Solution For Install Circuit Breaker at Lorain Rectifier: Technical Department
Solution For Install Circuit Breaker at Lorain Rectifier: Technical Department
Customer: Mobinil
Problem: it is rarely to get standard Lorain rectifier circuit breaker with different rate at Mobinil
stock or the local market
Solution: Modify the load bus bar of the rectifier to install the available C.B (Schneider) by
installing new copper kit
Note:
Upper copper
Base Copper
Technical Department
Load Cable
Plastic Cover
Old Circuit Breaker
.
Installation Process
- Dismantle the plastic cover
- Dismantle load C.B to get 3 free screws
- Install the base copper at the free 3 screws
- Install the needed C.B at the copper base
- Install the upper copper at the new C.B and at the isolation bar
- Install the load cable at the upper copper
- Install the plastic cover
Technical Department
Isolation bar
New C.B
Final Shape