Technical Specification

1. Item Description : Bus Duct with Rubber Bellow between Diesel


Generator and Cable gland Plate
2. Type : NON - PHASE SEGREGATED BUSDUCT
a) Service - Indoor
b) Insulation between phases – Air
Insulation
c) Degree of Protection – IP54

3. Reference Standard : IS:8623 PART-2(1993)


4. Rated Voltage : 3 Ph -415V AC +/- 10%
5. No of Phases : 3Ph+N
6. Frequency : 50HZ
7. Electrical Clearances :
a) Phase-Phase -- 25 mm
b) Phase-Earth – 25 mm
8. Insulation Level : 3.0 KV (1 min. Hipotrms)
9. Rated Continuous current at
50 Degree Ambient : 1600 Amps
10. Rated Short time current :
a) Symmetrical kA for 1 sec : 50KA (rms)
b) Momentary kA peak : 105KA
(Peak)
11. Maximum temperature rise over
50 Deg. C ambient :
a) Bus Conductor : 55 Degree
b) Bus Enclosure & supporting
Structure: 30 Degree
c) Rated hottest spot temperature of Bus
Conductor Silver Joint: 105 Degree
d) Bus Enclosure &Supporting
Structure: 80 Degree
12. Type of Ventilation : Natural Air
13. Overhaul Bus bar design : TPN with Al Alloy
14. Bus bar end termination : Tinned Finish with customer specified
dimension holes

15. Material :
a) Conductor (PHASE & Neutral) -
Aluminium
b) Enclosure –Aluminium
c) Earth Bar - Aluminium
16. Conductivity :
a) Conductor- 55 % IACS
b) Enclosure - 56% for Al encl

17. Conductor Shape : Rectangular


18. Conductor size for Phase & Neutral :
a) Width in mm – 150
b) Thickness in mm – 10
c) No of buses - 2 Nos. (Per Phase)
- 1 No. (Neutral)
19. Conductor size for Earth :
a) Width in mm – 50
b) Thickness in mm – 10
c) No of buses – 2 Nos

20. Enclosure Finish Outside


(Outdoor/Indoor)/ Inside :
a) Bus bar : MATT BLACK
b) Enclosure Interior : MATT BLACK
c) Enclosure Exterior : Synthetic Enamel
spray paint Siemens grey
21. Type of Support Insulator : Epoxy or FRP (UP-1 Grade)
22. Copper Flexible : Suitable Braided Copper flexible for the rating
Of 1600A between Outgoing cable termination
To Alternator terminal
23. Overhaul dimension :
a) Height: 950(+/- 10MM)
b) Length:800(+/-10MM)
c) Width:450(+/-10MM)
d) Thickness: 3(+/-1MM)
24. Rubber bellow : Neoprene Rubber bellow between Bus duct and
Alternator
25. Support Structure : Adequate support structure shall be provided
with Hot deep galvanized MS structure with
suitable fixtures.
26. General Conditions :
a) The bus duct with internal bus and flexible connection shall be introduced between the
Alternator terminal box and existing Single core 630 Sq mm Copper cables (2 per phase and
one for neutral)
b) The bus duct shall be designed, fabricated and installed with suitable support insulators rated
for 1100V, bus bars and Flexible braided copper links along with rubber bellow to connect the
Alternator terminals with existing single core 630 Sq mm Copper cables.
c) After getting firm order, the firm shall send detailed engineering drawing for the bus duct
indicating, list of material used for various components, detailed dimension of bus duct, size of
copper buses, size of copper flexible, gland plate, support structure, along with Bill of material
for review and approval
d) Adequate Hot dip Galvanized support structure shall be given to the bus duct to take care of
mechanical integrity and arrest the vibration.
e) The dimensional drawing of the Alternator (1010KVA) is attached here with for reference
(The dimensions mentioned in the drawing shall be verified at the field)
f) The design, Fabrication and installation shall be made to suit the site condition.
g) Fabrication shall be started only after approving the drawing by NPCIL-MAPS
h) All the relevant test certificate shall be submitted for verification
i) QA Plan shall be produced for final verification to NPCIL.
j) The Bus duct shall be offered for inspection before delivery and the inspection date shall be
informed well in advance to NPCIL.
k) Even though the drawing and BOM is approved by the department, during installation, the
responsibility of matching the bus duct with generator terminal box, supply of material if any
required to suit with site condition and alignment of bus duct with generator terminal box and
interconnection of generator terminal leads to bus duct leads for phase and neutral rest with the
contractor.
l) Installation and commissioning of the supplied item is under the scope of the contract
m) To terminate 630Sqmm single core copper cables (2 per phase and one on neutral) on the bus
duct, the required copper lug, double compression brass cable glands, non-magnetic gland
plate of sufficient thickness and other hardware requirement are under the scope of the
contract.
n) While visiting site for installation and commissioning they shall strictly comply with the safety
and security guidelines issued by station.
o) After receiving the purchase order the firm can make a visit to site to understand the field
requirements.
……………………..