Republic of the Philippines

DEPARTMENT OF AGRICULTURE
BUREAU OF FISHERIES AND AQUATIC RESOURCES
Region XI, R. Magsaysay Ave., Davao City
Tel. no. (082)227-1538 Fax: (082)227-1539

June 24, 2019

FATMA M. IDRIS, CESO V


Regional Director
Bureau of Fisheries and Aquatic Resources XI
Ramon Magsaysay Avenue, Davao City

Dear Madam:

Greetings!

This has reference to the on-going construction project entitled – “Construction of the proposed
Three (3) Storey BFAR XI Regional Office Building” located at Ramon Magsaysay Avenue,
Davao City with a contract amounting to Php 47, 321,733.51.

I would like to inform you on the on-going progress of the project from the delivery of first
floor steel column at the site and erection of steel column last Thursday. Also, all the steel
column in the first floor had already been installed last Friday.

Anent to this, we would also like to inform you on the on-going preparation of the wide flange
for the installation of steel column at the second floor. Attached are some photos of the
monitoring list for further reference.

Very truly yours,

ABDULLAH Y. MANGATONG
Engineer II
Republic of the Philippines
DEPARTMENT OF AGRICULTURE
BUREAU OF FISHERIES AND AQUATIC RESOURCES
Region XI, R. Magsaysay Ave., Davao City
Tel. no. (082)227-1538 Fax: (082)227-1539

Activity: Metal Works (Erection of First Floor Steel Column)


Date: June 20, 2019 (Thursday)
Materials Delivered: First Floor Steel Column
No. of Steel Column Delivered: 14 pcs No. of Steel Column Installed: 7 pcs
3 pcs – Column – 1 1 pc – Column - 1
4 pcs – Column – 2 4 pcs – Column - 2
2 pcs – Column – 3 2 pcs – Column - 3
3 pcs – Column – 4
2 pcs – Column – 5
Total: 14 pcs Total: 7 pcs

Actual Photos
Republic of the Philippines
DEPARTMENT OF AGRICULTURE
BUREAU OF FISHERIES AND AQUATIC RESOURCES
Region XI, R. Magsaysay Ave., Davao City
Tel. no. (082)227-1538 Fax: (082)227-1539

Activity: Metal Works (Erection of First Floor Steel Column)


Date: June 21, 2019 (Friday)
Materials Delivered: First Floor Steel Column
No. of Steel Column Delivered: 14 pcs No. of Steel Column Installed: 7 pcs
2 pcs – Column – 1 4 pc – Column - 1
6 pcs – Column – 2 6 pcs – Column - 2
3 pcs – Column – 3 3 pcs – Column - 3
3 pcs – Column – 4
2 pcs – Column - 5
Total: 11 pcs Total: 18 pcs