depth markers must be a
minimum height of 10 centimeters and in contrasting color to the surrounding
materials. The markers must clearly indicate the minimum and maximum depths at
all areas and at all points of slope change. Depth shall be provided in both metric
and imperial measurements. The indicated depths as posted on the signage and as
physically present in the pool must be absolute.
- Recommended Pool Depth Markers – See attached diagram.
- Pool bottom slopes should be constant in each area and should not exceed a 1:12
ratio (8%), except transitional depth zones where the ratio should not exceed 1:3
(33%).
- Provide counter sunk stainless steel anchors to allow a rope and float line to be
positioned to demarcate lap lanes in lap pools and to be positioned between 30 - 60
cm from the change in slope line and placed on the shallow side of the change.
- Provide a continuous hand hold around the perimeter of the pool consisting of a slip
resistant coping ledge.
- Pools must be finished with a proven proprietary swimming pool ceramic tile or
natural stone system. This must include appropriately contrasting colors for
integrated profiles, edges, lane, and all safety markers. Floor surface to be non-slip.
Water line tiles are to be high gloss finish.
- Surrounding deck floor finish to be non-slip ceramic or natural stone tiles with
radiused coves at walls and fixed to a unitary surface.
- Provide perimeter deck mounted skimmer system.
- All floor drains, circulation pump and jet pump nozzles must be fitted with an anti-
vortex cover or other means to prevent entrapment. The entire circulating system
design should conform to applicable codes and avoid entrapment hazards in the
pool.
- Maintain water temperature between 26° C and 32° C. Outdoor pool water
temperature may vary dependant on local climate, air temperature and humidity to
maintain bathers' comfort.
- Provide underwater lighting system to all pool areas.
- Provide a minimum of two entry and exit points located so as to serve both ends of
the pool and at intervals not to exceed 22 meters. Provide stainless steel access/exit
steps and handrail.
- Provide pre-showers, foot baths, and eye wash stations.
91
- Provide life guard chair and equipment as required by local regulations.
Treatment Rooms
- Provide separate or shared facilities for males and females, dependent on local
culture.
- Treatment Room dimensions to provide for either single or double occupancy.
- Provide signage indicating occupancy status and equip with a self closing entry door
with a self latching lever.
- Each Treatment Room to meet acoustic sound isolation standards with a minimum
STC rating of 50 dB.
- Sight lines into Treatment Rooms to maintain privacy from common areas.
- Provide each Treatment Room with specific zones – entry, changing area, shower
and WC separate and screenable from treatment area.
92
- Provide appropriate FF&E and millwork, including:
- Lounge chair and side table.
- Clothes closet.
- Cabinets and countertop with hand wash basin and undercounter refrigeration.
- Storage and preparation for lotions.
- Dry grooming station.
- Retail product display.
- Product and equipment trolley.
- Lockable cabinets.
- Provide non-slip floor finish materials.
- Utilize waterproof materials and construction methods throughout.
- Coordinate floor and wall GFCI power outlets with equipment placement.
- Locally controlled/dimmable lighting.
- Provide background or individual stand alone music system.
- HVAC system and controls to be independent for each Treatment Room. Locate
HVAC diffuser away from the treatment table.
- Provide voice & data outlets.
Relaxation Areas
Relaxation areas are required at the Spa and the Fitness Center areas. In the Spa,
provide a quiet relaxation lounge adjacent to the Treatment Rooms. In the Fitness
Center, a social relaxation area should be provided adjacent to the Locker Rooms.
93
Salon Areas
Salon Areas may include a Hair Salon and Nail Bar, and may provide various beauty
treatments such as manicures and pedicures. The Salon Areas should be located with
easy access from the Entry and Reception Area.
- Provide separate or shared facilities for males and females, dependent on local
culture.
- Areas to include:
- Reception and Retail
- Single hair styling stations for washing, cutting, and drying
- Single pedicure stations
- Single or communal manicure stations
- Toilets
- BOH Pantry and Storage
- Seamless flooring with radiused baseboards
- Coordinate floor and wall GFCI power outlets with equipment placement.
- Locally controlled/dimmable lighting.
- Background music system
- Millwork including retail vitrines, lockable cabinets, and work stations.
- Provide voice & data outlets.
94
Other Areas
Dependent upon a project’s specific requirements, other areas may include the
following:
- Kids Club
- Beachfront Facilities
- Ball and Court Games
- Dive Center
95
Attachment
Recreational & Leisure Facilities
- Recommended Pool Depth Markers Diagram
Recommended Pool Depth Markers Diagram
Attachments to this chapter:
- Back Of House Flow Diagram
- Front Office Functional Diagram
- Administrative Offices Functional
Diagram
- Human Resources / Training
Functional Diagram
- Engineering Areas Functional Diagram
- Housekeeping Functional Diagram
- Service Core – Maid’s Pantry
Functional Diagram
- Security Functional Diagram
- Employee Restaurant Functional
Diagram
- Employee Lockers Functional Diagram
Introduction
The term Back of House applies to:
- Operational and Administration Offices, (excluding Executive offices) and
circulation corridors.
- Receiving Dock
- Kitchens and Pantries
- Laundry
- Storage Areas
- MEP Plant Rooms
- Employee Facilities including Employee Entrance, Locker Rooms, and Employee
Restaurant.
Back of house areas, while not normally accessible to the hotel guests, serve an
essential function in the operation of the hotel and the safe and healthy welfare of all
hotel employees. The majority of back of house areas are in continuous use 24 hours
per day and are subject to rigorous movement of materials and employee traffic. The
primary objective of T.S. back of house planning services is to achieve a correctly
designed and specified back of house to ensure the efficient, safe and profitable
96
operation of the hotel. All areas and layout of equipment must comply with current
OSHA, ISO and HACCP requirements.
Exiting Concepts
All areas must be designed and constructed to be in full compliance with NFPA
101 or its subsequent revision.
These requirements include but are not limited to the following examples:
- Each area and level within that area must be provided with a primary
means of egress that provides a continuous, unobstructed and protected
path to the outside of the building.
- Alternative/secondary means of exit shall be provided at each building
level or where the maximum allowable travel distance from the occupied
area has been reached or exceeded.
- Each means of egress provides a flow/direction of travel leading from the
occupied area to the outside of the building.
- The exit discharge shall be at grade.
The provision of natural daylight throughout all back of house areas is recommended by
T.S. wherever possible and shall be deemed to be a minimum standard where
required by local codes.
Back of house areas must be minimally sized, located and architectural finishes
specified in order to service the operation and provide a balanced flow pattern of
employees and materials. The project specific configuration and square meterage
required will be confirmed in the Preliminary Area Program issued by T.S. who will
subsequently prepare back of house planning and specification documents for co-
ordination and implementation by the owner/developer's consultants and contractors.
All BOH kitchens, bars, pantries, locker room showers, WCs and other ''wet'' areas are
to be minimally provided with anti-fracture waterproof membranes at all walls and floors.
97
Entry and circulation to all back of house areas, as required by local code, by disabled
employees is minimally required. All facilities should comply with prevailing local
employment and disability access codes or meet ADA or internationally recognized
disabled design guidelines.
Wherever possible, office areas should be provided with natural daylight. In addition to
providing BOH planning documentation, T.S. also provides color material
presentation boards setting out contemporary materials and color schemes, which must
be adhered to throughout all BOH areas.
Front Office
- Minimum ceiling height 2600 mm.
- Provide private office with demising walls including a glazed partition rising from 100
cm AFFL to ceiling level equipped with privacy blinds for all directors' offices. Equip
office with manager desk, manager chair, credenza, lockable filing cabinets, and
visitors’ chairs.
- Locate immediately adjacent to and with direct (visually concealed) access to
Reception, and Concierge areas.
- Coordinate closely with T.S. Preliminary Area Program and Operational Concepts
for location of Guest Service Center and/or Business Center.
- Ensure flow pattern of employees' entering/leaving Front Office does not disrupt
Guest Service Center and adjacent workstations.
- Provide location for millwork item for the storage within Front Office area, preferably
with dual access to Front Desk.
98
- Locate Office Pantry adjacent to Front Office or Business Center and provide with
storage cabinets and adequate space for floor standing document center (multi-
function copy/scan/facsimile machine) with counter space for coffee/tea making
facilities.
- Provide location for drop safe in open sight of office occupants.
- See attachment “Front Office Functional Diagram”.
Accounting Offices
- Minimum ceiling height 2400 mm.
- Provide private office with demising walls including a glazed partition rising from 100
cm AFFL to ceiling level equipped with privacy blinds for Director of Finance and
General Cashier. These offices must have individual out of hotel system lock sets at
the entry doors.
- Equip Director’s office with manager desk, credenza, manager chair, lockable filing
cabinets and fireproof filing cabinet.
- Layout of General Cashier’s office to incorporate separate vestibule with electronic
access control. Vestibule equipped with clerk's desk and chair. Cashier’s office
equipped with electronic access control for vestibule entry, pass through window
lockable from Cashier's side, clerk's desk, chair, filing cabinet and fireproof cash
safe. Allow appropriate floor space for coin/note counting machine.
- Information Systems Manager’s office/workstation to be located adjacent to
Computer Room. Network systems equipment room provided with standard
manufactured racks for server, monitor and keyboard, and fireproof data safe,
sufficiently sized to accommodate equipment noted in T.S. Computer Equipment
Schedule.
- All other workstations to be equipped with clerk desk, clerk chair, filing cabinets.
- Provide half height, sound absorbent, mobile partitions as required.
- Provide Office Pantry (depending on location, to be shared with Sales & Marketing
and Food & Beverage) for placement of floor standing document center (multi-
function copy/scan/facsimile machine) with counter space for coffee/tea maker and
other miscellaneous office equipment.
- Provide adequate closet storage for outdoor clothing, umbrellas, briefcases, etc.
- Provide file storage at each workstation and central lockable file and stationery
storage. Coordinate format of file storage with local administrative customs and
practices.
- See attachment “Administrative Offices Functional Diagram”.
99
Sales & Marketing Offices
- Minimum ceiling height 2600 mm.
- Minimally provide private office with demising walls including a glazed partition rising
from 100 cm AFFL to ceiling level equipped with privacy blinds for all directors'
offices. Equip office with manager desk, manager chair, credenza, lockable filing
cabinets, and visitors’ chairs.
- Provide Office Pantry (depending on location, to be shared with Accounting and
Food & Beverage) for placement of floor standing document center (multi-function
copy/scan/facsimile machine) with counter space for coffee/tea maker and other
miscellaneous office equipment.
- Provide appropriate clerk workstations with clerk desks or countertop, chairs and
centralized filing, stationery and miscellaneous cupboards/storage.
- Minimally provide adequate closet storage for outdoor clothing, umbrellas,
briefcases, etc.
- Minimally provide half height, sound absorbent and mobile partitions as required.
- Rooms Reservations department to be located together with Sales & Marketing.
- Event Sales to be located together with Convention Services.
- See attachment “Administrative Offices Functional Diagram”.
100
Human Resources Office
The term Human Resources is used to describe the area and function of personnel
administration offices and training facilities. Human Resources should be minimally
located within the vicinity of the employee entrance and minimally be provided with
natural daylight throughout.
101
- Ensure sound attenuation is in full compliance with T.S. Acoustical
Recommendations and Minimum Standards.
- Ensure that all air conditioning, electrical, data/voice/co-ax cable routing and
termination panels are all in full compliance with T.S. Engineering
Recommendations and Minimum Standards.
- Provide appropriate space to accommodate hardware equipment racks for all
equipment, servers, monitors and keyboards. Racks must be suitably sized in
accordance with the relevant equipment schedules provided for the project.
Additional space must also be provided for a minimum of one workstation, desk,
chair, filing cabinets, etc.
- Provide raised platform access floor with anti-static characteristics.
- Avoid trailing, looped or otherwise exposed cable runs.
102
- Provide double width, minimum 2200 mm entry doors and allow placement of
workbenches, equipment tool racks, and spare part storage. Specific minimum
requirements include:
- Electrical: secure storage of spare equipment. Single and three phase power
outlets.
- Plumbing: adequate storage for pipe lengths and valves, floor drainage.
- Paint: provide for a minimum of two hour fire protection of room and exhaust
system. Include heavy duty sinks.
- See attachment “Engineering Areas Functional Diagram”.
Housekeeping Office
- Minimum ceiling height 2400 mm.
- Provide private office with demising walls including a glazed partition rising from 100
cm AFFL to ceiling level equipped with privacy blinds for Executive Housekeeper /
Housekeeping Manager. Equip office with manager desk, credenza, manager chair,
lockable filing cabinets and two visitors’ chairs.
- Provide Assistant Housekeeper/Clerk’s workstation.
- Provide all workstations with clerk desk, clerk chair and filing cabinets. Secretarial
station must be equipped with secretarial desk and chair. Provide adequate space
for lockable lost and found room/cabinet, central filing, document center (multi-
function copy/scan/facsimile machine), and stationery storage. Provide half height,
sound absorbent, and mobile partitions as required.
- Locate Housekeeping and linen store in adjacent areas allowing access and visual
control from Assistant Housekeeper’s workstation and also from circulation corridor.
- Provide cleaning materials store and issue. Provide Janitor’s sink, floor drain and
storage shelving.
- Provide handyman tool lockers and an eyewash station.
- Where identified by T.S. Preliminary Area Program, minimally provide adjacent
access to Employee Uniform Issue and Guest/Hotel Valet & Laundry.
- See attachment “Housekeeping Functional Diagram”.
Circulating Corridors
Circulating corridors throughout all BOH areas must be planned to allow the safe and
free flowing movement of employees and goods to and from all areas.
- Minimum primary corridor clear width 2400 mm.
- Minimum secondary corridor clear width 2200 mm.
- Minimum pedestrian only corridor clear width 1600 mm.
- Minimum corridor height 2800 mm.
- Provide all corridor areas with corner guards.
- Provide primary and secondary corridors with trolley guard rails.
103
- Provide all corridor exit/entry doors with self closing/hold open devices.
- Provide electronically assisted opening devices at all corridor entries leading into
Banqueting, Commissary and Central Production Kitchens.
- Floor level changes occurring in BOH areas and corridors must minimally be
accomplished by ramping with a ratio no greater than 1:12 or 8%.
104
- Provide all clerk stations with clerk desk, chair and filing cabinets.
- Provide adequate space for central filing, storage cabinets, system printer, facsimile,
copying machine and tea/coffee making facilities.
Storage Areas
The term Storage Areas applies to all storerooms that are not contained within a kitchen
or laundry area.
Introduction
T.S. Preliminary Area Program will confirm the total square meterage and
approximate locations of the various storage areas throughout the hotel. Storerooms
may have general or specific use as outlined below.
General Storeroom
- Minimum ceiling height 2800 mm.
- Minimally equipped with high-density fixed track mobile shelving, minimum load 140
kg/m.
105
- Minimum ceiling height 3000 mm.
- Provide double width entry doors with clear opening of 1800 mm.
Engineering Storeroom
- Minimum ceiling height 2600 mm.
- Minimally equipped with high-density fixed track mobile shelving, minimum load 140
kg/m.
- Provide Dutch door.
- Locate adjacent to Engineering office.
Furniture Storeroom
- Minimum ceiling height 2600 mm.
- Space to be left free to house attic stock and damaged furniture.
- Locate adjacent to Engineering office.
Upholstery Storeroom
- Minimum ceiling height 2600 mm.
- Provide adjustable shelving with minimum load capacity of 50 kg/m.
- Locate adjacent to Engineering office.
Linen Storeroom
- Minimum ceiling height 2600 mm.
- Provide adjustable shelving with minimum load capacity of 50 kg/m.
- Provide double width entry doors.
Amenity Storeroom
- Minimum ceiling height 2600 mm.
- Provide adjustable shelving with minimum load capacity of 50 kg/m.
106
Cleaning Equipment Storeroom
- Provide adjustable shelving with minimum load capacity of 50 kg/m.
- Space to be left free to house vacuums, scrubbers, polishers, etc.
Luggage Storeroom
- Locate adjacent to and with direct access to ground floor service lift, Lobby and
street access.
- Minimum ceiling height 2800 mm.
- Reinforced walls, ceilings, and floors if room will house x-ray machine (applicable to
high security risk properties).
- Coordinate interior finishes, colors and lighting if directly accessible from public
areas.
- Provide adjustable shelving with carpeted surfaces with hanging rod for storage of
garment bags. Minimum load capacity of 150 kg/m.
- Provide additional lockable cabinets with adjustable shelving.
- Equip entry doors with overhead closer with hold open function, minimum clear
opening dimensions of 1000 mm.
- Provide space for luggage carts.
T.S. endorses the customary code requirement that prohibits the placing of any
impediment within any fireman’s lift lobby or emergency escape route. Correct planning
is therefore required to accommodate the following requirements within the service core
(see attachment “Service Core – Maid’s Pantry Functional Diagram”) or suitably located
on each guestroom floor:
107
Employee Toilet
- Minimum ceiling height 2500 mm.
- Locate within service core area with direct access from service lift lobby.
- Minimally provide electronic self flushing WC cubicle with separate hand washbasin
area.
- Demising wall must minimally be full height partition, internal partition between hand
wash and WC areas may be three quarter height pre-fabricated partition system.
- Provide privacy lock at WC area, stainless steel toilet tissue dispenser, paper towel
dispenser, wall mounted liquid soap dispenser and wall mounted mirror.
Maid’s Pantry
- Minimum ceiling height 2500 mm.
- Minimum clear door opening 900 mm equipped with overhead door closer with hold
open function
- When pantry is directly accessible from guestroom corridor, exterior of door must be
coordinated with corridor finishes to match guestroom entry doors.
- Provide counter with adjustable shelves for crates, undercounter dishwasher, and
sterilizer (country specific).
- Provide ice machine in enclosed niche.
- Provide separate storeroom with lockable cabinets (for amenities) and floor to ceiling
adjustable shelving to support 75 kg/m.
- Provide appropriate floor space for storage of: maids' trolleys, rollaway bed, baby
cots and bed boards.
- Provide janitors sink and floor drain in an isolated area.
- Provide wall mounted magnetic white board, bulletin board, and house telephone.
- Provide lockable cabinet for amenities.
108
Mini Bar Store
- Minimum ceiling height 2500 mm.
- Minimum clear door opening 900 mm.
- Provide floor to ceiling adjustable shelving to support 150 kg/m.
- Provide appropriate floor space for storage of: mini bar trolley, dunnage platforms.
All plant rooms must minimally be in full compliance with all local health and safety
regulations and in compliance with the following:
- Provide all necessary life safety systems in accordance with T.S. Engineering
Recommendations and Minimum Standards.
- Ensure compliance with T.S. Acoustical Recommendations and Minimum
Standards.
- Minimally equip all plant rooms with first aid equipment.
Employee Facilities
Employee Entrance – Security Office
- Locate with direct street access.
- Employee Entry Vestibule to be equipped with half-height barrier turnstiles for hotels
with large staffing count.
- Corridor width to be of adequate width for security screening systems at high risk
hotels.
109
- Security Office to be divided into three areas:
- Control Room (including FAS, elevator panels, PA, security equipment)
- Surveillance Room (including panel racks)
- Security Manager
- Refer to the Security chapter in both the T.S. Design Recommendations and
Minimum Standards and the Engineering Recommendations and Minimum
Standards for detailed security requirements based on region.
- Locate adjacent security office equipped with:
- Clerk desk, chair, filing and storage cabinet
- Half height glazed partition wall incorporating a sliding pass through section
- Equip entry door with programmable electronic key card lock system and self closing
device to allow free entry during normal business hours and card only entry during
non-office hours
- Locate electronic time keeping system at employee entrance, employee locker
rooms and throughout other areas of the building in accordance with T.S.
Engineering Recommendations and Minimum Standards
- See attachment “Security Functional Diagram”.
Employee Restaurant
- Minimum ceiling height 2800 mm.
- Design intent, material selection, lighting, window treatment, etc. to create restaurant
ambience.
- Provide natural daylight where possible and outside terrace for smoking.
- Provide variety of seating styles and table sizes.
- Provide partial self service and serviced pick up line. Provide location for dirty dishes,
tray drop off, coordinated with the Kitchen Consultant.
- Provide location and power outlets for vending machines, outlets and telephone sets
(in-house and public payphone), outlets for data and MATV network access in
accordance with T.S. Telephone and Computer Equipment Schedules.
- Provide location for wall mounted, lockable display cabinets, notice boards and menu
boards.
- See attachment “Employee Restaurant Functional Diagram”.
110
- Minimum locker dimensions for full height lockers 1700 x 300 x 450 mm, rustproof
constructed with sloping top and provision for master keyed, individual cylinder or
padlocks.
- Provide freestanding wooden benches or alternate integrated bench and locker units.
- Provide individual changing cubicles if required by local code or custom.
- Provide dry vanity counter minimally constructed from post-formed plastic laminate
solid core. Provide tempered glass mirror at back wall running full width of counter.
Equip with electrical outlets and under counter trash receptacle.
- Provide full-length mirror at entry/exit vestibule, together with electrical outlets for
shoe polishing machines.
- See attachment “Employee Lockers Functional Diagram”.
111
Material Usage for Back of House Areas
The following table details materials that are suitable for Back of House areas. Those
materials, which are indicated as 'minimum' must be utilized, others, which are either
indicated as 'recommended' or have no indication may be utilized appropriately with prior
consultation and approval from T.S. The following link to the outline material
specification provides performance related characteristics for each material.
Accompanying the submittal of BOH layouts, T.S. will also submit of a Back of
House Color Schedule for each project.
EmployeeRestaurant&Locker
BOHKitchens&EmployeeCafé
Food&BeverageStorerooms
PABX/MATV/InfoSystems
EmployeeShowers&Toilets
AdministrationOffices
CirculationCorridors
OperationalOffices
Stairwells&FireExits
EquipmentRoom
ExecutiveOffices
MEPPlantRooms
ShowKitchens
Laundry&Valet
StorageAreas
ServiceCore
Kitchen
Rooms
Floors
Sealed, oil/acid/alkali M
resistant concrete
Epoxy resin painted M M R
concrete
Hot welded sheet vinyl M R M M
& profiles
Heavy duty non-slip R M M M M M
ceramic tiles & profiles
Vinyl tiles R R M R
Carpeting/carpet tiles M
Interior Designer’s M M
specification
Raised platform M
access, anti-static
Non-combustible finish M
Walls
Sealed, oil/acid/alkali M M
resistant concrete
Corner guards M M M M M M M M M M
Trolley guard rails M M M M M M M
Lead free washable M M M M M M M
paint
Modular wall
systems/office M M M M
partitions
Heavy duty ceramic M M
tiles & profiles
Wallcovering M
Interior Designer’s M M
specification
Non-combustible paint M
finish
Ceilings
Sealed concrete M M M
Suspended metal tray, M M M
open access
Suspended acoustic M M M M M M M M
panel, open access
Suspended gypsum R R R M
access panels
Epoxy resin painted R
concrete
Interior Designer’s M M
specification
Attachment
Back of House Facilities
- Back Of House Flow Diagram
- Front Office Functional Diagram
- Administrative Offices Functional Diagram
- Human Resources / Training Functional Diagram
- Engineering Areas Functional Diagram
- Housekeeping Functional Diagram
- Service Core – Maid’s Pantry Functional Diagram
- Security Functional Diagram
- Employee Restaurant Functional Diagram
- Employee Lockers Functional Diagram
Attachments to this chapter:
- Linen Chute Specifications
- Laundry Flow Diagram
Introduction
Laundry Design Recommendations and Minimum Standards
required for the project will depend on a number of determining factors including the
capacity of the hotel (Guestrooms, Food and Beverage, Fitness Center) and the
availability, service scheduling and commercial viability of locally available commercial
laundries. All areas and layout of equipment must comply with current OHSA and ISO
requirements. All Laundry and Valet areas must minimally be provided with an anti-
fracture waterproof membrane at all wet area floors and walls.
Full Laundry
A laundry will typically consist of the following areas:
113
Washing
- Washer/Extractor – large commercial
- Detergent dosing unit
- Bushel trolleys
- Double Sink
Drying
- Commercial dryers
- Lint collection
- Bushel trolleys
Flatwork Ironer
- Minimum two rollers with feeder
- Folder/Crossfolder and stacker
- Towel folder
- Trolleys
Guest/Uniform Laundry
Dry Cleaner
- Dry cleaning machine
- Spotting board
- Utility press
Shirt Station
- Bosom and body press
- Collar and cuff press
- Sleever
- Damp box
- Shirt folding
Finishing Section
- Form finisher
- Topper/legger
- Utility press
- Ironing board with steam iron
114
Washing
- Small commercial washer
- Domestic washer
- Double soaking sink
Drying
- Small commercial dryers
- Domestic dryer
Uniform Storage
- Sewing station
- Changing cubicle
- Shelving
- Automated distribution system
Chemical Store
- Shelving (high density)
Compressor Room
- Air compressor
- Steam boiler
115
- Minimally equip with permanent Manufacturer’s/Installer’s identification plate
showing item serial number, voltage characteristics and load information.
Equipment with an internal switching or distribution network should contain
switching or circuitry details.
- Minimally provide all components rated for continuous duty cycle, adequately
protected from splashes, heat transmission/absorption and for operation in
temperature range -25°C- +40°C.
Plumbing Requirements
- All plumbing requirements must be in full compliance with T.S. Engineering
Recommendations and Minimum Standards.
- Minimally equip all gas burning equipment with integrated flame failure device
operating with thermocouple sensor activating relay to solenoid equipped control
valve. Ignition of gas burner to be achieved by mechanical starter button and field
crystal or electronic pulse spark.
- Minimally locate all water supply inlets above the positive water level. Where
operation of the equipment requires a submerged inlet the supply must minimally
be provided with a reverse flow check valve and separate vacuum breaker on the
supply line.
- Minimally ensure that all drain lines, internal and external, are continuously
pitched to fall to final drain connection.
- Internal drain lines must be directly connected to final drain connection.
Equipment requiring indirect drainage must be fully coordinated with adequately
dimensioned floor trough drains.
- Exposed horizontal supply lines must minimally be mounted at 200 mm AFFL
and not routed over or on floors or impeding the operation of adjacent equipment.
- In addition to centralized water treatment as specified in T.S. Engineering
Recommendations and Minimum Standards, provide local in-line water filters.
- Minimally provide one solenoid controlled central gas supply shut-off valve at
each relevant equipment location. Minimally interface gas supply shut-off valves
with centralized building life safety systems.
- Minimally provide individual local supply shut-off valves for gas, steam and water.
Shut-off valves should be located adjacent to each item of equipment supplied to
each individual item of equipment.
Linen Chute
- Minimum width shall be 700 mm.
- Materials, components, assemblies and construction methods must achieve a
minimum fire resistant rating of sixty (60) minutes.
- Stainless steel throughout.
- Access at each guest floor via a self closing, tilting door with electromagnetic
locking mechanism and key access. An integral access control system with
status indicator will prevent the concurrent opening of more than one door.
116
- Access door shall be 700 mm AFFL.
- One recessed sprinkler (fire extinguishing) inside the chute/per floor or
determined sector.
- Top and bottom of the chute shall have an automatic fire damper.
- Linen chute shall have roof top vent.
- Linen chute to finish at a height of 1600 mm AFFL in the linen sorting area /
room. Linen chute shall terminate with an elbow radius of 60 degrees. The elbow
shall extend a minimum of 1 m from the vertical centre line of the shaft. The
termination details must be closely coordinated with the sorting area / room
layout.
Floor Scale
- Minimum scale indicating capacity of 500 kg in 0.1 kg increments.
- Scale should be recessed and platform should accommodate the linen trolley.
- Indicator with tare button to automatically subtract weight of laundry cart from
total weight.
- Wall mounted stainless steel indicator panel with waterproof enclosure, capable
of programming minimum of 4 different cart weights with data output to printer.
Washer/Extractor
- Washer/extractor shall be an end or front loading, open pocket machine.
- Washing capacity shall be indicated at 1:10 loading ratio.
- Drum volume shall be indicated as part of specifications.
- Outer casing of the washer shall be stainless steel material.
- Drums should be constructed of stainless steel.
- Programmable microprocessor type wash formula controls with LED readout and
key switch to limit programming access.
- Programmable formula controls must be able to cycle method, inc. times,
temperatures, water levels, RPM, chemical supply injection and weight alarms.
- Feature to use the water extracted from the second and third rinse to be re-used
for the first wash.
- Washer shall be equipped with double drain valve for water recycle function.
- Automatic permanent press, cool down and cotton fabric setting.
- Anti-siphon, vacuum break protections at all fill valves.
- Variable speed single motor drive with electrical/thermal overload protection.
- Vibration safety shut-off.
- Door safety interlock.
- Automatic liquid chemical dispensing unit.
- Manual feed supply injection with five compartments and waters flushing device.
- Extraction re-balance feature.
117
- Bolt down sprung chassis.
Dryer
- Coordinate lint ducting to building exterior according to local codes and
regulations.
- Gas or steam heated with condensation return to maximize energy usage.
- Clear glass door.
- Computer controls including: reverse or non-reverse control, self diagnostic
function, programmable temperature controls, push to start control,
programmable drying and permanent press cool down timer control, automatic
shut down control based on load, contents and humidity.
- Computer memory battery back-up.
- Electrical thermal overload protection.
- Stainless steel drum with smooth rolled edge perforations.
- Double wall constructed (insulated) on side, back, front and burner compartment.
- Safety controls including exhaust air failure switch and overheat protection
temperature thermostat.
- Automatic back draft damper.
- Built-in, self cleaning lint screen.
- Built-in, wrinkle feature
- Aluminized steel burner.
- Adjustable leveling bolts.
Lint Collector
- Wet type lint collector.
- Leak proof access door to main chamber.
- Lint collector shall be floor mounted with floor mounting pedestal included.
- Provided with an inlet transition duct assembly to allow for separate ducting of all
dryers.
- Capable of effectively removing a minimum of 95% of lint and particulate matter
entering main chamber.
- Spray nozzles to be located at roof and sides of main chamber for properly
wetting lint or particulate matter entering chamber.
- Internal baffles strategically located in chamber to ensure proper washing of
incoming air.
- Collector shall be completely watertight and sealed at all joints to prevent leaks.
- Main chamber, outlet transition, hopper, internal baffles shall be constructed of
heavy gauge stainless steel.
118
- Reservoir tank and re-circulating pump assembly constructed of heavy gauge
stainless steel and shall have a filter to prevent large foreign matter from entering
the pump.
- Fan and pump motors shall be provided with motor starters and electrical/thermal
overload protection.
- Lint collector shall be adequately sized to properly collect lint from all dryers
connected.
Flatwork Ironer
- Working width shall be indicated in specifications.
- Drive and exhaust motor with electrical and thermal overload protection.
- Steel boilerplate chest in fixed position.
- Automatic raising of rolls when rolls have stopped to prevent linen damage.
- Automatic roll pressure relief when rolls start up and when flatwork is not in
contact with roll to reduce pad wear and to reduce electrical current surges.
- When rolls are in raised position it shall remain in raised position in case of
compressed air or power failure.
- Heat resistant padding to withstand operating temperature.
- Built-in vacuum system with fan at feed inlet table for feeding small pieces of
linen.
- PLC Controls including: start/stop, forward, reverse, roll compression control, fan
control, ammeter, microprocessor controlled roll speed with speed indicator and
infinite speed control (20 to 100 fpm), emergency stop, steam inlet and outlet
pressure gauges.
- Control panel to be touch-screen operable with color graphics.
- Four safety stop buttons, one located at each corner of the ironer, to activate
mechanism stopping all movement of roll immediately with no overrun if
emergency stop or finger guards are actuated.
- Ironer shall come with power plug and quick release connector for compressed
air supply ready for connection to sheet folder.
- Lockable drive access panels and finger safety guards on front and rear of ironer
and any additional safety features to prevent any personnel from touching drive
or roll or prevent any injury while operating or standing near the ironer.
- Equipped with canopy to contain heat and lint.
Sheet Folder
- 150 fpm minimum operating speed.
- PLC controls including programmable folding adjustments/settings, trouble
shooting function, infinite speed control and indicator and solid state circuitry.
- Control panel should be touch screen operable with color graphics.
119
- Folder speed shall be automatically synchronized to the speed of the ironer by
means of network cables.
- Automatic flatwork size compensation.
- Infrared photoelectric measuring sensors.
- Totaling counter (each lane).
- Adjustable height conveyor to receive flatwork from ironer.
- Side discharge to the stacker.
- Equipped with all fold bypass and two primary folds in each lane and up to three
crossfolds during one lane operation.
- Static eliminator bar.
- Caster mounted with brakes.
- Pressure regulator(s), gauges and air filter.
Sheet Stacker
- Equipped to stack and receive large folded flatwork and sheets from the folder.
- Stacker to be controlled by folder PLC.
- Adjustable stack height.
Towel Folder
- Capable of sorting, folding, stacking three set sizes of terrycloth and smaller table
linen without resetting controls.
- Piece counter for each take-away conveyor.
- Stack height adjustment for each take-away conveyor.
- Take-away conveyors to discharge to the side.
- Capable of French halves or bypass at primary folds. Crossfolds in halves,
French of quarters.
- Primary folds shall be done by blade movement over automatic adjustable
templates.
- Crossfolds shall be done by air blast via sandwiched conveyors.
- Automatic compensation of thickness at crossfold section by spring action for
flexibility.
- Minimum size of linen to fold is 400mm x 400mm.
- Digital display and control for face width, stacker eject setting, running count in
each stack, total number of pieces.
- Jam shut-off mechanism.
Marking Machine
- Temporary labels, thermally attached to garments.
- Provide with set up quantity of appropriate marking ribbons.
120
Dry Cleaner
- Prior to specifying this type of machine, the Laundry Consultant shall liaise with
the local authorities to ensure that this type of machine and its location meets all
local codes and regulations.
- Integrated cooling system with heat recovery.
- Two solvent tanks with illuminated sight glasses.
- Maximum of 2 g/m3 or fewer residues in dry cleaned fabrics.
- Two bath procedure.
- Eco carbon filtering.
- Continuous distillation.
- Inline solvent cooling.
- Automatic drying timer controller with adjustable drying sensor with indicator to
prevent under drying and over drying.
- Standard factory programming formula including: key and password switch to
limit program access, manual override, solvent level control, evaporator
temperature indicator, still solvent temperature indicator and heater control,
refrigeration indicator and control, formula to automatically control wash, extract
and drying functions.
- Safety shutdown when cooling tower water flow is sufficient to allow overfilling of
still.
- Door with glass viewing port and safety door interlock.
- Button and lint trap.
- Still and still solvent condenser.
- Fully automatic dosing.
- Reversing stainless steel corrosion resistant basket.
- Thermal and electrical overload protection.
- Provide with secondary vapor absorber and detector or other options as required
per local codes and regulation.
- Bolt down sprung chassis.
121
- Computer controls to include: digital garment counter with reset function,
conveyor speed control and indicator, thermostatic temperature control with read
out function, on/off button, conveyor start control, steam timer, individual on/off
steam yoke control.
- Automatic garment unload and holding control.
- Reversible conveyor direction.
- Fiber optic hanger sensor, steam activation and garment counting.
- Removable lint screens.
- Air damper.
- Steam coil access door.
- Fan cooled electric/control box.
122
Attachment
Hotel Laundry & Valet
- Laundry Flow Diagram
- Linen Chute Specifications
LaundryFlowDiagram
Guest&UniformLaundry HotelLaundry
LinenChute
Sorting& Sorting&
Marking Weighing
Flatwork
Pressing& Drying
Ironing&Folding
FormFinishing
Folding
Packaging Uniform
(Guest) Storage
Uniform Storage
Delivery
Issue
Linen Chute Specification
Roof
Vent
MaintenanceAccess
700mm
LinenSortingRoom
1600 mm
Introduction
The abbreviation FF&E represents Furniture, Fixtures and Equipment and is specified
from various Consultants in accordance with the following section description.
- Item cost
- Limited quantities of spare items, parts, and components
- Insurance and freight cost
- Delivery, placement, installation, training, and commissioning
- One-year warranty
- Complete set of user manuals
- Reproducible set of as-built drawings
The varying costs of labor, material, overheads, mark ups and market conditions
preclude Operator from warranting that bids or negotiated prices will not vary from the
budget.
Lateral movement of sums contained within the overall budget may occur during the
development of the referenced project.
Any other costs that may be associated with the purchase management and
administration, Contractor’s mark-up, financing, import duties, taxes, are due to their
variable nature specifically excluded from the budget.
124
Building external signage and illumination All items excluded.
125
Interior architecture and finishes
Doors & Hardware: Excludes the supply and installation of, all
doors and frames, all architectural and
decorative hardware, all ironmongery
including bathroom accessories, all
handrails and balustrades, all operable
walls and tracks, all access panels.
126
A.1 Guestrooms, Suites and Corridors Furniture and Fixtures
The budget includes all furniture and fixtures that are typically included in the Interior
Designer's approved specifications. These include:
127
To assist further with the above definition, the following are indicative, but not wholly
representative of associated items that are specifically excluded.
- All preparatory and finishing works to floors, walls and ceilings and
associated blocking.
- Exhibit licenses; artists', agents', gallery commissions, and expenses.
To assist further with the above definition the following are indicative, but not wholly
representative, of associated items that are specifically excluded.
- All exterior signage.
- All back of house Signage.
- All emergency, evacuation and code compliance signage.
- All preparatory and finishing works to floors, walls and ceilings and
associated blocking.
- All electrical systems and components leading to and including termination
outlet.
B. Major Equipment
B.1. Kitchens and Bars
The budget includes all kitchen and bar equipment that is typically included in a Kitchen
Consultant’s approved specifications. These include:
- Manufactured items, such as stoves, ovens, ranges, fryers, steamers,
dishwashers, mixers, coffee/tea makers, icemakers, beverage dispensers.
- Canopies and hoods including built in lighting, fire extinguishing and self
cleaning equipment, but excluding all interface components and programs to
centralized life safety systems.
- Refrigerators and freezers including free standing, under counter and pre-
fabricated cold rooms.
- Custom fabricated sheet metal items such as tables, sinks and dishwashing
arrangements.
- Shelving, including ready made and custom made.
- Mobile trolleys & carts.
- Provision of introductory training to hotel personnel, two full sets of user’s
manuals for each manufactured item, two full sets of as-built drawings
including electrical and refrigerant circuitry.
128
- Limited spare parts and components.
To assist further within the above definition the following are indicative, but not wholly
representative, of associated items that are specifically excluded.
- All preparatory and finishing works to floors, walls and ceilings and
associated blocking.
- All mechanical, electrical, gas and plumbing systems and components
leading to and including termination outlets/isolation valves, switches.
- Fire detection and prevention systems and components including integrated
mechanical, electrical and gas shut-off system.
B.2. Laundry
The budget includes all Laundry Equipment that is typically included in a Laundry
Consultant’s approved specifications. This includes:
- Manufactured items such as washer extractors tumble dryers, ironers,
pressers, dry cleaning machine, steam generator, vacuum pump, air
compressor, marking machine.
- Custom made items such as overhead track rail, sorting tables.
- Computer controlled uniform issue system.
- Shelving including ready made and custom made.
- Mobile trolleys & carts.
- Provision of introductory training to hotel personnel, two full sets of user’s
manuals for each manufactured item, two full sets of as-built drawings
including electrical and compressed/ vacuum air circuitry.
- Limited spare parts and components.
To assist further with the above definition the following are indicative, but not wholly
representative, of associated items that are specifically excluded.
- All preparatory and finishing works to floors, walls and ceilings and
associated blocking.
- All mechanical, electrical, gas and plumbing systems and components
leading to and including termination outlets/isolation valves, switches.
- Fire detection and prevention systems and components including integrated
mechanical, electrical and gas shut off system.
129
C. Communications Equipment
C.1. Audio Visual Equipment
The budget includes all audio-visual equipment for all areas of the Hotel and as detailed
within the specific project audio-visual equipment schedule and specifications and in
accordance with HYATT’S Engineering Recommendations and Minimum Standards.
These include:
- AV Controlling system equipment.
- Controlling system software and programming.
- Interface equipment and programming between control system and Lighting.
- Emergency Evacuation and other associated systems.
- Mobile and built in AV equipment.
- Carts and Racks.
- All infrastructure hardware and software.
- Face plates, switches and graphic preparations of same.
- Provision of introductory training to hotel personnel, two full sets of user’s
manuals for each item, two full sets of as-built drawings detailing controlling
and transmission network.
To assist further with the above definition the following are indicative, but not wholly
representative, of items that are specifically excluded:
- All preparatory works to floors, walls and ceilings and associated blocking.
- All associated MEP supply systems and components.
- All infrastructure cabling, cable supports and trays together with termination
outlets.
130
To assist further with the above definition the following are indicative, but not wholly
representative, of items that are specifically excluded:
- All preparatory and finishing works to floors, walls and ceilings including
associated blocking.
- All associated MEP supply systems and components.
- All infrastructure cabling, cable supports and trays together with termination
outlets.
To assist further with the above definition the following are indicative, but not wholly
representative, of items that are specifically excluded:
- All licenses for telecommunications/ wireless communications.
- All supply of incoming lines.
- All preparatory works and finishing works to floors, walls and ceilings
including associated blocking.
- All associated MEP supply systems and components.
- All infrastructure cabling, cable supports and trays together with termination
outlets.
131
D, E &F Hotel Equipment Specification Book
The section budget is prepared in consideration of the generic items and quantities that
will be contained within Hyatt’s preliminary Hotel Equipment Specification Book (HESB)
prepared for the referenced project. These specifications and quantities will be subject
to further refinement following a tabletop equipment selection, finalization of operating
concepts and procurement analysis. These processes will produce a final listing of
items, quantities, manufacturers, styles and patterns, which whilst adhering to the overall
budget, may produce variances within the categories or sections. Sections D, E, and F
include the following items.
D. Operating Equipment
D.1. Chinaware
- All Chinaware items used throughout all areas of the hotel operation.
D.2. Glassware
- All Glassware items used throughout all areas of the hotel operation.
D.3. Silverware
- All silver plated or stainless steel hollow ware and flatware items used
throughout all areas of the hotel operation.
D.4. Linen
- All Linen items used throughout all areas of the hotel operation.
D.5. Uniforms
- All Uniforms and associated items used throughout all areas of the hotel
operation including, any design fees associated with the normal custom
production of uniforms together with the cost of the prototype examples.
132
E.2. Material Handling Trucks
- All hand operated equipment used to transport materials throughout all
internal and external hotel areas including hydraulic pallet trucks, platform
trucks, maids trolleys, laundry carts, engineering, and luggage carts.
E.6. Vehicles
- All vehicles used for the operation of the hotel including VIP/Guest
limousines, materials pick up trucks or mini vans, staff shuttle mini buses.
Resort properties also include all vehicles associated with the transport of
guests, staff, and materials both on and off property including those required
for the maintenance of the landscaped facilities.
133
E.8. Recreational Equipment
All equipment associated with the operation of the following areas:
- Exercise areas: Cardiovascular equipment, strength and toning equipment.
- Spa areas: Treatment room furniture and equipment including facial
steamers, electrolysis machines, and other specialist items.
- Pool and Locker room areas: Swimming pool equipment, sauna and steam
room accessories. Specifically excluded are all built in pools, saunas, steam
rooms and all consumable materials, chemicals and their associated
dispensing systems all of which form part of the hotel operating consumable
budget.
- Resort areas: All items and equipment associated with the guests' use of the
resort and recreational facilities.
F. Auxiliary Equipment
F.1 Kitchen & Stewarding Utensils
All utensils used for the operation of all hotel kitchens and associated areas including:
- Pots, pans, inserts, lids, cutting boards, kitchen knives, tabletop digital scales,
baking sheets and moulds, food containers, garbage containers and dollies,
glass and dish washing racks.
- Also included are items required for any in house hygiene lab and personal
protective equipment such as, butchers gloves, freezer jackets, and
protective eye wear that do not form part of the uniform budget D.4.
134
F.3 Engineering & Landscaping Tools
All tools required for the repair, maintenance, and servicing of all MEP plant equipment
and systems. Including:
- Personal protective equipment, testing and monitoring kits, work benches,
spare part racking systems, mobile scaffolding components, vertical access
platforms, ladders, hand tools, corded/cordless/pneumatic power tools with
rechargeable batteries, and mobile compressors.
The following are indicative, but not wholly representative, of associated items that are
specifically excluded in all sections.
- Food & Beverage and hotel operating consumables.
- Printed Materials.
- Cleaning Supplies.
- All preparatory and finishing works to floors, walls and ceilings.
135
Introduction
The purchasing of all items of Furniture, Fixtures and Equipment is pivotal to the
successful completion of a hotel project. In addition to the commercial activities
associated with adherence to budgets, cash flow projections and contract awards, other
activities include compliance with design intents and timetables, co-ordination of
associated components and systems, delivery, circulation and recording of items.
Whilst the overall responsibility of FF&E purchasing rests with the Owner/Developer
and/or his appointed Contractor, the execution of a successful procurement program
normally requires the appointment of an FF&E Purchasing Agent who will work in
conjunction with Operators FF&E Project Manager. The extent of services provided would
be based on all of, or partially from the following:
136
- Coordinated circulation of Shop Drawings, Product Data, and material samples
for appropriate Consultants review and subsequent instructions to Suppliers.
- Coordination of Prototypes for appropriate Consultants review and approval.
- Coordination of FF&E deliveries and reconciliation with purchase contracts.
- Preparation of final FF&E inventory and Budget Reconciliation.
Preliminary Budgeting
T.S. will submit a preliminary FF&E budget following the approval of and taking into
consideration the project evaluation, the preliminary project description, design
statement, Preliminary Area Program and Staffing Guide. The cost factors for the
compilation of the budget are representative of T.S. best judgment and of key
Consultants budget estimates and are based on competitive tendering in the
international market. These factors are applied to the project conditions outlined above
and the resulting budget includes:
- Item cost
- Limited quantities of spare items, parts and components
- Insurance and freight cost
- Delivery, placement, installation, training and commissioning
- One-year warranty
- Complete set of user manuals
- Reproducible set of as-built drawings for custom installations such as kitchen
equipment
The varying costs of labor, material, overheads, mark ups and market conditions
preclude T.S. from warranting that bids or negotiated prices will not vary from the
budget.
Lateral movement of sums contained within the overall budget may occur during the
development of the referenced project.
Any other costs that may be associated with the purchase management and
administration, Contractor’s mark-up, financing, import duties, taxes, are due to their
variable nature specifically excluded from the budget.
Following approval of this estimated budget, the Owner/Developer shall brief the
respective Consultants on a maximum cost that their specifications must not exceed. It is
strongly recommended that this maximum cost is exclusive of any contingency figures
that the Owner/Developer would set-aside. The specifications produced thereafter by the
Consultants shall be accompanied by the Consultant’s cost analysis/estimate to ensure
adherence to the approved maximum cost.
137
Production Timetable
FF&E Specifications are produced, following the completion and approval of preliminary
planning and schematic design work and during the course of the design development
phase. Customarily the order of issue would be:
Interior Design
- Mock-up guestroom*
- Typical guestroom*
- Guestroom Corridor
- Suites
- Public Areas including Restaurant and Bar
*The approval of the mock-up guestroom precedes the issue of the typical
guestroom.
Kitchen Consultant
- Kitchen Equipment
- Bar Equipment
- Laundry Equipment
T.S.
- Engineering Recommendations and Minimum Standards
- Audio Visual Equipment Schedule and Specifications
- Computer Equipment Schedule and Specifications
- Telephone Equipment Schedule and Specifications
T.S.
- Hotel Equipment Specification Book
Art Consultant
- Art Program
Signage Consultant
- Interior Signage
138
Specification Content
The format of the FF&E Specifications must minimally comply with the following
requirements. The design intent and operational suitability of these will initially be
reviewed by T.S. and the ongoing compliance monitored by Operators FF&E Project
Manager.
Item Specifications
- Project Name
- Issue date (revision date)
- Grouping number by area i.e. guestroom, suite, corridor, hotel lobby,
hotel restaurant number 1, hotel restaurant number 2, fitness centre, hotel
bar, etc.
- Item identification number by sequential integer within a group
- Quantity
- Item description including original Manufacturer's model name, model
number, and or serial number or “custom item”, details including metric
dimensions, finishes and assembly/construction method, applicable code
compliance
- Installation co-ordination as required
- Source details including original Manufacturer, Manufacturer’s Agent,
postal, telephone, fax and e-mail contact or “custom item”
- Manufacturer’s photographic cut sheet and/or metric dimension line
drawing, or “custom item” metric dimension detailed line drawings of
components, assembly, designs and pattern repeats
139
Artwork Consultants
Supporting Documents
- Pre-amble setting out framing and installation methods and standards
- Scaled drawings showing each items location
- Material samples of frames and finishes
- Item by item anticipated cost
Item Specifications
- Project name
- Issue date (revision date)
- Grouping number by area, i.e. guestroom, suites, corridors, public area
- Item identification number by sequential integer within a group
- Quantity
- Item description including medium, artist's and piece name, unframed
dimensions
- Frame description including manufacturer's name, model number, finish,
metric dimensions
- Source details for both art and frame including postal, telephone, fax, and
e-mail contacts
- “Commissioned items” details including written narrative or medium,
subject, finished dimensions
- Copyright, intellectual property rights indication
Signage Consultants
Supporting Documents
- Pre-amble setting out manufacturing standards and item performance,
installation methods and applicable code compliance
- Scaled drawings showing item location
- Samples of materials used within Designers' scope of work
- Item by item anticipated cost
140
Item Specifications
- Project name
- Issue date (revision date)
- Grouping number by area i.e. guestrooms, suite, corridors, public areas
- Item identification number by sequential integer within a group
- Quantity
- Item description including: medium material content, typeface, point size,
finishes and assembly/construction method including integrated lighting
as required
- Detailed metric scales line drawing of components, assembly and designs
Auxiliary Specifications
- Item by item copy content
- Item by item typesetting
Item Specifications
- Project name
- Issue date (revision date)
- Grouping restaurant kitchen, banquet kitchen, etc.
- Item identification number by sequential integer within a group
- Quantity
- Item description including original Manufacturer’s model name and or
serial number or “custom item”, metric dimensions, MEP requirements,
attachment, appliance code compliance
- Manufacturer's photographic cut sheet and or metric dimension line
drawings and technical cut sheet
- Manufacturer's and/or Consultant's installation requirements or
recommendations
141
Communications Equipment
T.S. will provide recommendations and minimum standards/ outline specification for
the following communications systems and equipment:
- Audio Visual
- Computer Equipment
- Telephone and Data
The scope of the items that are contained within the FF&E definition is strictly limited to:
equipment, hardware, software and programmable interfaces. Specifically excluded are
all associated architectural floor, wall, and ceiling works and finishes, associated
preparatory works, transmission power distribution systems and components leading to
and including termination outlets.
Item Specification
- Project name
- Issue date (revision date)
- Grouping by item section, i.e. Chinaware, Glassware, Material Handling
Trucks
- Preliminary quantities
- Item generic description
Auxiliary Specifications
- Tabletop equipment selection including Manufacturers' name, model
name and/or serial number, finishes
- Final quantities
142
- Final item description including Manufacturers' name, model name and/or
serial number, finishes
Specification Review
FF&E specifications are released for review and approval to Owner/Developer, T.S.
and other Consultants as required. T.S. will review the specifications to ensure
compliance with approved design intent, operational effectiveness and compliance with
minimum standards. Additionally, T.S. will review any attached Consultants cost
estimate for adherence to the approved maximum cost budget.
The Owner/Developer’s Purchasing Agent shall typically study the specifications in detail
to ensure that both the Consultants’ cost analysis/estimate and prevailing market costs
are within the maximum cost. A report detailing the Purchasing Agent’s findings shall be
submitted to the Owner/Developer and T.S.
T.S. will prepare a review of FF&E specifications and submit this to the
Owner/Developer and respective key Consultants. Any items requiring re-selection or
correction of detail must be re-submitted for T.S. further review and approval.
T.S. reserves the right to withhold approval on any FF&E items that:
- Exceed the approved FF&E Budget
- Are operationally incorrect or unsuitable
- Do not meet T.S. Product Specifications or Design Recommendations and
Minimum Standards
- Vary from the approved design intent
Supplier Pre-qualification
T.S. will only endorse/approve the use of pre-qualified vendors for the supply of any
FF&E item. T.S. will make available a schedule of recommended suppliers at the
time of the procurement program. This schedule represents manufacturers or suppliers
who have successfully fulfilled all contractual obligations on previous projects or supplied
operational hotels with items, which comply with approved design and performance
specifications and within the approved cost. Additional or alternative sources may, at any
time, be submitted to T.S. for pre-qualification approval. Pre-qualification conditions
will address:
- Structure, stability & trading results of company
- Manufacturing quality and capacity of company
- Previous contract history of company
- Compliance with terms and conditions of sale from purchaser
- Structuring of future re-supply agreement as applicable
143
Tender Documentation
The Purchasing Agent shall assemble tender documentation packages in compliance
with normal competitive tender practices following the Owner/Developers instructions
and in accordance with any local legal requirements. The package shall include:
- Copies of the approved specifications
- Quantities required
- Contractual terms and conditions including: timetable, payment, etc.
- Bidding instructions
Operators FF&E Project Manager will be available to review completed packages to ensure
compliance with approved specifications, and Supplier pre-qualification.
Bid Analysis
On receipt of the bids, the Purchasing Agent shall review to ensure that the items on bid
are in accordance with the approved specifications and that the bid meets the terms and
conditions required. Any deviations or alternates from the approved specification or
terms and conditions shall be clearly noted.
A comparison spreadsheet for each package would then be assembled detailing each
item cost, sub-section costs and total package costs.
The Purchasing Agent shall prepare a written summary and recommendation, which
together with copies of the comparison spreadsheets shall be circulated to the
Owner/Developer, T.S. and the respective Consultant for review and comment.
The Purchasing Agent may then be briefed to commence commercial negotiations with
the favored bidders(s) or to prepare, with the relevant Consultant, reviews of the
possible alternates required to achieve budget compliance.
Bid Completion
T.S. minimally requires that bid analysis for all major items specified within a section
is both complete and in evident compliance with the FF&E budget prior to the award of
any purchase contract within that section.
Contract Award
Following Owner/Developer and T.S. joint approval of a bid, the Purchasing Agent
shall prepare and issue purchase contract documentation in accordance with
Owner/Developers instructions and complying with local legal requirements.
144
Spare Items, Parts & Components
The contract awarded must include the required quantities of spare items, parts and
components. These quantities will be identified by T.S. taking into consideration the
locality of the project, Supplier's location, custom fabrications, manufacturing lead time,
maintenance history and after sales services and the anticipated lifetime of the item.
Contract Administration
Typical contract administration duties should minimally include:
- Cash flow and payment recording, reporting of budgetary status
- Item tracking log showing status of contracted item vis-à-vis Shop drawing,
sample, prototype item approval, production, shipping, delivery, install, etc.
- Circulation of purchase contracts
- Co-ordination of delivery and installation timetables and supervision of on site
- activities
- Reconciliation of payments, deliveries and installations
- Preparation of Suppliers schedule showing item description, unit cost, quantity,
Suppliers contact details
145
FF&E PURCHASING SCHEDULE – Interior Design, Artwork, Signage
Category Description Initial Pre- Issue Bid Bid Issue Installation Opening
Review Qualify Tender Review Selection Contract
A1
Guest- Casegoods +62 +56 +52 +48 +44 +38 +10 Wk 0
rooms
Upholstered +62 +56 +52 +48 +44 +38 +10 Wk 0
Items
Drapery +42 +38 +34 +30 +26 +22 +10 Wk 0
Soft Goods +46 +40 +36 +32 +28 +24 +10 Wk 0
Associated +54 +48 +42 +36 +30 +26 +18 Wk 0
Fabrics
Loose Lighting +54 +50 +46 +42 +38 +34 +10 Wk 0
Carpeting +50 +46 +42 +36 +32 +28 +12 Wk 0
A2 Wk 0
Public Casegoods +52 +48 +44 +40 +36 +32 +8 Wk 0
Areas
Upholstered +52 +48 +44 +40 +36 +32 +8 Wk 0
Items
Soft Goods +38 +34 +30 +26 +24 +20 +8 Wk 0
Associated +44 +40 +36 +32 +28 +24 +16 Wk 0
Fabrics
Loose Lighting +48 +44 +40 +36 +32 +28 +6 Wk 0
Carpeting +50 +46 +42 +36 +32 +28 +10 Wk 0
A3
Artwork Commissioned +34 +32 +30 +26 +24 +22 +2 Wk 0
Reproductions +46 +42 +38 +34 +30 +24 +8 Wk 0
Framing +44 +42 +40 +36 +32 +28 +8 Wk 0
Sculptures +34 +32 +32 +30 +28 +26 +6 Wk 0
A4
Internal Wall Mounted +30 +26 +24 +20 +18 +16 +4 Wk 0
Signage
Loose +30 +26 +24 +20 +18 +16 +1 Wk 0
Illuminated +30 +26 +24 +20 +18 +16 +4 Wk 0
Copy Content +20 N/A N/A N/A N/A +16 N/A Wk 0
146
FF&E PURCHASING SCHEDULE – Kitchens & Laundry
Category Description Initial Pre- Issue Bid Bid Issue Installation Opening
Review Qualify Tender Review Selection Contract
B1
Kitchens Standard +50 +46 +42 +36 +32 +28 +12 Wk 0
Manufactured
Standard +50 +46 +42 +36 +32 +28 +12 Wk 0
Sheet Metal
Custom +50 +46 +42 +36 +32 +28 +12 Wk 0
Manufactured
Custom +50 +46 +42 +36 +32 +28 +12 Wk 0
Sheet Metal
Cold Rooms +50 +46 +42 +36 +32 +28 +12 Wk 0
Centralized +50 +46 +42 +36 +32 +28 +12 Wk 0
Compressor
B2
Laundry Flatwork +36 +34 +30 +26 +24 +20 +Note 1 Wk 0
Ironer
Washer +36 +34 +30 +26 +20 +16 +Note 1 Wk 0
Extractions
Tumble Dryer +36 +34 +30 +26 +20 +16 +Note 1 Wk 0
Pressing +36 +34 +30 +26 +20 +16 +12 Wk 0
Valet Dry Cleaner +36 +34 +30 +26 +20 +16 +Note 1 Wk 0
Pressing +36 +34 +30 +26 +20 +16 +12 Wk 0
Note:
Due to oversize dimensions of Laundry Equipment, entry to area of placement may be
required prior to area and structural completion. Time schedule indicated for preceding
activities is from date of placement.
FF&E PURCHASING SCHEDULE – COMMUNICATIONS EQUIPMENT
Category Description Initial Pre- Issue Bid Bid Issue Installation Opening
Review Qualify Tender Review Selection Contract
C1 Computer +30 +28 +26 +24 +20 +18 +8 Wk 0
Equipment
C2 Telephone +44 +42 +40 +38 +32 +28 +12 Wk 0
and Data
Equipment
C3 Audio +30 +28 +26 +24 +20 +18 +8 Wk 0
Visual
Equipment
147
FF&E PURCHASING SCHEDULE – HESB
Category Description Initial Pre- Issue Bid Bid Issue Delivery Opening
Review Qualify Tender Review Selection Contract
D1 Chinaware +36 +32 +30 +22 +18 +16 +6 Wk 0
D2 Glassware +36 +32 +28 +22 +18 +16 +6 Wk 0
D3 Silverware +36 +32 +30 +22 +18 +16 +6 Wk 0
D4 Linen +36 +32 +30 +26 +22 +20 +8 Wk 0
D5 Uniforms +34 +30 +28 +24 +20 +18 +4 Wk 0
E1 Office +34 +27 +25 +19 +17 +16 +8 Wk 0
Furniture &
Equipment
E2 Print Shop +28 +24 +22 +20 +18 +20 +6 Wk 0
Equipment
E3 Material +30 +26 +24 +18 +15 +14 +8 Wk 0
Handling
Trucks
E4 Cleaning +20 +17 +15 +11 +9 +8 +4 Wk 0
Equipment
E5 F&B Special +26 +22 +20 +16 +14 +12 +4 Wk 0
Equipment
E6 Shelving & +25 +21 +19 +15 +13 +12 +6 Wk 0
Lockers
E7 Vehicles +16 +15 +14 +12 +10 +8 +4 Wk 0
E8 Banquet +30 +26 +24 +18 +14 +12 +4 Wk 0
Equipment
E9 Recreational +34 +30 +28 +22 +20 +18 +6 Wk 0
Equipment
E10 Minor +34 +32 +30 +24 +20 +18 +8 Wk 0
Electrical
Equipment
F1 Kitchen & +30 +26 +24 +18 +16 +14 +6 Wk 0
Stewarding
Utensils
F2 Dining Room +30 +26 +23 +17 +15 +14 +6 Wk 0
Accessories
F3 Engineering & +17 +15 +14 +10 +9 +8 +2 Wk 0
Landscaping
Tools
F4 Guestroom & +32 +28 +28 +20 +17 +14 +6 Wk 0
Housekeeping
Accessories
148
Attachments to this chapter:
- Engineering Recommendations and
Minimum Standards chapter,
“Sustainable Design Criteria”
Introduction
Hotel construction and operation have considerable environmental impact. Hotels, like
many other buildings, use resources and raw materials and also generate waste and
potentially harmful emissions. Design consultants are required to take into consideration
the accessibility, security, health and productivity aspects of the development while
minimizing its impact on the environment. An integrated and coordinated approach by
the various stakeholders is key to the success of the sustainable design.
Sustainable design supports the protection of the environment and conservation, and
seeks optimization of cost and benefits to the environment, society and humans without
compromising the functionality of the building.
Although there are various versions of the definition of sustainability and sustainable
design, the main objectives can be classified, as follows:
- Land use and Accessibility
- Environmental Quality - Indoor and Outdoor
- Use of Environmentally Preferable Products and Materials
- Waste Management and Reduction
- Ecology and Biodiversity
- Water Protection and Conservation
- Energy Use Optimization
- Atmospheric Impact and Local Air Quality
- Operational and Maintenance Practices
149
Land Use and Accessibility
The location, orientation and landscaping of a building affect the local ecosystems,
transportation methods and energy use. Safety and physical security have also become
a critical component of site design. Roads, parking, vehicle barriers and perimeter
lighting need to be addressed during the design phase of a project.
Optimization of land use, provisions for open spaces for the benefit of the people and
biodiversity are also required. Connectivity and the movement of people and
accessibility need to be carefully planned.
Protection and enhancement of cultural heritage and distinctiveness shall also be one of
the design objectives.
Acoustic performance within and outside buildings is very significant for noise control
and well-being of occupants. The visual quality should also be maintained with good
architecture and interior design that blends in the traditional architectural style.
150
Water Protection and Conservation
Fresh water is a scarce resource in many parts of the world. A sustainable building
should reduce, control or treat site run-off, use water efficiently and reuse or recycle
water for on-site use when feasible. The quality of ground, fluvial and seawater shall not
be adversely affected by building's construction and operation. Adverse impacts of water
should be avoided such as flooding from rivers or storm water run-off.
151
Attachment
Sustainable Design
- “Sustainable Design Criteria”
(Excerpted from ERMS Version 3.0)
SUSTAINABLE DESIGN CRITERIA
SUSTAINABLE DESIGN CRITERIA
SUSTAINABLE DESIGN
1. Narrative:
We are committed to designing, building and managing innovative hotels that provide our guests
with authentic and comfortable accommodations that respect the natural environment and the
local communities in which we operate.
We engage and motivate our colleagues around the world to be our ambassadors in achieving
these goals, we work with suppliers to develop and provide innovative products and solutions, and
we strive to offer our guests unparalleled service in surroundings that reduce our impact on the
environment and positively contribute to the community.
2. Design Philosophy:
As a caring hospitality company and a citizen of the communities in which we operate, We view
the incorporation of sustainable practices into our design standards as both a business imperative
and as a responsibility. We strive to operate hotels that conserve natural resources, use materials
and resources wisely, and continue to adopt appropriate environmental standards throughout the
entire life cycle of a property. In emphasizing a design approach that guides our properties to
blend harmoniously & responsibly into their local context, reduce energy & water consumption,
minimize waste & harmful emissions, and make use of sustainable materials in their construction,
We stress sustainable design as an integral component of its overall strategy.
We have adopted this Sustainable Design Criteria to be implemented in all our projects. However,
for certain projects and/or regions, some aspects of the criterion may not be advisable or readily
achievable. Therefore, the sustainable criteria items are categorized as “Minimum Standard” and
“Recommended.” The following are definitions for these terms:
SUSTAINABLE DESIGN CRITERIA
3. Key Features:
The following criteria are to be utilized in the construction of new properties and renovations of
existing hotels:
o All building activities shall promote the protection of the welfare, health, and safety of
the population.
o All building activities shall have minimal ecological impact on the local environment.
o All design activities shall seek to maximize energy efficiency, use recycled &
recyclable products, and minimize the production of waste, harmful emissions and
the use of non-sustainable resources.
SUSTAINABLE DESIGN CRITERIA
The intent of this document is not to establish unique design concepts credited to our
company but to provide the project owners and designers with those sustainable
approaches that shall be integrated in a 5 star hotel. In the development of these Sustainable
Design criteria, many sources were evaluated as they related to the hospitality industry and
their appropriateness to hotel brands.
Some specific minimum standards and recommendations have been modified to reflect our
Needs while other references are more directly stated by referencing
internationally recognized
organizations that provide design and/or construction guidelines. These published guidelines
shall be reviewed for the complete explanation and compliance requirements. Renewable
sources are defined by Center for Resource Solutions (CRS) Green-e products certification
requirements. Refer to www.green-e.org for additional details on Green-e program. The
American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE)
publish three standards that pertain to The
Operator projects: ASHRAE 62.1-2004 is written for high-
rise construction, ASHRAE 62.2-2004 is written for low-rise construction, and ASHRAE 55-
2004 addresses thermal comfort. The following is a complete list of reference sources:
o United States Green Building Council's (USGBC) LEED
o World Travel & Tourism Council's (WTTC) Green Globe Programme
o American Society of Heating, Refrigerating and Air Conditioning Engineers
(ASHRAE)
o Environmental Protection Act (EPA)
o City of Austin, Texas, Austin Energy Green Building Program
o Illuminating Engineering Society of North America (IESNA)
o National Emissions Standards for Hazardous Air Pollutants (NESHAP)
o South Coast Rule #1168VOC
o Forest Stewardship Council’s Principles and Criteria
o National Energy Policy Act
o International Performance Measurement & Verification Protocol (IPMVP) Volume III:
Concepts and Options for Determining Energy Saving in New Construction
o Montreal Protocol
o Center for Resource Solutions (CRS) Green-e products certification
SUSTAINABLE DESIGN CRITERIA
Project Approach:
Building Systems: MINIMUM STANDARD – All the building systems including the
Structure, Heating, Ventilation, & Air Conditioning (HVAC), Electrical, and Plumbing shall
consider the latest innovations and practices available for the region in which the project is
located.
Outdoors Seating: MINIMUM STANDARD – Provide one (1) shaded exterior site seat for
every ten (10)-guestroom keys. The seating shall be distributed for use by hotel guests and
employees. Some appropriate areas for guest seating include the porte cochere, outdoor
dining, and pool/terrace. Employee areas shall be located adjacent to the primary employee
entry and recommended that efforts should be made to screen those from public and guest
view.
Electric, Low-emitting and Fuel-efficient Vehicles: MINIMUM STANDARD – (One of the
following is required. It is RECOMMENDED that as many as possible of these criteria be
integrated into the project).
1. Provide one reserved preferred parking stall in close proximity to the entry for every
150 room keys for guests driving electric, hybrid or flex-fuel vehicles. This parking
stall shall include an electrical power receptacle for electric vehicles.
2. Provide hotel shuttle service to public transportation terminals including bus, rail, and
airports.
3. Utilize electric powered, hybrid or flex- fuel vehicles for hotel shuttle and service use.
Light Pollution Reduction: MINIMUM STANDARD - (One of the following is required as a
MINIMUM STANDARD. It is RECOMMENDED that as many as possible of these criteria be
integrated into the project).
Non-roof Heat Island Effect: MINIMUM STANDARD – (One of the following is required as
a MINIMUM STANDARD. It is RECOMMENDED that as many as possible of these criteria
be integrated into the project)
5. Utilize a vegetative open paving grid (at least 50% pervious) for at least 10%
(minimum) of the total combined site hardscape
6. Use a paving material with a minimum Solar Reflectance Index (SRI) of 29.
7. Based on the overall site non-roof impervious surface area, provide native and
adaptive vegetative shade planting (five year grow-in) for 40% of site area.
8. Locate 50% of parking underground.
9. In a parking structure, the top floor/roof level shall have a minimum SRI 29 exposed
surface.
Drinking Water Protection: RECOMMENDED - Locate a project on a site that is NOT in a
“Drinking Water Protected Zone” or other groundwater recharge area.
Protect Open Areas: RECOMMENDED – Limit the site disturbance to 40’ (12 m) beyond
building perimeter; 10’ (3 m) beyond walkways, patios, and surface parking; 15’ (5 m) beyond
roadways and utility trenches; 25’ (8 m) beyond any pervious areas that require additional
staging.
When appropriate orient the majority of guest windows to the north and south in order to
minimize air conditioning load and optimize passive heating in winter. Evaluate exterior
vertical shading for west exposure considering vertical fins, honeycombs, saw tooth
projections or trellises to shade west and possibly east glass. Eyebrows and overhangs
should be considered for southern exposures.
Building Entries: MINIMUM STANDARD – All primary entries shall use revolving doors or
double automatic sliders on a vestibule for high traffic pedestrian areas. Provide vestibules
for luggage and other entry/exit portals. Locate doors to encourage use of revolving doors
and discourage use of swinging doors. Provide windbreaks and/or construct the rest of the
building to minimize stack effect and wind gusts into the public areas of the hotel. Install
walk-off mats or grate systems to capture any contaminants brought into the building from
the visitor’s shoes and clothing.
Exterior Glazing: MINIMUM STANDARD – Insulated double pane (standard and low
emissivity) glass shall be installed into thermally broken frames. Do not use clear glass. Use
lightly tinted glass to reduce solar load yet maintain adequate vision qualities. Where external
noise is a potential problem, use ¼" (6mm) exterior glass, a 2" (50mm) air space with
absorbent sides, laminated glass inside, and 20-year life acoustic caulk at all joints or cracks.
Roof Heat Island Reduction: MINIMUM STANDARD - (One of the following is required as a
MINIMUM STANDARD. It is RECOMMENDED that as many as possible of these criteria be
integrated into the project).
1. High albedo surfaces have both a light color (high solar reflectance) and a high
emmittance to reject heat back to the environment. Approved high albedo roof
surfaces (typically white in color and smooth in texture) shall have a minimum total
solar reflectance of no less than 0.70 (ASTM E-903.)
2. Vegetative roof for 50% of roof area
3. Combination high albedo/vegetative for 75% of roof area.
SUSTAINABLE DESIGN CRITERIA
The design assumption is that the recyclable materials will be collected at least twice a
week. Three scenarios to be considered when designing these facilities include:
Hotels greater than 500 keys – For hotels greater than 500 keys, Operator shall provide
the design team with a preliminary area program that defines the requirements. These
spaces will be based on the location and the type of hotel being planned.
o Adhesives & Sealants: MINIMUM STANDARD – Comply with the “South Coast Rule
#1168VOC” which limits the Volatile Organic Compounds (VOC) of a sealant or
adhesive.
o Paints & Coatings: MINIMUM STANDARD - Comply with Green Seal Standard GS11.
The General Contractor shall maintain the documentation that includes manifests and
Material Safety Data Sheets (MSDS) sheets.
o Carpet Systems: MINIMUM STANDARD - Meet the testing and product requirements
of the Carpet and Rug Institute’s Green Label Plus program. All carpet adhesives shall
meet the VOC limit of 50g/L. The General Contractor and Purchasing Agent shall
maintain the documentation that includes manifests and Material Safety Data Sheets
(MSDS).
o Composite Wood & Agrifiber Products: MINIMUM STANDARD - Specify wood,
agrifiber products, and on-site laminate adhesives that contain no added urea-
formaldehyde resins. The General Contractor shall maintain the documentation that
includes manifests and Material Safety Data Sheets (MSDS).
o Insulation: MINIMUM STANDARD – Specify and install all insulation (excluding piping)
that contains no added urea-formaldehyde.
SUSTAINABLE DESIGN CRITERIA
• Regional Materials - Specify building materials and products that are extracted,
manufactured or assembled into building product components from within 500 miles
(800 Km) of the project site, thereby supporting the regional economy and reducing the
environmental impacts resulting from overseas transportation. Additionally, make efforts to
hire a local labor force that resides within 500 miles (800 Km) of the project site. Percentage
shall be calculated by dividing the cost of the regionally obtained materials, plus the labor
costs for those that reside regionally, by the value of all building materials and products
associated with Construction.
o Use Materials totaling 30%: MINIMUM STANDARD – 30% of the installed building
materials and products are extracted and manufactured, as well as the labor that
resides within 500 miles (800 Km).
o Use Materials totaling 50%: RECOMMENDED –50% of the installed building materials
and products are extracted and manufactured, as well as the labor that resides within
500 miles (800 Km).
Construction Waste Management: Divert construction demolition and land clearing debris
from landfill disposal. Recycle land clearing debris, cardboard, metal, brick, concrete, plastic,
wood, glass, gypsum board, carpet and insulation. Designate a specific area on the
construction site for recycling and track recycling efforts throughout the construction process
(video tape and/or photographic records along with written logs).
• Building Reuse: Extend the life cycle of existing building stock, conserve resources, retain
cultural resources, reduce waste, and reduce environmental impacts of new buildings as they
relate to the materials’ manufacturing and transportation. This criterion excludes windows
assemblies and nonstructural roofing materials.
o Resource Reuse 5%: MINIMUM STANDARD for Renovation Only – Use salvaged,
refurbished, or reused materials, products and furnishings for at least 5% of the value of
building materials. Consider salvage materials such as beams, posts, flooring, paneling,
doors, frames, cabinetry, furniture, brick, etc
o Maintain 75% of existing Walls, Floors and Roof: RECOMMENDED – Integrate 75%
of the existing walls, floors, and roof into the design and execution of the project.
o Maintain 100% of existing Walls, Floors and Roof: RECOMMENDED – Integrate
100% of the existing walls, floors, and roof into the design and execution of the project.
o Maintain 100% of Shell/Structure and 50% of Non-Shell/Non-Structure:
RECOMMENDED – Extend the life cycle of existing building stock, conserve resources,
retain cultural resources, reduce waste and reduce environmental impacts of new
buildings as they relate to the materials’ manufacturing and transportation. This criterion
excludes windows assemblies and nonstructural roofing materials and should include
reuse of 50% of the interior walls, doors, plumbing lines, HVAC ducts, ceilings and
lighting.
• Construction Waste Management Donation and/or Reuse: RECOMMENDED – Recycle
construction related materials by donating these materials to a charitable organization¸
(example: Habitat for Humanity) or recycle the material by remanufacturing the material into
product specific items that are reused in a new or renovated construction.
• Rapidly Renewable Materials 5%: RECOMMENDED – Reduce the depletion of finite raw
materials and long-cycle renewable materials by replacing them with rapidly renewable
materials. Use rapidly renewable building materials and products (made from plants that are
typically harvested within a ten-year cycle or shorter) for 5% of the total value of all building
materials and products used in the project. Some examples of such materials include
bamboo, wool, straw board, cotton insulation, poplar Oriented Strand Board, Sunflower seed
board, wheat board cabinets and others.
• Minimum Indoor Air Quality (IAQ) Performance: MINIMUM STANDARD - All Hotels
are to be smoke-free environments. If not advisable due to location or cultural expectations,
provisions must be made to mechanically satisfy the required air quality by separating and
exhausting smoking areas (holding them at a negative air pressure to surrounding areas) or
providing an alternative to indoor smoking accommodations for guests and staff.
o Hotel Guestrooms Users: Provide individual lighting controls in all guestrooms. These
controls shall allow the guest to adjust the quantity of fixtures illuminated and (as
designed) their intensity. There shall be a master disconnect device at the entry. In
addition to the general lighting, task lighting with individual controls shall be provided in
the work, relaxation, and sleeping zones of the guestroom. In properties that implement
a lighting control system integrated into the energy management system, the lighting
shall have dual occupancy sensors to prevent false readings.
o Meeting Space Users: Provide individual lighting controls in each meeting space
including ballrooms, meeting rooms, banquet rooms, conference rooms, business
centers, boardrooms, and Residences. Each subdivision is to be zoned separately with
local control and master controls. For those meeting spaces that have sound and light
booths, these controls shall be remotely controlled from these booth areas. These
controls shall allow meeting facility users to adjust the quantity of fixtures and light
levels, such as dimming of lamps. These controls shall consist of preset dimmers
providing at least four scenes. In properties that integrate the lighting control system into
the energy management system, the lighting shall have dual occupancy sensors to
prevent false readings.
o Food and Beverage Users: In all Food and Beverage areas including restaurants, bar,
and coffee shops, preset dimmers with at least four scenes and lockout shall be
provided. In the general dining area, these dimmers shall not be readily accessible to the
general public but shall be for control by the venue’s management. In special individual
dining rooms, the user control shall follow the requirements of meeting space users.
o BOH Users: In the back of house, the lighting control systems shall be zoned into work
areas and shall have a control sequence based on usage.
Lighting that serves general use 24-hour activity areas shall be controlled
centrally.
Areas that have fixed operational schedules such as engineering shops and
kitchens shall be controlled at the primary use zone using a time clock system
and motion detectors.
Areas that are accessed infrequently such as storage and housekeeping rooms,
the lighting in this room shall be controlled with motion detecting sensors.
Areas where there are numerous users performing individual tasks such as open
cubicles in administration areas or front desk clerks, task lighting shall be
provided with individual controls and dimming to provide users with personalized
lighting controls.
SUSTAINABLE DESIGN CRITERIA
also be equipped with a micro-switch that disconnects the HVAC unit(s) when they are open.
• Thermal Comfort, Design: MINIMUM STANDARD – Design and install HVAC to the
ASHRAE Standard 55-2004 Thermal Comfort Conditions for Human Occupancy standards.
This criterion is an interpretation of environmental conditions such as air temperature, radiant
temperature, humidity and air speed. It factors in personal items such as metabolic rates and
clothing levels.
• Thermal Comfort, Verification: MINIMUM STANDARD – Survey the building occupants 6
to 11 months after substantial completion. Ownership shall ensure this survey is performed
that obtains feedback from all user groups including room guests, meeting facility users, and
The Operator associates. AHSRAE Standard 55-2004 Thermal Comfort Conditions for Human
Occupancy supplies criteria to validate the survey. If less than 80% of the occupants respond
favorably to the anonymous survey, corrective action must be taken. The timing for this
survey shall coincide with the General Contractor’s warranty period so that all corrective
actions can be addressed as part of the GC’s contractual obligations.
• Acoustical Quality: MINIMUM STANDARD – Design and verify that the background sound
levels, reverberation decay times, speech intelligibility, and sound isolation meet the
established industry standards for each occupied space. HVAC, vibration isolation, surface
finishes, floor and ceiling finishes and intermittent noise sources shall be identified to mitigate
noise sources.
• Daylight & Views - Utilize design and planning techniques that include building orientation,
increased building perimeter, specialized glazing and advanced controls to provide the
maximum amount of natural light into the regularly occupied spaces.
o Daylight 75% of Spaces: MINIMUM STANDARD - Provide a minimum 25-foot candles
of natural light into at least 75% of all regularly occupied spaces.
o Daylight 90% of Spaces: RECOMMENDED - Provide a minimum 25-foot candles of
natural light into at least 90% of all regularly occupied spaces.
• Construction Indoor Air Quality (IAQ) Management Plan, Before Occupancy:
RECOMMENDED - Collect air samples upon the completion of a project in the spaces to be
occupied. Utilize a certified laboratory, IAQ specialist, or Industrial Hygienist to collect and
test these samples. Upon verification that these tested air samples comply with the
stipulated thresholds, the spaces can be occupied.
If the air quality readings are not acceptable for the building square foot area (or square
meter area), the space shall be mechanically “flushed out” with a minimum air volume of
14,000 cu. ft/sq. ft. (or 4,267 cu. m/sq. m) This can be achieved with the existing HVAC
system, but the use of portable blowers and fans placed in strategic areas of the building
SUSTAINABLE DESIGN CRITERIA
may be utilized to assist in achieving these results. Once this criterion has been satisfied,
the building can be occupied.
• Outdoor Air Delivery (OAD) Monitoring: MINIMUM STANDARD – Install permanent
monitoring systems to provide feedback on ventilation system performance to ensure that
design minimum ventilation requirements are maintained. Provide appropriate controls for
both densely occupied and non-densely occupied spaces. The Building Automation System
shall generate an alarm when conditions are not per established parameters.
• Increased Ventilation: RECOMMENDED Increase the OAD by 30% to all occupied spaces.
Develop and implement an acceptable approach that shall benefit the mental and physical
health of the occupants, guests, and associates.
Water Efficiency:
• Wastewater Reduction: MINIMUM STANDARD – Reduce the potable water used in the
building for sewage conveyance by 50%. There are several methods to achieve this
standard. Some examples include:
o Use low-flow toilets and urinals, showerhead with restrictors, and sinks with low-flow
faucets.
o Use of non-potable water shall be evaluated and implemented where possible.
Examples of these methods include use of captured rainwater, recycled grey water, and
on-site or municipally treated wastewater to meet the required 50% reduction.
o Treatment of 50% blackwater on-site to tertiary standards. This treated water must be
infiltrated or used on the site.
o Water Use Reduction – 20%: MINIMUM STANDARD – Reduce the water use,
excluding irrigation, of a property by 20% from baseline established by the 1995 National
Energy Policy Act. The calculations are based on estimated occupant (all user groups)
usage and shall include only the following fixtures: water closets, urinals, lavatory
faucets, showers and kitchen sinks. This requirement is achieved by implementing the
use of low-flow fixtures. The baseline standard shall use the following for all areas of a
hotel including Public Areas, Back of House, and Guestrooms/Suites:
Public Area faucets and flush valves equipped with automatic sensors can further be
utilized to help with this process. Consideration shall be given to storm water and grey
water for non-potable applications, such as toilet and urinal flushing and custodial uses.
Public area faucets and flush valves equipped with automatic sensors can further be
utilized to help with this process. Consideration should be given to storm water and grey
water for non-potable applications, such as toilet and urinal flushing and custodial uses.
Landscaping Water Efficiency- Develop and provide a landscaping design that allows the
reduction or elimination of irrigation water for the vegetative areas on the hotel property.
Commissioning
• Commissioning of the Building Energy Systems: MINIMUM STANDARD – Verify that all
the energy related systems are installed, calibrated, and perform based on the project
requirements, design, and construction documents. The commissioning process shall
ensure reduced energy use, lower operating costs, and improved occupant comfort. Initiate
the commissioning process during the beginning of the design process and following the
scope below:
Energy Performance
Minimum Energy Performance: MINIMUM STANDARD – Establish a minimum level of
energy efficiency for the building and systems. The design must comply with the mandatory
provisions of ASHRAE/IESNA Standard 90.1 – 2004 in Section 5.4, 6.4, 7.4, 8.4, 9.4 and
10.4 and the prescriptive requirements in Sections 5.5, 6.5, 7.5 and 9.5. Alternatively to the
prescriptive requirements, the performance requirements of the same Standard addressed in
Section 11 may be met.
Scope of requirements addressed by ASHRAE 90.1 – 2004: Energy Standard for Buildings
Except Low-Rise Residential is as follows:
Section 5: Building Envelope.
Section 6: Heating, Ventilation and Air-conditioning (including parking garage ventilation,
freeze protection, exhaust air energy recovery and condenser heat recovery for
service water heating).
Section 7: Service water heating (including swimming pools).
Section 8: Power (including all building power distribution systems.
Section 9: Lighting (including lighting for exit signs, building exterior, grounds and parking
garage).
Section 10: Other equipment (including all permanently wired electrical motors).
Energy Performance Optimization: MINIMUM STANDARD – Ensure that the building’s
energy performance will exceed the established baseline by a minimum of 15%. Provide a
whole building Energy Simulation using the Building Performance Rating Method included in
Appendix G of ASHRAE/IESNA Standard 90.1 – 2004, which includes the comparison of the
building design against a baseline building that complies with Appendix G. Some of the
fundamental strategies that can improve energy performance are reducing demand,
harvesting free energy, increasing efficiency and recovering waste energy.
Measurement & Verification: MINIMUM STANDARD – Develop a Measurement and
Verification plan that evaluates the building’s energy systems performance, for a minimum of
the first year of building’s operation after the completion of its construction. International
Performance Measurement & Verification Protocol (IPMVP) Volume III: Concepts and
Options for Determining Energy Saving in New Construction, April 2003, to be used for this
purpose. The plan shall be consistent with Option D of IPMVP (Whole Building Calibrated
Simulation, Savings Estimation). Compare the actual energy use of the building and its
systems with the performance predicted by a calibrated computer model. Calibrate by
adjusting the as-built simulation to reflect the actual operating conditions and parameters.
Install the necessary metering devices to measure energy use, track the performance of
estimated compared to actual performance by component or system to evaluate the energy
efficiency. (Reference source United States Green Building Council's (USGBC) LEED)
SUSTAINABLE DESIGN CRITERIA
Refrigerant Management
• Refrigerant Management: MINIMUM STANDARD – Specify that no Chlorofluorocarbons
(CFC) based refrigerants shall be used in the heating, ventilating, air-conditioning and
refrigerating systems of a building to help reduce ozone depletion. If existing HVAC systems
contain CFC and these systems are reused, develop a replacement schedule for these
systems.
Specify that refrigerants shall comply with the Montreal Protocol, don’t contribute to ozone
depletion, and minimize direct contributions to global warming.
Establish a threshold for the combined contributions to ozone depletion and global warming
potential. The formula providing the upper limit for these combined contributions is as follows:
LCGWP + LCODP x 105 ” 100
Where LCGWP is the Lifecycle Direct Global Warming Potential in pounds of carbon dioxide
per ton-year and LCODP is the Lifecycle Ozone Depletion Potential in pounds of CFC11 per
ton-year. In both cases, ton refers to the unit of cooling capacity of refrigeration systems.
For detailed calculations of this threshold for the combined contributions to ozone depletion
and global warming potential, please refer to LEED for New Construction and Major
Renovation Reference Manual Version 2.2.
Introduction
The hotel safety and security systems shall provide an integrated solution comprising
pro-active planning and re-active components and installations together with operational
procedures. The objective shall be to provide full security coverage for the building and
it's occupants in alignment with the security consultant's analysis of threat, vulnerability
and hazards. Note that this chapter should be read in conjunction with its corresponding
Engineering Recommendations and Minimum Standards chapter, “Security Systems”.
Design Requirements
The following table illustrates examples of the various pro-active and re-active measures
that are required as minimum standards. However the cause and effect, hazard and
consequence matrices developed by the Security Consultant may indicate that specific
and additional requirements shall be necessarily included as minimum standards.
152
AREA PRO-ACTIVE PLANNING RE-ACTIVE
COMPONENTS
Perimeter Wall, Fence. Infrared/Radio/Microwave
Embankment. Beam.
Interactive CCTV
Gateways.
Coverage.
Lighting.
Security Round Control
Watchtower. Points.
Intercom and
Loudspeaker.
Approachways Barriers. Interactive CCTV
Traffic Devices. Coverage.
Radio Frequency
Guard Stations.
Transponders.
Guard Station Equipment.
Intercom and
Loudspeaker.
Access Points: Vehicular-guests, goods, Radio Frequency/Smart
Authorized and Forced visitors. Card Readers and Lock
Entry Pedestrian-guests, goods, Systems.
visitors. Interactive CCTV
MEP air intake/exhaust, Coverage.
rooftop, utility routes. Door/Facade Sensors.
Architectural-material X-ray/Bomb/Metal
selection. Detectors.
Interior areas Space Planning. Interactive CCTV
Specific Area Coverage.
Requirements. Loss Prevention
Equipment.
Security Equipment.
Pro-Active Site and Building Planning
Perimeter Protection
The nature and extent of the perimeter protection required shall be specific to the
property and the Security Consultant's analysis. Pro-active planning shall involve the
Security Consultant and architect. Minimum requirements shall include:
- Walls; the design form must coordinate with the building architectural materials
and details while the functionality must provide full security coverage.
- Fences; may be used at low profile areas where aesthetic concerns are reduced
and security requirements allow.
Approachways
Approachways shall be planned to provide a natural control of pedestrian and vehicular
traffic. Routes shall be configured to provide the necessary "choke points" for barrier
protection, traffic devices and locating guard stations.
All barriers shall be constructed in a manner and from materials that are consistent with
the required level of security.
154
- Guard Stations; these shall be provided at appropriate locations such as manual
or automatic gateways and/or check points. They shall be constructed from
suitably selected materials that coordinate with adjacent buildings and provide
the level of protection for the occupants and the installed systems.
- Vehicular and Pedestrian Access; the planning shall address the varying level of
security and visibility of security required for guests, goods and visitors.
- MEP and Utility Routes; the planning shall address sub-terraning, surface and air
connections and provide specific deterrents for air intakes/exhausts, rooftop
access and critical exposed MEP plant installations.
Interior Areas
The Security Consultant shall liaise with the Architect and Interior Designer in the space
planning, material selection and specific area requirements. Certain interior areas may
be classified as high risk areas and require additional planning and co-ordination:
- Main entry, employee entry, receiving dock, cashier's offices, front desk, and
elevator lobbies.
155
Operational Procedures Concept
- The main security center shall be the location for installing and operating all
security systems. In addition duplicate/remote panels and operations shall be
made available at the Hotel Communication Center and/or front desk area.
- The Main Security Center shall also be the location for all other Life Safety
Systems such as fire detection, alarm and notification, evacuation, gas detection
and all other systems as specifically required at the property and shall provide
continuous 24 hour coverage of the property. Duplicate and/or remote panels are
required for specific operational requirements.
- The Main Security Center shall be suitably sized to provide the required area for
all systems to be installed, their operation and maintenance together with the day
to day administration of all security personnel.
- As such its location shall be coordinated by the Architect and Security Consultant
and shall be reviewed and approved by the authorities having jurisdiction over
the project.
156
Attachment
Security Systems
- “Security Systems”
(Excerpted from ERMS Version 3.0)
Operational Concept
Hotel security is a growing concern among travelers throughout the world. One only has
to look at the negative impact on hotel bookings, following a highly publicized tourist
attack, to see how important the perception of security is to the traveler.
When there is a choice, travelers will seek out a hotel property that has superior security
features and services, particularly if the destination is considered to be a potentially high-
risk environment for crime or terrorism. It is therefore compelling in today’s business
environment that security considerations are fully integrated into the design and
development attributes of a property.
SECURITY SYSTEMS
- Assistance provided to the Architect during the Design Development (DD)
process.
- Construction Documentation (CD) preparation assistance.
- Tender and Negotiation assistance.
- Construction Management / Oversight.
- Testing / Commissioning.
Security Consultant Selection Criteria
The following list will describe the information that will be requested and used by
T.S. in the vetting process and the selection of approved Security Consultants:
- Applicable Licensing and / or Certification of Project Director / Lead Consultant.
Acceptable licenses / certifications include:
Professional Engineer (PE) OR
Certified Protection Professional (CPP) OR
Physical Security Professional (PSP) OR
Applicable certification / experience gained through direct employment and
formal training from a military service or government agency specifically
relating to physical / facility security.
- Independence Attestation: No affiliation with security equipment suppliers,
manufacturers or distributors.
- Qualifications and Relevant Hotel Experience: Project size, location in the world,
complexity and overall security environment.
- Client References: Three references from recent project work. One client MUST
be from a Hotel / Hospitality organization.
- Defined Methodology: Identification of the exact industry-accepted methodology
used during assessment and design work.
- Resume and Profiles: of the Project Director / Lead Consultant and Relevant
Staff
Static Barriers
The hotel’s perimeter should be clearly marked for both business and legal purposes so
that the line between public and private property is delineated. Walls, fences and natural
barriers are common structures for marking territory, controlling access to a facility and
to effectively deter or delay an intrusion attempt. The nature of a perimeter wall, fence or
natural barrier is to:
• Provide a legal boundary.
• Control & allow screening of authorized entries.
• Allow early detection of an intruder.
• Deter casual intruders.
• Cause an intruder to take an overt action that demonstrates intent.
• Establish a physical & psychological deterrent.
• Allow for effective use of officer & security monitoring forces.
• Make unauthorized entry difficult.
• Delay entry time, providing more chance for detection.
Static Barrier Requirements
• Must extend throughout the perimeter of the property and in accordance with needs
outlined in available security assessment / basis of design reports. Barriers can be
natural (e.g. a river) or manmade. Manmade can be as follows:
- Walls
Walls must be at least 3 meters high.
For locations where increased risk of crime is known, walls may include a top
guard of 3 or 4 strands of barbed wire set at a 45 degree angle away from the
interior of the compound. This application must be coordinated with T.S.,
where required.
Openings such as culverts, tunnels, or manholes that extend under the wall
must be secured when larger than 620 sq cm.
Maintain clear zones of at least 90-150 cm on both sides of the fence.
- Bollards
88 cm high, 32 cm width, 154 cm foundation.
Ornamental steel trim or cast sleeves.
Galvanized for corrosion.
Spaced no greater than 1.5 meters apart.
- Fences
Fences must meet functional, environmental, local legal requirements and the
aesthetic needs of the business and community settings. If a chain link fence
surrounds the perimeter, it must consist of nine-gauge wire with a 50 mm
mesh. The height of the fence will depend on the projected risk to the area,
but 2.4 meters is the minimum.
For locations where increased risk of crime is known, three-strand barbwire
(top guard) placed on a forty-five degree angle away from the interior is also
required. This application, where required, must be coordinated with T.S.
- Fixed/Portable Barriers
Concrete.
Cable.
Mechanical (hydraulic, electrical).
SECURITY SYSTEMS
Active or passive.
These can be used in layers across entry roads, thereby slowing down vehicles,
and to allow for reaction time from security personnel at entry points.
- Gates
Gates are breaks in perimeter barrier and therefore must provide the same
level of protection as the rest of the barrier. Where used, they must be
securable and able to withstand penetration by a vehicle.
Use as few gates as possible. Establish a balance between traffic flow
requirements and security considerations.
Gate construction material must be consistent with that of the surrounding
fence material.
Leaf hinged gates are prohibited.
Appropriate restricted access and traffic control signs must be posted to
indicate that vehicles should proceed only upon instructions from the gate
attendant.
- Gate Standards
Secured either electronically or with heavy-duty padlocks and case hardened
chains.
Drop-arm type gates with enough arm overhang to prevent it from slipping
easily off its hooked position. Sufficiently rigid to deter unauthorized entry by
bypassing, pushing through or scaling.
Arms extending at least 60 cm beyond the bollards placed at both ends and
opening mechanism must be chain-driven.
Automatic gates function manually as “fail safe”. Single locking, manual
locking device does not require the use of a chain.
Properties determined to have an Elevated Security Environment
- Must incorporate static perimeter barriers that adequately prevent unscreened
vehicles / persons from entering the standoff zone.
- Barriers must provide a uniform level of protection throughout the perimeter.
- Resort properties with unsecured beachfront will use a combination of
manpower, natural terrain and barrier walls in such a way that provides the
maximum level of protection along the beach perimeter that does not diminish
the aesthetic quality of the property.
Vehicle Barriers
Vehicle barriers’ purpose is to first prevent unauthorized vehicle access into a
predetermined standoff zone without being authenticated or physically screened and
searched by security personnel. Vehicle Barriers range from conventional traffic control
barriers used in parking garages and surface lots to crash-rated vehicle barriers
deployed at locations where a heightened security risk is present.
Vehicle Barrier Requirements
• Conventional traffic control barriers are acceptable for locations where control of
vehicle access to surface parking, garage parking or loading dock locations is
warranted as a result a crime risk.
• Crash-rated dynamic (operable) vehicle barriers should be employed at all vehicle
entrances for locations where control of vehicle access to surface parking, garage
parking or loading dock locations is warranted as a result of a terrorism risk.
SECURITY SYSTEMS
• Traffic controllers enforcing one-way traffic flow at all exit locations may be installed
at dedicated exit points upon approval by T.S. at certain locations where the
reduction of vehicle access points is not possible and determined to be impractical to
install crash-rated vehicle barriers at all access points.
• For high volume areas, a series of barriers can also be employed.
• Vehicle barriers must be designed considering vehicle throughput.
• Suitable Traffic Control Barriers include:
- Parking Control Arms.
- Parking Control Sliding Gates.
• Suitable One-Way Traffic Controllers include:
- Tiger Tooth and related tire shredding devices
• Suitable Crash-rated Vehicle Barriers include:
- Raising Bollards.
- Surface Mount Plate Barriers.
- Cable & Chain Beam Barriers.
- Drum Barriers.
- Gate Barriers.
Drum, Plate and Bollard Barriers are generally the fastest acting, however Beam
barriers may be the least obtrusive.
Dynamic (active) crash-rated vehicle barriers can be hydraulic, electric or pneumatic
operated. The preferred method of operation is electric but hydraulic barriers are
acceptable; pneumatic should be avoided wherever possible.
Vehicle Barrier Standard
• All vehicle barriers deployed as a result of the risk of terrorism must have passed a
government-sponsored crash test including, but not limited to:
- United States of America (USA) Department of State (DS) Crash Test
Certification where the barrier achieved a rating of K4 / L1 or greater.
Dynamic barrier with a rating greater than K4 / L1 may be required for loading
docks or vehicle paths where a speed greater than 48 kph is possible.
- United Kingdom / British Standards Institute (BSI) specification PAS 68:2007
where the barrier successfully prevented a penetration of a 6,800 kg vehicle
traveling at 48 kph.
- Applicable foreign government standard that attests to a successful barrier crash
test where the barrier successfully prevented a penetration of a 6,800 kg vehicle
traveling at 48 kph.
- Drum and Plate barriers should be able to be erected in a maximum of 3 seconds
in an emergency and in 3 to 15 seconds during normal operations.
- Beam barriers should close within 15-20 seconds.
- Depending on the barrier operation, excavation and suitable drainage will be
required with typically a 1.3 m depth for hydraulic operated barriers that require
regular maintenance.
- Dynamic barriers must be used in conjunction with static barriers installed
throughout the perimeter of the property that create the setback and / or standoff
distance.
SECURITY SYSTEMS
Landscaping
Landscaping at a property is an integral part of the overall site security plan and must be
incorporated into the site design at on the onset.
Landscaping Requirement
• Six areas of the site must be reviewed by the Landscape Architect including:
- Street.
- Parking Lanes.
- Sidewalks.
- Grounds.
- Building Exterior.
- Building Interior.
• Landscaping should not create a fortress-like effect but should be developed to
reinforce perimeter site security.
• Landscaping should not create areas where people or equipment can be easily
concealed.
• Landscaping should be designed with consideration given to reducing long-term
maintenance requirements.
• Landscaping should be minimized at main entry points to limit the potential for
Improvised Explosive Devices (IED) concealment.
• Natural terrain and Crime Prevention Through Environmental Design (CPTED)
principals shall be used as described below.
Landscaping Standard
• Site grading should limit and direct pedestrian access.
• Perimeters along beachfronts should incorporate both hardscape and softscape
landscape features to define the hotel’s perimeter.
• Ponds, lakes and streams will be considered as adequate perimeter control to
prevent vehicle access, where applicable.
SECURITY SYSTEMS
• Shrubs along driveways, walkways and doors and gates should be no more than 60
cm high.
• Small gravel extending two feet from the building façade may be appropriate. Large
rocks and stones are prohibited.
• Tree limbs should be at least 2.15 m off the ground.
• Shrubs near a building should be no greater than 90 cm high.
• Landscaping should ensure a clear line of sight from public roadways.
• Thick borders of shrubs or a hedge should be used along beachfront perimeters to
reinforce the property line and monitor individual movement to and from the beach,
where appropriate and applicable.
Lighting
Lighting helps to decrease crime and provides a strong deterrent to intruders, prowlers
and vandals. Good lighting promotes a more secure environment because it illuminates
those who threaten your property and its occupants. In addition, security lights help to
prevent accidents due to inadequate lighting.
- For locations, Security Lighting must be supplied at entryways for both people and
vehicles. Parking lots and garages and Loading docks.
- Lighting at Hotels determined to be in an Elevated Security Environment shall be
equipped with additional lighting in the following locations:
Grounds.
Beach.
Vehicle Screening Locations.
Pedestrian Screening Locations.
Perimeter.
Please refer to the Lighting Systems chapter of the ERMS.
Parking
Parking Requirements
• Exterior building perimeter areas must be illuminated to a minimum maintained level
of 10 lux (one foot-candle) at ground level.
• Open parking lots must have a central control point for access and have the ability to
be monitored via human or technical surveillance where appropriate.
• Physical access measures shall be in place to control parking and limit the facility’s
use to the identified group (hotel guests, visitors, employees, etc.) where necessary
based on the risk of crime, terrorism or related vulnerabilities.
Parking Standard
• Surface Parking
- Surface parking shall be clearly defined with posted signs indicating the area is:
Private property.
Reserved for registered guests of the hotel and their visitors.
Limitation of the hotel’s liability to guest vehicles and belongings.
• Valet & VIP Vehicles
- There must be designated parking for these vehicles and they must be under
constant control and/or surveillance at all times.
SECURITY SYSTEMS
• Doors shall be designed so that the lock cannot be reached by breaking out a
vulnerable panel, such as glass.
Exterior / Perimeter Door Standard
• Door hinges shall be designed so that the pins cannot be pulled from the outside.
• Door frames shall be constructed or reinforced to resist spreading or other
tampering.
• Latch bolts shall be designed to (or reinforced to) prevent being sprung by a thin
instrument from the outside. Exterior doors shall be equipped with a metal “pry plate”
to avoid being sprung.
• Any doors controlled by an on-line access control system shall contain
electromechanical locks or electric strikes. These doors should be programmed to be
“fail-safe” and interface with the hotel’s fire alarm system as appropriate.
• Exterior doors shall be equipped with emergency release mechanisms in accordance
with health and safety requirements and concerns.
• Panic hardware shall be installed on locked entrance/exit doors allowing exit in an
emergency, i.e. "push bar.”
• Alarm shall sound at the SCC and locally when doors are opened unauthorized.
• Guest Entry Doors
- The primary doors or “Main Entrance” should be in close proximity to the Guest
Check-in Desk.
- Shall include CCTV.
- Shall include security screening stations for properties considered to be in areas
with an Elevated Security Environment.
- Shall be controlled via electronic security method. Where possible, guest entry
doors shall be controlled via guest keycard lock devices.
- Should be limited in number wherever possible.
• Tenant Entry Doors (where applicable)
- Shall include CCTV.
- Shall include security screening stations for properties considered to be in areas
with an Elevated Security Environment.
- Should be limited in number wherever possible.
• Employee / Contract Worker Entrance
- Shall include CCTV.
- Shall include security screening stations for properties considered to be in areas
with an Elevated Security Environment.
- Shall be secured and controlled at all times via either an off-line guest keycard
reader or an on-line access control reader.
- Should be limited to one Employee / Contract Worker Entrance.
• Emergency Exits:
- May be maintained in the latched/closed position by electrical power. Loss of
power shall automatically unlock secured doors.
- Shall be equipped with panic devices that do not require prior or special
knowledge or effort by building occupants to exit. Pushing of the panic device
shall automatically unlock secured doors.
- All centrally lockable doors shall be fully addressable to allow full control of
locking and unlocking from the main security center and all duplicate/remote
locations.
SECURITY SYSTEMS
- Fire stairwell doors and emergency egressways shall be identified with signage
and shall be in accordance with prevailing federal, state and local laws (i.e. 6-A
North, 6-B South marked on the doors).
- Fire stairwells shall be kept free of obstructions and combustibles.
• Loading Dock Doors:
- Provide roll down overhead doors, which are lockable from the inside.
- Loading docks and overhead dock doors shall be monitored at all times.
- The overhead dock doors shall effectively restrict access into the hotel during
times when the loading dock doors are left open.
- Should incorporate CCTV.
Interior Doors / Areas
• Guestrooms:
- Guestroom doors shall be solid core. Door frames must be reinforced.
- See more requirements in the DRMS standards. In addition, Connecting Doors
shall be equipped with a passage lever door handle set (one handle only) and a
deadbolt lock with a thumb-turn unit and a 25mm throw bolt. As an option, the
thumb-turn can be replaced with a keyed 6 pin cylinder.
• Executive/Presidential/Chairman Suites:
- Corridor surveillance cameras with a local monitor in the suite.
- Ballistic film on windows.
- Self-contained HVAC and Telecommunications
- Analog Telephone line or a line that bypasses the Hotel PABX
- Connecting room.
- Adjacent standard guestrooms for security personnel and aides.
- Reinforced walls, ceiling and floor.
• Guestroom Floor Corridors:
- Floor reentry from emergency stairwells shall be minimized wherever possible,
except during evacuation and selected operational use.
- Any restriction on floor reentry shall be consistent with NFPA 101 where the use
of hi-tower electro-mechanical locking devices on stairwell doors be installed and
interfaced with the hotel’s fire alarm system to unlock when required.
• Function Rooms:
- All doors leading into a Function Room should be secured through the use of
electronic locks associated with the hotel’s off-line guestroom keycard system.
• Restricted Areas in BOH:
- Where on-line access control systems are not present, all corridors leading into
critical BOH areas shall be secured through the use of electronic locks
associated with the hotel’s off-line guestroom key system.
- Where on-line access control systems are present, all corridors leading into
critical BOH areas shall be secured through the use of a card reader and electro-
mechanical lock that is actively monitored.
- Critical areas within BOH that require locking mechanisms include:
IT / MDF / IDF Rooms.
MEP areas.
Liquor storage.
Executive and Management offices.
High Value Storage.
Locker rooms.
SECURITY SYSTEMS
• All entry/exit doors accessible from ground level shall have access control and be
covered by CCTV cameras from the exterior.
• Each door located at the building(s) perimeter shall be equipped with sensors to
monitor and report the status of the door position. These shall be monitored to
ensure they return to a closed and locked position after opening.
• A limited number of perimeter doors may be fitted with card readers for access
control, including entrance to the hotel via overhead walkways, underground parking,
employee entrances or adjacent / interconnected businesses.
Windows
Window Requirements
• Windows at all Hotels must include the following:
- Windows in ground floor lobby areas and other public areas with exterior
windows such as restaurants, waiting areas, etc. must include laminated glass.
- Where windows at upper levels are operable, the maximum width of the opening
can be no more than 10 cm.
- Exterior, ground level windows shall be equipped with emergency release
mechanisms in accordance with health and safety requirements and concerns.
- The locks on exterior ground-level windows shall be made inaccessible to
someone intent on breaking the window. By use of decorative metal grills or
heavy gauge wire mesh to augment security of window on entry.
• In an Elevated Security Environment may be equipped with one or more of following
additional security enhancements windows:
- Blast-resistant window film on exterior windows in:
Lobby areas.
Public areas with exterior windows (restaurants, waiting areas, etc.).
VIP or Presidential suites to reduce ballistic attack impact.
- Blast-resistant window blinds or treatments that one used as a way to deflect the
impact of an explosive as an alternate under certain conditions.
- Blast-resistant laminated glass.
- Ground-level windows shall be monitored by detection devices (alarms).
• Where windows are enhanced to mitigate the affects of an explosive or bomb blast,
the following standards will apply:
- All blast mitigation applied to exterior windows must conform to the United States
General Service Administration (GSA) blast protection condition 3b, equivalent
conditions set forth in the Interagency Security Committee (ISC) Security Design
Criteria or greater.
- All window laminate must include GSA certified mechanical, wet glaze anchoring
systems or other similar structural adhesive systems on all film to increase its
effectiveness and ensure laminate is anchored to the frame.
• Where windows are enhanced to mitigate the affects of a ballistic, the following
standard will apply:
- Windows must conform to Protection Level 4 using Underwriter’s Laboratory (UL)
standard UL 752.
- The total system of anchor, frame, door material and glazing material must
absorb the energy from the projectile.
- The framing system must also be capable of stopping the potential threat and
retain the glazing system during attack.
SECURITY SYSTEMS
- Installing bullet resistant glazing in a non-certified frame will not ensure the
desired level of protection.
- Any ballistic glazing certified to meet a ballistic standard, must be retained in a
certified framing system.
- Transponder Card:
Contactless RFID transponder card.
Complies with ISO 7810 for transponder technology.
Contains secure manufacturer's unique code in secure, read only memory.
Writeable, re-codable memory.
Compatibility with COM multi-application requirements.
- Smart Card:
Contact chip, upgradeable, transponder chip upgradeable.
Complies to ISO 7816-1 or as revised.
Contains secure manufacturer's unique code in secure, read only memory.
Writeable, re-codable memory.
Compatibility with COM multi-application requirements.
- Key Issuing Computer and Encoder:
PIN security protected for each individual user and selected security levels.
Audit trail of date, time and log-in ID of issuer for creation of each guest and
staff key.
Mains powered and/or battery power for mobile units.
Direct interface with property management and point of sale systems via RS
232 or TLP/IP.
Minimum programmable 16 coded log-in users for front desk units and mobile
units.
Manual key encoding override in event of property management system
failure.
Built in reader, as applicable, for either smart or transponder card.
- Portable Interrogator:
Lock systems using radio frequency transponders must be able to work on all
areas of the property.
• Guest Room Door Locks
- Must be suitable for installation with rebated door and rebated door frame.
- Available in DIN Euroset standard, optional ANSI standard mortise locks with
prior written approval from T.S.
- Must be suitable for fitting with third party specified lever or knob.
- Must achieve a minimum fire rating of 90 minutes for DIN Euroset, or 30 minutes
for optional ANSI standard.
- All electronic circuitry and components must achieve a minimum rating of IP 54
for transponder locks and IP 31 for smart locks.
- Minimum audit trail of preceding 500 entries with timing and or algorithmic
protection for unauthorized and sequentially repeated events.
- Latch bolts shall be designed to (or reinforced to) prevent being sprung by a thin
instrument from the outside.
- All locks shall be maintained in good working condition and mounted so that they
cannot be pried off.
- Audit trail to chronologically record all lock activities including: card use, card ID,
chronological sequence and time of activity, duration between events, lock and/or
door status, door opening and closing sequence, mechanical key override.
- Audit trail memory to be secured with interior room side battery location or with
hidden and high security back up battery location.
- Colored LED indication on corridor side for all unauthorized and out of sequence
activities.
- Colored LED indication on corridor side for low battery.
SECURITY SYSTEMS
- Colored LED indication for dead lock confirmation signal to be displayed only
when authorized keys are presented.
- Colored LED indication on corridor side for authorized card acceptance and lock
operation
- AA type battery.
- Hidden high security mechanical override for emergency access.
- Removable cylinder with re-codable three-level hierarchy facility using sequential
master key.
- Lock set must be minimally equipped with lever or knob on corridor side and
code compliant lever on room side.
- Lock set must have the following minimum functions: anti-friction latchbolt, anti-
thrust device and automatic dead bolt.
- Anti friction latchbolt and anti thrust device must have a minimum throw of 20 mm
and be extended when door is open and when closed and aligned correctly with
strike plate.
- Automatic deadbolt must have a minimum throw of 20 mm for DIN Euroset
standard, or 25 mm for optional ANSI standard, and is thrown when the door is
closed properly and the latch and anti thrust device are aligned with strike plate.
- Outside lever or knob retracts latchbolt and deadbolt only when an authorized
key card is used. Programmable timing feature to ensure only a single opening is
allowed by each authorized card reading.
- Inside lever is equipped with a panic device and will always retract latchbolt and
deadbolt when used.
- Tactile or audible feedback to confirm the automatic dead lock function is
activated by a thumb turn device located on the room side.
- Confirmation of automatic dead lock indication is given on the interior of the room
by either a mechanical indicator or by a LED which is permanently lit.
- When automatic dead lock confirmation is activated, an incorrect or service key
card will illuminate exterior colored LED indications indicating that the key was
read but access is denied due to confirmed dead lock activation. The guest
should not be disturbed by this event.
- Confirmed dead lock function can be overridden by authorized or emergency key
card or by mechanical key.
- Finish as specified by Interior Designer or Architect to match all other hardware
on same door.
- Weather proof to a minimum IP rating of 31 for outdoor and damp areas.
- Guest rooms approved for balconies must have balcony doors with a decal and
interior lock that is unable to be bypassed. The lock must be childproof.
- Room doors shall have an automatic closure that is in working condition.
- Two separate locking devices shall be installed on sliding doors with instructions
posted on the door regarding lock operation and safety reminders.
- Connecting Doors should be equipped with a passage lever door handle set (one
handle only) and a deadbolt lock with a thumb-turn unit and a 25mm throw bolt.
As an option, the thumb-turn can be replaced with a keyed 5 pin cylinder.
• Back of House Door Locks:
- All features are same as guestroom units with the following options:
Remotely mounted card reader unit with on and or off line connectivity.
Programmable access delay.
- Portable Interrogator:
Individually PIN or system key protected and requires additional PIN or
system staff key authorization for service or emergency openings.
SECURITY SYSTEMS
Elevator Security
Elevator Security Requirement and Standard
• Elevators designed for guest use shall be designed in such a way that one set of
elevators service underground or attached parking garage (where applicable) with
accessibility only to common areas of the hotel and a second set of elevators serve
the guestroom floors. Unrestricted access to a guestroom floor from a parking deck
shall not be provided.
• Where possible, transfer from elevators servicing parking facilities to elevators
servicing guestroom floors shall occur at the lobby level and require individuals to
proceed past the front desk.
• Consideration shall be given to restricting floor access to guestroom floors whereby
the use of a valid hotel credential is required.
Elevators in properties considered to be in an Elevated Security
Environment
• Guest Elevators
- All guest elevators must be fitted with an access control system that is
compatible with the guest card system of the hotel.
- All guest elevator vestibules must be under constant video surveillance.
- Where the determined security risk is as a result of crime, individual elevator
cabs may be equipped with video surveillance.
• Service Elevators
- Same requirements as the guest elevators except cabs to be equipped with
video surveillance.
Critical Infrastructure
This section pertains to requirements for the following:
• Power
- Incoming Main switch gear.
- Transformer.
- UPS (Uninterruptible Power Supply).
- Emergency Generator and auxiliary equipment room.
• Water Supply and Storage.
• Air Handling Units.
• PBX (telephone private branch exchange).
• Heating and cooling Plant (boilers, etc.).
• Fuel Oil Supply and Storage.
SECURITY SYSTEMS
CCTV Requirement
• Video surveillance cameras shall be monitored at all times by dedicated on-site
security force manning a Security Control Center.
• Digital Video Recorders (DVR) and Network Video Recorders (NVR) are the only
approved recording devices.
• Video shall be captured by high-resolution color cameras that are capable of
adjusting to the changes of day to night lighting so as to capture clear images and
true representations of skin tone and colors.
• Surveillance systems and cameras must be hard-wired, wherever possible. IP
based cameras and wireless cameras are acceptable, depending on the situation.
• The use of surveillance cameras to monitor the pool area is prohibited.
• Dummy or “Fake” cameras or camera housings that give the appearance of a
camera are prohibited at all times.
• No cameras may be placed in areas where there is a reasonable expectation of
privacy.
• Appropriate signage must be installed as required by local law / ordinance.
CCTV Standard
• Digital Video Recorder (DVR) / Network Video Recorder (NVR)
- DVR storage drives must be sized and programmed to maintain at least 30-day
history of images.
- Recording rates must adhere to the following minimum frame rate:
Minimum / normal mode – 5 frames per second (FPS) .
Alarm mode – 15 FPS.
- Resolution must be 4CIF (or D1 in the Sony format) or better for each camera.
See summary table below:
specific recorded events. The DVR must be compatible for upgrading and be
expandable with off-the-shelf, third party external storage devices.
- DVRs must be connected to the Hotel’s LAN network and have it is own static IP,
gateway and subnet addresses.
- All DVRs must incorporate remote-view software with open architecture (i.e.:
non-proprietary).
- Motion detection fields to initiate recording or change recording speed must not
identify activity outside of windows or doors in close proximity.
- A keyboard to control cameras must be installed for all camera systems with
greater than 16 cameras.
• Monitors
- CCTV monitors must be configured to provide individual view and / or a matrix
view of all cameras associated with the surveillance system; the monitor
associated with the DVR should not be used for active monitoring; separate
monitors shall be provided.
- A VGA monitor shall be connected to the CCTV system.
- Monitors shall be a minimum of 15-inch wide screen and rack, wall or desk
mountable.
- Where no 24-hour on-site uniformed security services are provided and cameras
are installed beyond the lobby or employee-only areas at least one monitor shall
be installed at the front desk of a property OR web-enabled access to the DVR
from the Point-of-Sale station.
- Where uniformed security services are provided and a 24-hour Security
Command Center (SCC) has been designated, security monitors shall be located
in this office exclusively. Depending of the size of the surveillance system, it is
ideal to have a minimum of four 42 inches flat panel monitors displaying all
critical cameras and an additional two to three smaller “call up” monitor in
console to display cameras triggered as a result of an alarm condition.
- The CCTV system head end shall be kept in the security office or IT room, if
applicable and only approved personnel shall have access.
• Cabling and Power
- All wiring for new CCTV systems, IP cameras or NVR solutions must use
Category 6 (Cat 6) cabling which is 23 AWG, 4 twisted pair UTP, PCV multi-color
jacket.
- All power wiring for cameras and low voltage transformers must use plenum, 18
gauge – 2 conductor (18 AWG, 2c) non-shielded CMP rated cabling.
- All coaxial wiring for legacy analog CCTV devices must use plenum RG 6 18
GAUGE (20AWG) solid bare copper, 95% bare copper braid CLP2/CMP rated
cabling.
- Low voltage cabling may be installed in runs with other low voltage cabling,
properly routed with cable ties, and indelibly identified with proper labeling.
Conduit may be required in many locations.
- Plug-in transformers must be enclosed in a 4-screw cover box containing 120
VAC receptacles. Exposed plug-in transformers may not be used.
- A UPS device must be installed to electrically segregate the DVR from its power
source to protect against power fluctuations.
• Cameras
- Cameras must be high resolution, fixed or variable focus lens with a minimum of
f=2.8-5.8mm, f1.4 auto iris or better.
- Effective picture of 380,000 pixels, 768 (H) x 494 (V) or better
- Horizontal resolution of 500 TV Lines or better.
SECURITY SYSTEMS
• Where ACAM systems are installed, they shall be the primary means of access and
used for all entry purposes on all exterior doors, with the exception of main guest
entry doors that are staffed at all times.
• Mechanical (i.e. hard) keys to card reader controlled door shall be limited and used
for emergency purposes only.
• Where a full time security force is present, all ACAM workstations should be installed
in the Security Command Center and monitored / maintained by the Hotel Security
Department.
• Shall be supported by a minimum four (4) hour battery back up in addition to a site
emergency generator, where present.
• Shall be programmed to historically document the access activities of all cardholders
and stored for a minimum of 60 days.
• Access to all critical infrastructures on site shall be monitored and controlled access.
• An interface between the property’s on-line ACAM system and the off-line
Guestroom Keycard system shall be done, wherever possible.
ACAM Standard
• ACAM systems shall consist of the following at a minimum:
- Monitoring workstation that displays ACAM Events and ACAM Alarms in real
time.
- Video Imaging / Video Badging workstation
- Field Panels / Data Gathering Panels
- Field Devices including card readers, door contacts, motion sensors, glass break
detectors, duress alarms and related components.
- Locking Mechanisms
• Monitoring Workstation
- All card reader controlled doors shall report valid / invalid entry / exit events in
real time on the associated workstation.
- All card reader controlled doors shall report door held open / door open too long /
door forced open alarms in real time on the associated workstation.
- Alarm / Event Monitor will be integrated with the Video Badging workstation.
- Installed in the console provided in the Security Command Center.
• Field Panels
- Shall communicate either via TCP / IP over a dedicated LAN or the guest
network LAN, separate from the Hotel LAN network.
- Shall provide alarm input / output control, multiple card reader interface
configurations and local battery backup, and alarm as appropriate.
- Include tamper alarms that report to the ACAM workstation.
- Shall be mounted in lockable and secure locations on site (typically an IT / MDF
closet).
• Card Readers
- All card readers should utilize RFID proximity technology with a read range of at
least 5 cm or greater.
- Card readers deployed at the Hotel may vary by property but may include:
Wall mounted card readers
Mullion mounted card readers
Long range card readers
- Card readers and associated door access devices shall be installed on the lock
side of the door (or the hinged side of the active double door) at approximately
1000 mm above the floor.
SECURITY SYSTEMS
- All card reader controlled doors, equipped with a mechanical locking system shall
include a request-to-exit (REX) device in the form of a PIR motion sensor.
Note that two-way card readers or push-button REX devices are prohibited,
unless in extreme cases and approved by T.S.
- REX devices shall be programmed only to shunt the door contact / alarm and not
“unlock” the door. The device shall identify valid egress of personnel who are
between 1000 mm to 2000 mm away from the door.
- REX devices shall be installed at the center of the doorframe wherever possible
and not blocked by emergency exit signs.
- All card reader doors should have alarm contacts that are flush mounted,
wherever possible (surface mounted if necessary on the protected side of the
door).
- One door into every space secured by the ACAM system shall have a
mechanical key override capability.
• Locking Devices
- All card reader controlled doors shall be locked using:
Electro-mechanical locks wherever possible.
Electric lock strikes may be used as needed but shall include latch-guards.
Where electric lock strikes are used, Classroom-style Locksets will be used.
- Magnetic locks will be avoided wherever possible. Where magnetic locks are
used, the REX PIR Motion Sensor will also be programmed to temporarily
disengage power to the magnetic lock.
In addition to the REX PIR, a manual push-button REX mounted on the
secure side of the door will also be provided that is connected directly to the
power supply of the magnetic lock.
Magnetic locks used to secure doors in critical locations should also have a
keyed bypass lock installed on the unsecured side of the door, keyed to a
restricted mechanical keyway that is also connected to the power supply of
the magnetic lock to be used for emergency purposes only.
- Door hardware and related devices are to be powered by a power supply
different than the field panel.
- All electro-mechanical and electrified strikes shall be set to “fail-safe” or unlock
upon the loss of power.
- All electric locks for occupied areas in the “path of exit” shall be interfaced with
the Hotel’s fire alarm system, in accordance with NFPA or prevailing fire code.
• Stairwell Doors
- For stairwell doors that will be monitored and prohibit reentry to a floor, an
electrified lock set similar to the Hi Tower Locks shall be used in all cases.
- In order to allow re-entry during emergency passage, locksets shall be installed
on stairwell doors.
• Cabling
- Low voltage cabling may be installed in runs with other low voltage cabling,
properly routed with cable ties, and indelibly identified with proper labeling.
Conduit may be required in many facilities but shall conform to prevailing
electrical codes in all cases.
- All power wiring between panels and door locks shall use plenum, 18 gauge – 2
conductor (18 AWG, 2c) non-shielded, CMP rated cabling.
- All wiring between panels for data communications shall use plenum, 18 gauge –
4 conductor (18AWG, 4c) overall shielded, CMP rated cabling.
- All wiring between panels and alarm / signaling devices should use plenum, 20
gauges – 4 conductors (20AWG, 4c) overall shielded, CMP rated cabling.
SECURITY SYSTEMS
- All wiring between panels and card readers shall use plenum, 20 gauge – 6
conductor (20 AWG, 6c) overall stranded CMP rated cabling.
• Access Credentials
- An access credential is required for every hotel employee.
- Due to the nature of their jobs and the distribution of employee name tags as part
of a uniform, the access credential may come in multiple forms:
Imageable Proximity Access Card.
Proximity Transponder Tag.
Proximity Key Fob.
Long Range Proximity Tag (for vehicles).
- A minimum of 500 access credentials is required upon the commissioning of the
system.
- A picture of all hotel workers permanently assigned to the hotel shall be taken
and maintained on the access control system.
ACAM Systems for properties located in an Elevated Security Environment
• Controlled access shall be provided into:
- All vehicle entrance / exits barriers
- All rooms containing critical infrastructure including Power, AHU,
Telecommunications and Water.
- Primary IT Room.
- Cashier’s Office.
- Human Resources.
- Security Office.
- Employee Entrance.
- Management offices.
- Service Elevators.
- Baggage / Luggage Storage Room.
- Limited Use / Restricted Areas.
• Remote Monitoring from the Security Control Room shall be provided at:
- All card reader controlled doors.
- All stairwell access doors.
- All exterior access points including pedestrian doors, overhead doors, roof
hatches or similar.
- All Point-of-Sale (POS) locations in the form of Duress Alarms.
st
- Exterior 1 ground floor windows in the form of Glassbreak detectors.
- Field panels in the form of tamper alarms.
• The applicable security integrator must provide an IDS that is complete and fully
functional with all components, accessories and training as depicted on contract
drawings.
• The purpose of the IDS is to:
- Provide a mechanism for hotel personnel to remotely and electronically monitor
perimeter access points and activity through a keypad installed near the front
desk.
- Provide the ability for hotel personnel to summon emergency assistance via
duress alarms monitored by a UL listed Central Station.
- Provide a mechanism to have a historical record of activity at the hotel.
• Programming of device names, door set ups, alarm zones and response must be
coordinated either through the local Security Director, General Manager or T.S.
• Where appropriate, such as in the pool area, the intrusion detection can be used for
detecting access outside of normal operating hours.
• Intrusion detection sensors must trigger a local and centralized alarm that goes to
both a keypad installed in close proximity to the Front Desk as well as the UL Listed
Central Station.
• IDS systems and applicable Central Stations must be able to provide reports of all
alarm activity at the Hotel.
• All equipment must have power and/or signal cables shielded in vandal and
corrosion resistant conduit. Alternatively, alarm system signals may be transmitted
by encrypted wireless operation. Alarm systems must be able to function during
power loss.
• Infrared/radio/microwave beams must provide full coverage at pre-determined
heights and sensitivities for all designated areas and must be interfaced to all alarm
systems. They must provide both passive and active detection modes and must be
fully digital, providing addressable locations and self-diagnostic operations.
IDS Standard
• IDS will be comprised of the following equipment, at a minimum:
- Control Panel
- Wireless / Wired Receiver
- Keypad
- Door Position Switch (DPS) on all perimeter access points
- One (1) DPS on the cashier’s safe / drop safe, where present.
- Wired Duress Alarm at all POS stations at the guest check-in counter.
- Wired Duress Alarm in Cashier’s Office, where present.
- Wired Duress Alarm in Safe Deposit Box (SDB) room where present.
- One (1) wireless Duress Alarm.
- Cellular back-up unit
• Installation
- Where possible, field panels connected to IDS must be located in a secured,
limited access room (MDF / IDF rooms as example) and installed on wall board.
- Installation of IDS field panels should be on a 1200mm x 2400mm to 12mm to 19
mm fire rated plywood backboard.
• Cabling and Power
- Power is required and power supplies should be installed per local code. All
wiring between panels for data communications must use plenum, 18 gauge – 4
conductor (18 AWG, 4c) overall shielded (OAS), CMP rated cabling.
SECURITY SYSTEMS
- All wiring between panels and alarm / signaling devices must use plenum, 20
gauges – 4 conductor (20AWG, 4c) overall shielded (OAS), CMP rated cabling.
- IDS panels must be equipped with tamper switch contacts.
- IDS systems and associated panels must be supported by battery back-up with a
minimum of four (4) hour support capacity. Where available, the IDS should also
be connected to the site’s UPS system and emergency generator.
- A dedicated telephone line must be provided for the security alarm panel to
transmit alarm signals. No other devices may be connected that line.
- The wiring connecting the wireless back-up panel and the alarm panel must be
placed in conduit.
- The antenna cabling for the wireless back-up must be installed in 20mm conduit
extending above the ceiling or to a minimum height of 3 meters above the floor.
• Device Mounting
- IDS system must monitor every perimeter access point to the site.
- Contact points must be mounted in the top edge of a door, 50 mm from the strike
side of the door. The contacts must be recessed unless the door frames are
filled.
- If the door frames are filled, a surface mounted door position switch (DPS) may
be used. The DPS may be mounted on the door frame and the magnet on the
top edge of the door at the same location.
- Duress (panic) alarms must be provided in at least two locations at the front
guest check-in desk. Devices should be mounted underneath the POS stations
in a discreet location. Similarly, duress alarms are required at the
Regency/Grand Club reception desks, as well.
- One additional wireless Duress Alarm should be provided for staff use.
For Properties located in an Elevated Security Environment
• One or more of the following additional devices may be installed in locations
determined to be at increased risk:
- Glass break detectors
Installed on ground accessible windows in areas of the hotel not commonly
used during off-hours.
Location shall be on the ceiling grid within 1500 mm of the glass, covering a
maximum of 400 mm on either side of the detector.
Must be dual technology and be capable of identifying both audio (decibel
level) and shock sensing technology.
- Motion Sensors
Dual Technology (microwave / passive infrared).
Installed at a height of 2700 mm above the floor or within 300 mm of the
ceiling.
Duress Alarms
Duress Alarm Requirements
• There are two types of duress alarms that may be installed on a property; a security
duress alarm and a medical alert alarm. While the two may be similar in operability
and the technology used, they differ as to the circumstances surrounding their use
and the response they may generate.
• Security Duress (panic) Alarms are required for the following areas:
- Cashier’s room.
SECURITY SYSTEMS
- Front desk stations and Regency/Grand Club reception (one per station).
- Safety Deposit Box (SDB) Room.
- Point-of-Sale Stations where large cash transactions are anticipated.
- VIP / Presidential Suites (in applicable areas).
- Human Resources.
Duress Alarm Standard
• All Duress (panic) Alarms must be routed to annunciate in either the Security
Command Center or at an external monitoring service. Duress alarms cannot go
directly to the police.
• Monitoring of Duress (panic) Alarms must be located at the Security Command
Center (where available) and duplicate/remote panels. These alarms must be
constructed so that if there is no proprietary response within 1 minute it rolls directly
to a contracted, external, monitoring service.
• Duress (panic) alarms shall not produce an audible alarm at the point of initiation.
• Duress (panic) alarms must be operable by quiet foot or touch switch.
• All equipment must have power and/or signal cables shielded in vandal and
corrosion resistant conduit. Alternatively, signals may be transmitted by encrypted
wireless operation.
instances, the SCC shall be self-contained and adjacent to the employee entrance
wherever possible.
• Physical Requirements
- Ideally, the SCC should be split into three distinct areas for large properties (and
scaled back as need for smaller properties); an area dedicated for administrative
duties, equipment or technical room and an area dedicated to surveillance,
security dispatching and building alarm monitoring.
- A private Security Director’s office shall be planned within the hotel, which ideally
should be located in the same area as other executive offices, but may be
located in close proximity to the primary security office as necessary.
- Installation of all equipment must be ergonomically correct for monitoring function
and the room must meet OSHA or similar health and work environment
standards. This includes having adequate ventilation and heating for the
occupants as well as the equipment.
- The space must be appropriate to the size and amount of equipment and staff,
with expansion room available for future needs.
- All security systems must utilize modular components and dual redundancy
where possible to allow for hot swapping of any component while maintaining full
system integrity. Adequate backup must be in place to enable operations to
continue when primary system is repaired or down.
• Technical Requirements
- All security systems must be fully addressable and controllable from the main
security center and all duplicate/remote panel locations.
- All security systems must be provided with encrypted password and individual
pin number allocations allowing programmable and selectable levels of user
access.
- The SCC must be surge protected, be on an UPS system, and have backup
generator power.
- All security systems must be modular in design for future expansion. They must
be built with proactive planning for better, future technology as much as possible.
- All equipment must have power and/or signal cables shielded in vandal and
corrosion resistant conduit. Alternatively, signals may be transmitted by
encrypted wireless operation.
- Duplicate, remote security panels (preferably PC-based) and operations must be
made available at the Hotel Communication Center and/or as designated by
T.S.
- The Security Consultant must coordinate with the architect and MEP consultant
to ensure that space planning and MEP connections are available to allow the
suitable location and operation of electrically-powered security equipment.
Designation of power requirements must be included, as well as outlets to be
dedicated to security systems. Those systems to be supported by emergency
power must be specified and must include all emergency lighting. Systems must
be protected from electro magnetic interference and should be away from power
distribution equipment.
- All systems associated with telephone and computer equipment, including such
things as security panels, elevators, fire alarms and emergency evacuation must
be coordinated by the responsible consultant for interfacing and integration of
these systems into a cohesive solution.
SECURITY SYSTEMS
Metal Detectors
Metal Detector Requirements
• Where needed, both walk-through and hand-held metal detection systems must be
used.
• Where required, a custom unit that would be designed without an overhead bridge is
acceptable. This design would only be required for the main guest entrances.
• For other Front-of-House access points, elliptic style walk-through metal detectors
should be used whenever possible.
Metal Detector Standard
• Walk-through Metal Detectors:
- The unit must:
Detect both ferrous and non-ferrous metallic objects.
Provide for multi-zone detection.
Visibly indicate the general location of a detected object.
Be able to detect all concealed metal weapons with sufficient standard
programs and adjustable sensitivity levels.
Be capable of bi-directional screening.
Produce both audible and visual annunciation upon target detection. Audible
annunciation must be both volume level and tone programmable.
Provide continuous detection maintaining a through put rate of not fewer than
fifty detections per minute.
Have an interior opening of 700 mm or greater.
- The functionality of the walk-through metal detector must not be impacted when
applied to multi-unit installations.
- The unit’s controls shall be contained in a touch pad panel with LCD or LED
display screens for system status information. This panel, along with all wiring,
connections and electronics should be integrated into a single overhead
compartment.
- The system shall be designed with programming to eliminate the detection
signals from two or more targets from canceling each other.
- The system shall be self-diagnostics, always maintaining system readiness and
annunciating any problems by way of the display panel.
- The unit shall have self-charging batteries for maintaining system operation of no
less than forty-five minutes during extended power interruptions.
- The unit is to be constructed of a scratch and mar resistant material with resilient
end caps. The control panel and cross member shall be constructed of
aluminum or stainless steel.
- Electrical power for the unit shall be fully automatic with a breaker and meet UL
code.
- The unit shall posses a magnetic field strength that will not affect magnetic
recording media including magnetic tapes, diskettes and cards.
SECURITY SYSTEMS
- The unit must have been tested in accordance to and meet or exceed the
requirements of:
The Institute of Electrical and Electronic Engineers: Standards for Safety
Levels with Respect to Human Exposure to Radio Frequency
Electromagnetic Fields”.
OSHA: Radiation Protection Guide, CFR 1910.97 section (2) I.
National Institute of Law Enforcement and Criminal Justice: Standards for
Walk-Through Metal Detectors for Use in Weapons Detection, NILECJ-STD-
0601.00 section 4.11.
U.S. Federal Aviation Administration airport application specifications of the
Undetectable Firearm Act of 1991.
X-Ray Machines
To search bags and large luggage at hotel properties in a non-intrusive manner, X-ray
machines may be deployed. Software provides the ability for the machine and its
operator to differentiate inorganic substances from organic substances. County/State
regulations govern their use and safe application.
SECURITY SYSTEMS
• Must have an X-ray sensor of 1152 photo diodes in an “L” shaped array which
provides the ability to penetrate 25 mm of steel and display a .38 caliber 50mm
barreled pistol through that minimum.
• X-Ray equipment designed to check guest luggage must have a tunnel opening of
635mm wide by 430mm high or greater.
• For machines anticipated to be placed in Front-of-House (FOH) areas, x-ray
equipment should be “bottom up” shooters, meaning that the conveyor belt is above
the x-ray providing a better image.
• Must have a conveyor speed of not less than 12 meters per minute.
• Must be able to hold a parcel 10 kg or greater.
• Must have a video display that includes 17” color high-resolution flicker free
monitors.
• Must have a lockable Keyboard to prevent unauthorized use.
Hotels located in an Elevated Security Environment
• Provide x-ray machines that accommodate the screening of both guest baggage as
well as parcel size deliveries to the hotel, employees and bulk goods arriving at the
hotel via the loading dock.
- Individual sound level adjustment for each substation and master station shall be
achieved by programming the appropriate subscriber board in the exchange.
- Master to master communication including all masters simultaneously designated
as “all call” or “conference call” features.
- Queuing of incoming calls at the master stations.
- The capability of programming each substation call button to call one or multiple
master stations. All substation call buttons shall activate an audible and visual
signal (LCD display) at the master station.
- An RS-232 / 422 interface with the SMS and CCTV Systems as required.
- Manual and automatic transfer of control of certain substations between master
stations.
• Substations shall consist of a tamper resistant call button and speaker mounted on a
finished flush mount wall / junction box mounting plate.
• Emergency call / assistance stations shall incorporate an exterior intercom
substation and lights in a vandal resistant housing with a constant blue station light
for location identification illuminated at all times.
Portable radios equipment shall be provided for the exclusive communications use of the
staff. Due to various geographic conditions of the worldwide property sites, different
models of equipment may be used to accommodate the various frequencies in the
specific areas. The exact equipment model, frequency requirements and power
requirements to best meet requirements for each project site shall be considered.
Portable Radio System Requirements
• Must be the latest model with features available from the manufacturer at time of
substantial completion of the project.
• Quantity of hand held portable radio shall be determined by T.S., with belt clips,
leather holders, chargers and related accessories.
• Alternate, equivalent products may be used subject to approval by T.S.
• Regulations and Standards: System components, part and installation are to comply
with the corresponding recommendations of the Electronic Industries Association
(EIA), and the International Electro-technical Commission (IEC).
Portable System Standard
• Shall be hand held two way mobile radios either very high frequency (VHF) with 5
watts power output or ultra high frequency (UHF) with a 4 watts power output. The
radios shall be minimum ten channel types and channels shall be dedicated to
departments as approved by T.S.
• Shall be equivalent to Motorola model No. HT1250-LS+ or better, with following
features:
- 16 channel capacity.
- 12.5/25 KHz switchable channel spacing.
- NiMH rechargeable batteries to provide up to 8 hours of operating time.
- Battery gauge.
- Emergency button.
- Switchable power levels.
SECURITY SYSTEMS
Acoustical Consultant
In order to achieve the required minimum acoustical performance, it is recommended
that a fully qualified and experienced Acoustical Consultant is engaged to provide the
following services throughout all project phases.
General
- Familiarization with T.S. acoustical performance requirements.
- Coordination with all Design Consultants.
- Review of all construction material and system bids.
- Review of all related shop drawings and material cut sheets.
- Attendance as required at coordination meetings.
157
MEP Noise & Vibration Control
Analyze MEP systems design including, components' location and distribution network,
and provide recommendations and specifications to ensure compliance with the required
minimum acoustical performance.
158
Introduction
All lock systems and hardware must be manufactured and installed to meet prevailing
codes and requirements issued by authorities having jurisdiction over the hotel or project
and to be minimally in accordance with the following specifications.
All lock systems must be based on Great Grand Master Keying (GGMK). As built lock
schedules for all areas and comprehensive system manuals must be provided.
An electronic lock system, consisting of battery powered door terminals or low voltage
wall terminals controlling electronic access control devices, is minimally required for all
guestrooms, suites and specific public areas. Back of house areas may utilize an
electronic or mechanical lock system, depending on specific room requirements.
All lock systems must be operated during the construction period with a temporary key
system. This temporary key system will be replaced at the time of area by area handover
in accordance with the following procedures:
- Each individual hotel and all nominated users must be password and PIN
identified by recorded correspondence between original manufacturer and the
hotel operator. Handover of programming authority and training must be
documented and signed by manufacturer's personnel and designated hotel
operator. This requirement cannot be delegated to an agent or contractor.
- Entire system and all components must be shipped in the original manufacturer's
sealed carton/package.
- All electronic card encoders and service devices must be provided with project
specific PIN. In order to activate the changeover from temporary construction
system an agreed sequence of recorded activities must be followed at the time of
hand-over to the hotel operation.
- The system must have the capacity to operate concurrent phases, which are
operating under full hotel operation as well as construction operation.
- All mechanical master keys, either pre-cut or blank, must be shipped with
recording of dispatch and receipt in the original manufacturers sealed
carton/package directly to the pre- determined and authorized hotel personnel.
This requirement cannot be delegated to an agent or contractor.
159
- Joint authentication of password and PIN identity from hotel and original
manufacturer must be recorded and signed by manufacturer and authorized hotel
personnel prior to the provision of any service codes, security codes and spare
parts. This requirement cannot be delegated to an agent or contractor.
Main Components
The main components of the system must include:
Transponder Card
- Contact less RFID transponder card.
- Complies to ISO 7810 for transponder technology.
- Contains secure manufacturer's unique code in secure, read only memory.
- Encoded information must be limited to: room number, check in- check out date
and time duration, reference number, i.e. key generation number/folio
identification. Under no circumstances should personal information such as
guest's name and or credit card information is placed on the card.
- Writeable, re-codable memory.
- Compatibility with COM multi-application requirements.
Smart Card
- Upgradeable contact chip or transponder chip.
- Complies to ISO 7816-1 or current ISO equivalent.
- Contains secure manufacturer's unique code in secure, read only memory.
- Encoded information must be limited to: Room Number, Check in- Check out
date and time duration, reference number, i.e. key generation number/folio
identification. Under no circumstances should personal information such as
guest's name and or credit card information be placed on the card.
- Writeable, re-codable memory.
- Compatibility with COM multi-application requirements.
160
Key Issuing Computer and Encoder
- PIN security protected for each individual user and selected security levels.
- Audit trail of date, time and log-in ID of issuer for creation of each guest and staff
key.
- Mains powered and/or battery power for mobile units.
- Direct interface with property management and point of sale systems via RS 232
or TCIP.
- Minimum programmable 16 coded log-in users for front desk units and mobile
units.
- Manual key encoding override in event of property management system failure.
- Built in reader, as applicable, for either smart or transponder card.
- Adaptable to any language.
161
- Removable cylinder with recodeable three level hierarchy facilities using
sequential master key.
- Lock set must be minimally equipped with lever or knob on corridor side and
code compliant lever on room side.
- Lock set must have the following minimum functions: anti-friction latch bolt, anti-
thrust device and automatic dead bolt.
- Anti-friction latch bolt and anti-thrust device must have a minimum throw of 16
mm and be extended when door is open and when closed and aligned correctly
with strike plate.
- Automatic deadbolt must have a minimum throw of 20 mm for DIN Euroset
standard, or 25 mm for optional ANSI standard, and is thrown when the door is
closed properly and the latch and anti-thrust device are aligned with strike plate.
- Outside lever or knob retracts latch bolt and deadbolt only when an authorized
key card is used. Programmable timing feature to ensure only a single opening is
allowed by each authorized card reading.
- Inside lever is equipped with a panic device and will always retract latch bolt and
deadbolt when used.
- Tactile or audible feedback to confirm the automatic dead lock function is
activated by a thumb turn device located on the room side.
- Confirmation of automatic dead lock indication is given on the interior of the room
by either a mechanical indicator or by a LED, which is permanently lit.
- When automatic dead lock confirmation is activated, an incorrect or service key
card will illuminate exterior colored LED indications indicating that the key was
read but access is denied due to confirmed dead lock activation. The guest
should not be disturbed by this event.
- Confirmed dead lock function can be overridden by authorized or emergency key
card or by mechanical key.
- Finish as specified by Interior Designer or Architect to match all other hardware
on same door.
- Weather proof to a minimum IP rating of 31 for outdoor and damp areas.
- Remotely mounted card reader unit with on- and off-line connectivity.
- Programmable access delay.
Portable Interrogator
- Individually PIN or system key protected and requires additional PIN or system
staff key authorization for service or emergency openings.
- Able to update lock codes and timetable.
162
- Able to download audit trails of 500 preceding openings.
- Checks technical function of locks.
- Allows uninterrupted front desk operation at any time.
- Memory storage compatible with total quantity of lock sets installed.
- Portable interrogator use at lock to be part of audit trail.
163
Out of System Lock Unique and non-replicated mortise lockset.
Double Cylinder Deadbolt Deadbolt thrown or retracted by key from either side by key.
The lock set types should comply with the hardware groups.
Spare Lock Sets
In addition to the installed quantities, the following must minimally be provided as
164
emergency replacements:
Electronic Guestroom Door Lock Minimum 5 or 2 per 100 locks installed.
Padlock Minimum 3.
Keying Concepts
All mechanical keys provided for mechanical systems and as emergency keys for
electronic systems must have a numeric code engraved that cross-references with a
printed door and lock set schedule.
Electronic Lock System
Electronic lock systems for guestrooms should be independently programmed from
those provided for back of house and public areas. The master key levels must be in
accordance with:
Guestrooms
Electronic Key Levels Mechanical Key Levels
Emergency Master Key Emergency Master Key
Floor Master Key
Section Master Key
Guestroom Key
165
Mechanical Lock System
The master key levels of the mechanical lock system must be in accordance with:
Great Grand Master Key Operates all BOH and Public Area locks including the
mechanical override for electronic BOH/Public area doors.
Grand Master Key Operates all locks of one group as designated.
Master Key Operates all locks of one sub-group as designated.
Key alike Operated the locks of associated doors.
Key to differ Operates the lock of one single door.
Out of System Key Operates the lock of one single door. Not controlled by
Master Key System.
Budget Key Operates all budget locks throughout the property. Not
controlled by Master Key System.
Grand Master Key groups allow access into and through the following areas:
All
-
Housekeeping areas.
-
Laundry and valet areas.
GMK Housekeeping -
Employee facilities.
-
Administration offices.
-
Public Areas excluding F&B outlets.
-
Banqueting facilities excluding kitchens and pantries.
GMK Banqueting All banqueting facilities excluding kitchens.
GMK Fitness All recreational facilities.
All
GMK F&B - F&B outlets, Kitchens, Pantries and F&B store rooms.
- F&B offices.
All
- Engineering areas.
GMK Engineering
- Plant rooms.
- Other areas in which an Engineering plant room, facility
or service shaft is located.
All
GMK Administration - Administration facilities.
- Administration store rooms.
The office of the General Manager, Controller, Cashier, and other offices as may be
determined by T.S. Project Manager, will be operated with out of system keys and are
not included in the above schedule.
166
Quantity of Keys
• Chip card 120 cards per installed lock
• Emergency Master Key guestrooms 5
• Great Grand Master Key 3
• Grand Master Key 3 per group
• Master Key 5 per sub-group
• Key alike 3 per cylinder group
• Key to differ 3 per cylinder
• Out of System Key 3 per cylinder
• Budget Key 5% of installed locks
Spare Cylinders
• Grand Master group 3 per group
• Master group 5 per group
Base metal should be bronze or stainless steel with finishes to be as specified by Interior
Designer or Architect to match all other hardware on same door.
Hinge specification and quantities shall be dependant on door panel dimensions, weight,
function and usage.
167
Dimensions should minimally comply with:
• door weight up to 45 kg 125 mm x 115 mm x 4 mm
• door weight up to 60 kg 125 mm x 115 mm x 5 mm
• door weight up to 100 kg 150 mm x 150 mm x 6 mm
Types should comply with hardware groups.
Pivots
All pivots will be of architectural grade, ball bearing or anti-friction type and comply with
prevailing ANSI or EN standards.
Base metal shall be of bronze or stainless steel with finish to be specified by Interior
Designer or Architect and to match all other hardware on same door.
Door closer specifications may also be dictated by life safety (fire/smoke) authority
codes and requirements. All doors that perform life safety (fire/smoke) functions should
where permissible be minimally equipped with electromagnetic or solenoid hydraulic
hold open devices interfaced and controlled by central or localized dual-ionization and
optical detection devices.
Doorways that provide access routes for disabled persons should comply with prevailing
codes and requirements or minimally allow unrestricted and unaided access and egress
by motorized assistance.
168
Recessed Floor Mounted Closer
- Closer shall have adjustable power, adjustable closing speed, proportional back
check, leveling device and centering adjustment.
- As above: with 'hold open' function.
Closing Selectors
- Where required to ensure correct closing sequence. Specification and finish by
Architect or Interior Designer to match all other hardware on same door.
Door Limiter/Restrainer
- Where required to set a maximum door opening. Specification and finish by
Architect or Interior Designer to match all other hardware on same door.
- As above: with ‘hold open’ function.
Door panel must be equipped with one flush pull on each side and one edge pull.
Finishing shall be specified by Architect or Interior Designer.
169
Push, Kick & Armor Plates
Push, kick and armor plates are to be of stainless steel or acrylic/vinyl sheet with finish
as specified by Interior Designer or Architect and to match hardware on same door.
Push plates are mounted at mid level of door panels as noted in hardware groups.
Minimum height of plate must be 300 mm and extend across the full width of the panel
with the exception of finger plates, which are 300 mm x 100 mm and mounted at the
leading edge of the door panel.
Kick plates are mounted at bottom of door panels as noted in hardware groups.
Minimum height of plate must be 450 mm and extend across the full width of panel.
Armor plates are mounted at bottom of door panels as noted in hardware groups.
Minimum height of plate must be 900 mm and extend across the full width of panel.
All plates must be fixed by a non-visible method. Exposed screws or fixings are not
permitted.
Panic Exit Devices, Fire Exiting Routes, Staircases and Exterior Exiting
Doors
All doors within fire exiting routes leading to external areas are to be minimally equipped
with panic exit devices. Such devices should be of a mechanical nature and react
positively to minimal pressure on a horizontal touch bar or cross bar. Alternatively all
doors within fire exiting routes leading to external area may be equipped with electronic
locking devices, which must release the door lock when signaled from the fire detection
and alarm system or whenever the control power source is inoperative. Such doors must
be equipped with levers, which can be operated with minimal pressure and without
rotation of the user’s wrist.
All doors leading to external areas must also be equipped with an independent
centralized alarm system and activates recording of the related CCTV camera in the
event of the door being opened.
Revolving Doors
Revolving doors shall minimally be of a single modular prefabrication consisting of
curved side walls, ceiling, and canopy, access hatch, ceiling lights, door wings, locks,
glass, motor drive system, emergency collapsing mechanism and safety system as
required for installation.
Doors shall be of three or four wing configuration with removable weather-stripping on all
sides. Locks shall be surface-mounted deadbolt locks with removable keyed cylinders
that lock into the ceiling or floor on two interior door wings.
170
Finishing shall be specified by Architect or Interior Designer.
171
Accessories
Night Latch
Two piece case hardened steel or stainless steel construction. Anchor plate with
receptacle for chain length affixed to doorframe. Sliding gate for chain cam affixed to
door panel. Finish matching all other hardware on same door.
Alternative, two piece looped hasp and staple. Loop/Hasp to be fully covered with
leather or rubberized material and hinged on anchor plate mounted on door frame.
Staple is mounted on door panel. Finish matching all other hardware on same door.
Night Latch style selected must be mounted in a conspicuous location to allow ready
identification and must present a simple and prompt release mechanism
Door Viewer
Solid brass or stainless steel, minimum 190 degree angle of view. Non-reversible optics
and shaft with interior side rotating privacy flap. Sized to suit door thickness, finish to
match all other hardware on door.
Acoustic Seals
Door frame style: integrated rubberized or neoprene silencer strips embedded within
frame edges, colored to match doorframe or as specified by Architect or Interior
Designer.
Door panel style: integrated within lower edge of door panel and activated by mechanical
plunger striking plate on door frame causing a rubberized or fibrous seal to drop down
and form acoustic seal at floor level.
Door Chime
Electrically powered push button integrated with “Do not disturb” indicator circuitry. Two
tone chime audible throughout guestroom.
Door Stop
Wall or floor mounted stops to be matched by Architect or Interior Designer with wall or
floor material and other hardware on door. Stops to be made from non-marking, non-
corrosive material with counter-sunk anchors.
Robe/Coat Hook
Wall or door mounted hooks to be specified by Interior Designer or Architect to match all
other hardware on same door.
172
Hardware Groups
The following groups give the minimum requirements for sample door types.
Guestroom WC Door
3 - Hinges
1 - Door frame acoustic seal
1 - Privacy lock
1 - Stop
173
Guestroom Connecting Door
Paired door panels in shared frame:
6 - 180º opening hinges at each door panel
2 - Door frame acoustic seals
2 - Door panel acoustic seals
2 - Connecting door locks
2 – Single cylinder deadbolt (key or turn on room side, blank plate inside)
1 - Floor stop for each panel located at the connecting wall
Guest Lifts
Public area electronic locks to call and use lift with guestroom key card, location to be
specified.
All other hardware will be specified by Lift Company.
174
Public Area Toilet Stall
3 - Hinges, self closing
1 - WC cubicle lock
1 - Wall stop
1 - Coat hook
175
Maid's Pantry-Service Core-Mini Bar Store
3 - Hinges
1 - Door frame acoustic seal
1 - Door panel acoustic seal
1 - Overhead concealed in door or frame closer with hold open function on public area
side or
1 - Overhead exposed surface closer with hold open function on BOH side
1 - Push, kick or armor plates mounted on each BOH panel and face
1 – Guestroom Electronic lock
Storerooms
3 - Hinges
1 - Storeroom lock set
2 - Armor plates
1 -Stop
1- Overhead exposed surface closer with hold open function
Entry to Office
Security offices require metal panel door & frame.
3 - Hinges
1 - Door frame acoustic seal
1 - Classroom lock
1 - Stop
176
Employee Entrance and Locker Rooms
3 - Hinges
1 - BOH electronic lock
1 - Overhead exposed surface closer
1 - Stop
MEP Shafts
3 x 180º hinges
1 x Single cylinder deadbolt
177
Introduction
T.S. recommends that the supply and installation of all building systems, components
and materials is carried out only by parties having a minimum of 5 (five) years
documented experience in the manufacturing or installation of work similar to that
required.
All materials, components and installations must comply with current OHSA, ISO and
HACCP requirements.
Floor Finishes
Sealed, Oil/Acid/Alkali Resistant Concrete
- Either pigmented or non-pigmented water based non-volatile organic compound
acrylic penetrating sealer selected to suit project requirements. Slip resistance
minimally 0.7 ASTM (wet) – EN R9.
178
Hot Welded Sheet Vinyl & Profiles
- High color stable flexible glass fiber backed chemical resistant vinyl with blended
additives including, ± bacteriostat, aluminum oxide, quartz and silicon carbide. Sheet
lengths are to be suitably adhered to substrate with vinyl heat welding threads and
sealing compounds to be utilized at joints and penetrations. Provide matched coves,
cappings and finishing strips. Slip resistance minimally 0.6 ASTM (wet) – EN R8.
Slip resistance rating should be applied to both wet & dry conditions.
Vinyl Tiles
- Flexible chemical resistant vinyl composition floor tiles with high color stability. Slip
resistance minimally 0.7 ASTM (wet) – EN R9. Slip resistance rating should be
applied to both wet & dry conditions. Can Linoleum be added as a materiel for BOH
floor in corridors, storerooms, etc?
Carpeting/Carpet Tiles
- Carpet dimensions 3600-4000 mm width, installed wall to wall.
- Tile dimensions 300-500 mm², installed wall to wall.
- Fiber 100% woven polypropylene or 100% spun nylon, pigmented yarns.
- Flammability minimally DIN 102 B1 or BS 476 level 7.
- Stitch rate minimally 41.4/10 cm, achieving density 130,000/m².
179
- Pile height 7 mm, cut or loop pile.
- Backings: Carpet; jute/polypropylene. Tiles; latex rubber.
- Static discharge – exceeding EN1815.
- Install carpet tiles with double glue down method over synthetic fibre 600g/m², 6 mm
thickness carpet pad.
Non-Combustible Finish
- In accordance with prevailing local codes.
Wall Finishes
Sealed, Oil/Acid/Alkali Resistant Concrete
- Either pigmented or non-pigmented water based or VOC compliant compound acrylic
penetrating sealer selected to suit project requirements. Alternatively a two part
epoxy resin water based coating. Either coating utilized shall provide water, anti-
fungal and micro organism resistance.
Corner Guards
- AISI grade 302 or 304 stock stainless steel.
- Minimum gauge 3 mm/SWG 11.
- Mounting height from finished floor level/radius cove top edge through to minimally
1800 mm AFFL.
- Width minimally 150 mm each side of corner centerline.
- Fixing with countersunk stainless steel screws or anchor bolts flush with walls.
180
Trolley Guard Rails
- AISI grade 302 or 304 stock stainless steel, minimum gauge 3 mm/SWG 11.
- Fiberglass trolley guard rails may be considered.
- Mounting height centerline at 1100 mm AFFL.
- Height minimally 300 mm.
- Mounted on finished wall.
- Guard rails to wrap corners, finishing details as required.
- Fixing on continuously running box extrusion with countersunk steel screws or
anchor bolts.
181
- Coordinate face finishes with T.S. Back of House Color Schedule for the specific
project, with consideration for finish material, color, acoustic properties, glazing, etc.
- Computer, Telephone, MATV Equipment Room panels must minimally comply with:
- Thermal 1.08 w/m² K U rating.
- Non-shedding pure PVC finish.
– Double glazed glass modules, 4 mm glass hermetic/vacuum sealed.
– Silicone seals at panels and door frames.
- Coordinate panel heights 1050-2400 mm with T.S. Back of House Color
Schedule for the specific project.
- All panels to accommodate internal cable ways for power, voice and data.
- All panels capable of supporting 250 kg/linear meter
- Assembled panel system to minimally achieve:
– STC rating ± 44 ASTM (in accordance with ASTM testing and methodology)
– NRC rating 0.70 ± .10 ASTM (in accordance with ASTM testing and
methodology)
- Individual panels to minimally achieve:
– NRC rating 0.70 ± .10 ASTM (in accordance with ASTM testing and
methodology)
- All panel components must be free from CFC materials, low toxicity formaldehyde
MDF and VOC compliant.
- All glazing elements must utilize tempered or safety laminated glass.
Wallcovering
- Calandered, mildew resistant vinyl fused directly to backing medium.
- Total weight minimally 440 g/m².
- Coating weight minimally 235 g/m².
182
- Minimum breaking strength: 225 x 245N. ASTM (in accordance with ASTM testing
and methodology).
- Minimum tear strength: 111 x 111N. ASTM (in accordance with ASTM testing and
methodology).
- Minimum adhesion coating to backing: 53N/100 mm ASTM (in accordance with
ASTM testing and methodology).
- Minimum abrasion resistance: 500+ double reverse rubs.
- Minimum fire hazard classification: Class A ASTM (in accordance with ASTM testing
and methodology).
- All wall covering must contain bactericides and mildew inhibitors.
Alternatively:
- Woven glass textile wall covering suitable for on-site paint coating.
- Inert natural materials inherently resistive to bacteria and mildew growth.
- Minimum warp tensile strength 1800 KpA.
- Minimum weft tensile strength 1500 KpA.
- Maximum permeability 62 perm 3360 ng/PA.S/m².
- Inherently fire resistant.
- Post painted fire resistance to exceed Class A ASTM (in accordance with ASTM
testing and methodology).
- Coordinate paint in accordance with above paint pre-amble.
Ceiling Finishes
Sealed Concrete
- Either pigmented or non-pigmented water based non-volatile organic compound
acrylic penetrating sealer selected to suit project requirements.
183
Alternatively:
- Suspended fiberglass ceiling, closed cell.
- Panel and exposed supporting elements finished with paint in accordance with
above paint pre-amble.
184
- Panels must be set up using screws, perimeter and joint taping, joint compounds and
coating in accordance with the performance required.
- Access panels should be flush mounted, full 180° swing opening with safety catch,
locking system and finished to match adjacent area.
Doors
The following are general, minimum standards for all doors:
- The specification of doors must be coordinated with various requirements
including fire rating, structural requirements and construction methodology.
- Single width clear opening, minimum between 800 and 1200 mm, as required for
each door.
- Double width (paired) minimum clear opening - 1800 mm.
- Office entrance minimum clear opening - 900 mm.
- Coordinate door push, kick and armor plates with T.S. Hardware
Recommendations and Minimum Standards.
- Coordinate finishes and colors with T.S. BOH Color Schedule for specific
requirements.
185
Metal Door and Frame
Same as above, except the following:
- Door faces and frames to be minimally constructed from hot dipped or electro
galvanized steel.
- Panel edges to be closed flush with 1.63 mm sheet steel welded in place.
- Door and frame to be factory finished with applied polyester baked enamel or
site applied metal primer and two roller coats of acrylic based paint.
Alternatively:
- MDF or softwood components and frames, kiln dried and treated with water
repellent and preservatives.
- Panel faces to be selected from
- Timber veneer, sealed catalytic polyurethane 2 coat finish.
- High pressure plastic laminate thermally adhered to substrate.
- Softwood painted finish in accordance with the above paint pre-amble.
- Panel thickness minimally 38 mm – coordinate with fire and acoustic
requirements.
- Panel edges to be closed flush with timber/MDF strips adhered and nailed in
place.
- Frame jamb depth and profile to be selected to match installation
requirements.
- Install frames with countersunk screws or anchor bolts.
- Coordinate with T.S. Hardware Recommendations and Minimum
Standards.
186
Introduction
All operable partition systems must be factory manufactured with fully coordinated
panels and tracks. The system must be field measured and installed in accordance with
the following minimum requirements:
- Top mounted track acoustically anchored to level structure.
- Plumb side walls.
- Level floor.
- Construction tolerance in accordance with ISO 3443.
- Sealed, acoustically insulated, ceiling plenum barrier.
- Indirect HVAC ducts.
- Absence of acoustic flanking paths.
The entire finished system and all associated construction works must be manufactured
and installed to meet the prevailing local codes and requirements or in accordance with
the following specifications.
Acoustical Performance
The manufacture and installation of all operable partition systems must be closely
coordinated with the associated works.
Sound transmission class (laboratory) testing of manufactured and finished panels, pass
and pocket doors must minimally achieve:
- All areas 50 STC
Manufacturer must submit an independently certified laboratory report carried out in
conformity with prevailing ASTM or ISO designations.
187
Panel Construction
All panels must be of individual omni-directional type and minimally comply with the
following requirements:
- Accommodate variable width openings.
- Top supported, side stacking.
- Mechanical operation of full width retractable spring loaded seals via removable
lever located at 1000 mm height on side of panel. Horizontal top and bottom
seals exerting minimum 45 kg pressure with a nominal clearance of 40 mm.
- Tongue and groove vertical seals with minimum 20 mm interlock.
- Both vertical faces suitable for original or third party factory or field installation of
Interior Designer’s specified finish of fabric, wood veneer, or other approved
material. Perimeter metal protective edge and kick plate coordinated by Interior
Designer.
188
Pocket Doors/Pass Doors
Both pocket and pass doors shall be fully coordinated by Manufacturer/Installer to
minimally comply with:
- Finish to match Interior Designer’s panel specification.
- STC and NIC ratings to match panel ratings. Submittal of independent test
results.
- Three full mortice type hinges or top and bottom pivot hinges per door panel.
- Hardware to be recessed mounted, finish to match panel material. Spring loaded
latches with locking facility as specifically required by T.S. Pocket doors latch
to be free from inside face.
Jambs
All final closing panels are to be located at a structure with a similar or higher STC rating
to the panel system and minimally equipped with:
- Lever closure device providing minimum constant pressure of 100 kg acting on
twin acoustical compression seals.
- Wall mounted receiving jamb with opening dimensions to match closing panel.
- Pressure relay switch providing signal to third party audio/visual, lighting and
HVAC controlling devices.
189
Attachments to this chapter:
- Project Completion Sequence
Introduction
The Owner/Developer will confirm to Operator, in writing, within a period not less than
twelve (12) months prior to the formal opening date in order to allow Operator to adequately
plan and conduct its pre-opening activities. Progress towards achieving this date will be
monitored and any change will require the written mutual consent of both
Owner/Developer and Operator
To achieve a satisfactory handover of the Hotel to The Operator a sequential style of area by
area completion, as illustrated in the attached pro-forma handover schedule, is required.
It is recommended that the Owner/Developer closely monitors and manages the on-site
activity against an effective coordinated project timetable to achieve compliance with the
confirmed formal opening date.
The time required by Operator to conduct on site employee training and operational
commissioning will vary from hotel to hotel and will be dependent on factors such as:
- Construction timetable
- Local conditions of staff recruitment and training
- Operational commissioning logistics
- Pre-opening budget
During the course of the construction process, and in consideration with these factors,
The Operator will prepare an area by area handover schedule that is specific to the project. This
schedule will be submitted to the Owner/Developer for review, approval and subsequent
coordination with the project timetable. Any changes to an approved handover schedule
will require prior mutual consent of both the Owner/Developer and Operator.
190
Preparation for Handover
Areas that are scheduled for handover to The Operator shall be substantially completed of all:
The Operator will not be able to inspect or prepare to take over any area in which these
minimum standards have not been completed.
The Operator will not be able to inspect or prepare to take over any MEP system or component
that has not fully been tested and commissioned with adequate recorded results.
The Operator will minimally require adequate professional training for operational usage,
together with all documentation relating to commissioning, servicing, maintenance, and
warranty conditions prior to handover of any system or component. The submittal of as-
built information must follow in a timely manner and minimally prior to the formal opening
of the Hotel.
The operator will not be able to take-over any system or component for which the above have
not been completed.
Any take over will not imply Hyatt’s final acceptance of systems or components, which
will be subject to full load testing under operating environment and conditions, and the
remedy of all recorded, hidden and latent defects.
191
Pre-Handover Inspection Report
Areas shall be inspected by the Owner/Developer, together with the relevant
Consultants, Contractors, and Project Management upon reaching completion. A
coordinated report will be prepared by either the relevant Consultant or Project
Management detailing:
The coordinated report will be circulated to The Operator and any third parties as necessary.
Inspection by Operator
Following receipt of the Pre-Handover Inspection Report and subject to a satisfactory
level of completion achieved, The Operator shall conduct their own inspection and detail:
The Operator will issue this report to the Owner/Developer and any third parties as instructed.
The Operator will not be able to take-over any areas for which a report detailing their comments
has not been prepared and circulated or any areas, which have not been substantially
completed and installed with FF&E.
The Operator will not be able to take over any areas in which non-hotel personnel have access.
Such areas may be mutually utilized by all parties until they can be secured, completed,
inspected and prepared for Handover to The Operator.
All areas, which have been provisionally taken over by The Operator will be under their full
control including all keying systems and issuance of keys and, therefore, The Operator will be
responsible for any damage that is not a recorded, hidden or latent defect for which the
Owner/Developer or General Contractor shall remain responsible to remedy .
192
All costs associated with The Operator provisional area occupation, such as energy
consumption, including that used for the testing and commissioning of the MEP systems
and components, and security attendance at the project site prior to the formal opening,
shall be appropriated according to the terms and conditions of the Management
Agreement.
Upon completion of notified defects, the work will be re-inspected and accepted or
detailed as requiring further remedy.
In the event of a hidden or latent defect becoming apparent, The Operator will notify the
Owner/Developer in writing of the defect and it shall be removed accordingly.
Should any notified defect remain un-remedied and cause interruption to the hotel
operation or discomfort or jeopardize the safety of the building occupants, The Operator may
elect to resolve the defect according to the terms and conditions of the Management
Agreement.
193
Formal Opening of Hotel/Pro-Forma Handover Schedule
The formal opening of the Hotel shall occur in accordance with the terms and conditions
set forth in the Management Agreement. Construction progress shall be monitored.
The Operator and the Owner/Developer shall mutually agree upon a handover schedule together
a diagram showing the sequence of the area-by-area handover.
The following pro-forma example table must be tailored for each specific project and the
progress sequence and methodology being followed.
Ten Weeks Eight Six Weeks Four Weeks Three Two Weeks One Week
Prior to Weeks Prior to Prior to Weeks Prior to Prior to
Opening Prior to Opening Opening Prior to Opening Opening
Opening Opening
Trash &
Garbage
Handling
Areas
195
Attachment
Project Completion
- “Project Completion Sequence”
Project Completion Sequence
Consultants/Project Management
MEP Commissioning or Inspection
Remedy of Defects
Hotel Opening