SAUDI ARAMCO INSPECTION CHECKLIST (BY SEPCO) SAIC NUMBER DATE APPROVED QR NUMBER
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRE
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A4 Welder skill test (100%, before welding) AWS D1.1 / ASME IX, RT Report
REFERENCE DOCUMENTS:
1- Erection Manual
2- Siemens Drawing
3- ECC - Erection Completion Certificate
SEPCO QC FORM REV 4 16-Apr-16
SAUDI ARAMCO INSPECTION CHECKLIST (BY SEPCO) SAIC NUMBER DATE APPROVED QR NUMBER
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRE
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
SIGNATURES:
SIEMENS
SIEMENS **TFA Representative* (Construction Phase - IK)
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and
Name, Initials and Date:
Date:
*Person Responsible for Completion of Quality Work / Test **TFA - Technical Field Advisor Y = YES N = NO F = FAILED
QR NUMBER
SUBCONTRACTOR
ectrical Power
on Corporation
PLANT NO.
TRAVEL TIME
RAMCO USE ONLY
WORK PERMIT REQUIRED?
RE-INSP DATE
QR NUMBER
SUBCONTRACTOR
ectrical Power
on Corporation
PLANT NO.
TRAVEL TIME
RAMCO USE ONLY
WORK PERMIT REQUIRED?
RE-INSP DATE
Work Verified
Work Verified
Work Verified
Work Verified
Y = YES N = NO F = FAILED