2.0 LEGEND:
The Contractor shall not process the activity/item beyond the Hold
Point without written approval from Engineer-in-charge.
2.3 Cube test sample collection from the mix, curing and its
testing as per IS: 456, submission of following laboratory
reports ,
WC HP
a) slump test - field
b) cube strength - lab/field
WC HP
3.1 Plastering :
Visual inspection, sieve analysis and carrying out of all WC HP
field tests of sand as per attached specifications
Verification of the test reports of all the tests of cement WC HP
and sand specified in tender documents from approved
laboratory supplied by the contractor with respect to the
specifications
WC W
Carrying out plastering of specified thickness with CM
as per specification.
WC HP
Final acceptance after checking thickness of plaster with
thickness gauge to be provided by the contractor at some