STANDARD INSPECTION & TEST PLAN (I T P ) FOR SAND PAD

GENERAL NOTES:

Inspection and Test Plan(ITP) given herein is indicative only. The
provisions indicated herein for stage wise inspection are minimum and
the Engineer-in-Charge may decide to increase the Hold Point / Witness
Point. Contractor has to prepare ITPs for any of the activities not covered
herein, submit the same to HPCL and obtain their approval.

Contractor to prepare required reporting formats and job procedures for
each activity i.e. Setting out of work, levels grid co-ordinate wise,
submission of Sand samples meeting tender specifications along with soil
lab. test report, watering, OMC, Rolling , carting away earth etc to HPCL
for approval well in advance prior to commencement of activity. Any
deviation to ITP shall be subjected to HPCLs written approval. Contractor
to carry out 100% examination of all activities and proper records shall be
maintained and made available to HPCL Officers requirement at any
time of inspection during the contract period.
2.0 LEGEND :
2.1 HP: HOLD POINT

A point which requires inspection/verification and acceptance by HPCL
or HPCL nominated consultant like NABL approved lab/ Jadavpur
University before any further processing is permitted.
The contractor shall not process the activity/item beyond the Hold Point
without written approval from Engineer-in-Charge.

2.2 W : Witness Point

An Activity which requires witness by HPCL when activity is performed.
2.3 RW : Review of Contractors Documentation

2.4 S : Surveillance Inspection by HPCL

Monitoring of observations to verify whether or not
materials/items/services confirms to specified requirement. Surveillance
activities may include audit, inspection, witness of testing, review of
quality documentation & records, personnel qualifications, etc.

2.5 WC: 100% examination by Contractor.
3 of 5



3.0 The Indicative Inspection and Test Plan(ITP) is as given below:



Sr.
No.
ACTIVITY CONTRACTOR HPCL
1 SAND PAD

1.0

Preparation of Lay out drawing i.e TANK
FARM B on Auto Cad basis guide line
Lay Out drawing after taking As it is
Measurements at site through survey
work by Total Station for various existing
facilities & Construction drawing for
Sand Pad comprising Plan & Cross
Section incorporating all requisite details
like Co-ordinates of Temp. BM for Tk C/L,
Reduce Levels etc complete as guided
by HPCL & taking approval on Hard
Copy before commencement of work
from HPCL Engineer in Charge.


WC

HP

1.1

Fixing of Tank Centre co-ordinates with
respect to HPCLB.M. as per Approved
lay out vide pt. 1.0 , Setting out of
various Control point & alignments per
AFC drawing vide pt.1.0 , grid levels
5mx5m ,co-ordinates wise survey &
recording. The readings will Be taken on
same co-ordinates in subsequent
activity.


WC

HP

1.2

Collection of Sand samples from various
borrow areas locally, soil sample lab
analysis by NABL approved lab as per IS
380 , submission to HPCL for approval
with all requisite details. Sand to be
approved by NABL approved lab &
required data for testing at field, the
relative density for compaction as per

WC

HP
4 of 5


IS2720 PART XIV.


1.3

Making trial pits of base size 1.5m x 1.5m
and approximately upto 1.0 m depth as
approved by NABL and collecting soil
samples and performing pocket
penetrometer tests etc by NABL to
assess the load capacity of sand pad.
Reports to be prepared by NABL
approved lab basis above analysis.


WC

HP
To be
cleared
by
NABL &
approv
al by
HPCL

1.4

A)Removal of debris of earlier
foundation app.150 to230mm

B) Taking the RL co- ordinate wise on
grid of 5Mx 5M

WC



WC
HP
NABL &
HPCL

HPCL

1.5


(A) SAND LAYING :
- 200 mm layer checking it with
templates/tools at various co-ordinates
& recording.

- Watering the layer as guided by
Procedure given NABL approved lab.

(B) COMPACTION :

- Procedure to be given by HPCL to
achieve 85% Relative density at site

- Rolling/ Compaction by Plate Vibrator
the OMC watered Sand layer
immediately till 85% relative density
achieved.

- Testing for compaction to confirm its
85% relative density achieved co-
ordinate wise, Recording the levels co-
ordinate wise . (Min. 1 no test per 25 sq.
Mtr.)


WC


WC


HPCL



WC




WC




W


W


HP



W






HP
Clearan
ce by
NABL
approv
ed lab
5 of 5


- Offering Tested layer to NABL to
inspect & witness to give clearance for
next layer.


1.6

Construction of Sand Pad as per
Construction drawing to be prepared
by Contractor based on general civil
detail drawing furnished in this tender
duly approved by HPCL, to be
executed as per 1.5 above, cutting /
making of edges etc & HPCLs Site-in
Charge instructions.