Name of work

RATE ANALYSIS DSR 2016-17

Excavated
Sand lead = 25 km Crush Sand lead Metal lead = 12Km Rock/Soling Add
DSR 2016-17 494.81 =494.81 / = 12km. ( 310.53 ) 12km. ( 310.53 ) = Stone Lead = Total Lift Labour
Item No. Short Description Of Item cum = 310.53/ cum 310.53/ cum 12Km = 379.90 = (5+7+9+11 Add 0% Total Total
Cess @
Total
379.90/Cum (14+15) (16+17) (18+19)
+13) 1% Over
18
P. No. Item No. Basic Rate Constant Amount Constant Amount Constant Amount Constant Amount 17

1 2 3 4 5 6 7 8 9.00 10 11 12 13 14 15 16 a b 18 19 20

( A ) WORK BELLOW PLINTH

Excavation in soil By Mechanical Means A ) 0.00


1 12 1ib 112.00 112.00 0.00 112.00 112.00 0.00 112.00
m to 1.50 m depth

Excavation in H.M. & boulders By Mechanical


2 14 3ib 138.00 138.00 0.00 138.00 138.00 0.00 138.00
Means A ) 0.00 m to 1.50 m depth

4i b / 1
3 Excavation in Soft Rock. Up 0 to 1.50 m 15 305.00 305.00 0.00 305.00 305.00 0.00 305.00
BDA 4

15 KM lead
341.75 (avg of
4 Disposing Excavated Un wanted Materials 411 341.75 341.75 0.00 341.75 341.75 0.00 341.75
Murum,
Earth.)

5 Filling with Excavated Materials 16 9 /BDA 10 72.00 72.00 0.00 72.00 72.00 0.00 72.00

6a By Using 3 BHP Pump 252 11a/24BR4B 103.00 103.00 0.00 103.00 103.00 0.00 103.00

6b By Using 5 to 9 BHP Pump 252 11b/24BR4B 130.00 130.00 0.00 130.00 130.00 0.00 130.00

6c By Using 10 to 19 BHP Pump 252 11c/24BR4B 150.00 150.00 0.00 150.00 150.00 0.00 150.00

7 Rubble Stone Soling 15 cm to 20 cm Thk. 16 11/1 BDA12 835.00 1 379.9 1214.90 0.00 1214.90 1214.90 0.00 1214.90

8 P.C.C.M10 for bedding with crush Sand 25 1b/4, BDE 1 3550.00 0.445 138.19 0.890 276.372 3964.56 0.00 3964.56 3964.56 0.00 3964.56

12a ii / 5
9 Ready Mix RCC M-25 for Footing in Crush Sand 61 5795.00 0.425 131.98 0.850 263.951 6190.93 0.00 6190.93 6190.93 0.00 6190.93
BDF 3a,b
2A b ii / 5
( less Rs117
10 R.C.C.M-25 for columns with Crush Sand 35 8003.00 0.425 131.98 0.850 263.951 8398.93 0.00 8398.93 8398.93 0.00 8398.93
for non
Scada)

3 A a ii / 5
11 Ready Mix R.C.C.M-20 for beams in Crush Sand 39 7378.00 0.425 131.98 0.85 263.951 7773.93 0.00 7773.93 7773.93 0.00 7773.93
BDF 6

R.C.C.M-20 for 75 mm & thk Pardi with Crush 6A a ii / 5


12 52 8953.00 0.425 131.98 0.85 263.951 9348.93 0.00 9348.93 9348.93 0.00 9348.93
Sand BDF 11
Excavated
Sand lead = 25 km Crush Sand lead Metal lead = 12Km Rock/Soling Add
DSR 2016-17 494.81 =494.81 / = 12km. ( 310.53 ) 12km. ( 310.53 ) = Stone Lead = Total Lift Labour
Item No. Short Description Of Item cum = 310.53/ cum 310.53/ cum 12Km = 379.90 = (5+7+9+11 Add 0% Total Total
Cess @
Total
379.90/Cum (14+15) (16+17) (18+19)
+13) 1% Over
18
P. No. Item No. Basic Rate Constant Amount Constant Amount Constant Amount Constant Amount 17

8/5
13 TMT Bar Reinforcement 54 50660.00 50660.00 0.00 50660.00 50660.00 0.00 50660.00
BDF 17

9b / 6
14 Fly Ash Brick Masonry 74 5460.00 5460.00 0.00 5460.00 5460.00 0.00 5460.00
BDG

2b / 11
Providing 12mm thick cement plaster 1:4 with BDL 2A +13 /
15 86+88 211.00 0.015 22.64 233.64 0.00 233.64 233.64 0.00 233.64
fine cement finish 1.4 mm thk. in all positions 11
BDL

Providing and fixing 20 to 25 mm thick rough


10 / 9
16 shahabad box type waterproofing for basement 81 830.00 0.037 55.86 885.86 0.00 885.86 885.86 0.00 885.86
( 0.022 + 0.015 = 0.037 ) BDJ

Providing and fixing 20 to 25mm thick rough


11 / 9
17 shahabad box type water proofing treatment to 82 740.00 0.037 55.86 795.86 0.00 795.86 795.86 0.00 795.86
vertical outside faces BDJ
1 b / 12 BDM
18 Rough Shahbad 40 to 45 mm thk 91 568.00 0.022 33.21 601.21 0.00 601.21 0.00% 0.00 601.21 601.21
1A
Excavated
Sand lead = 25 km Crush Sand lead Metal lead = 12Km Rock/Soling Add
DSR 2016-17 494.81 =494.81 / = 12km. ( 310.53 ) 12km. ( 310.53 ) = Stone Lead = Total Lift Labour
Item No. Short Description Of Item cum = 310.53/ cum 310.53/ cum 12Km = 379.90 = (5+7+9+11 Add 0% Total Total
Cess @
Total
379.90/Cum (14+15) (16+17) (18+19)
+13) 1% Over
18
P. No. Item No. Basic Rate Constant Amount Constant Amount Constant Amount Constant Amount 17

( B )WORK ABOVE PLINTH

1 R.C.C.M-25 for columns with Crush Sand

a Ground /Stilt Floor 8003.00 0.425 131.98 0.85 263.951 8398.93 0.00 8398.93 0.00% 0.00 8398.93 8398.93

b First Floor 8003.00 0.425 131.98 0.85 263.951 8398.93 0.00 8398.93 1.00% 80.03 8478.96 8478.96

c 2 Floor
nd
8003.00 0.425 131.98 0.85 263.951 8398.93 0.00 8398.93 2.00% 160.06 8558.99 8558.99

d 3 Floor
rd
8003.00 0.425 131.98 0.85 263.951 8398.93 0.00 8398.93 3.00% 240.09 8639.02 8639.02
2A b ii / 5
35 BDF 5
e 4th Floor 8003.00 0.425 131.98 0.85 263.951 8398.93 0.00 8398.93 4.00% 320.12 8719.05 8719.05

f 5th Floor 8003.00 0.425 131.98 0.85 263.951 8398.93 0.00 8398.93 5.00% 400.15 8799.08 8799.08

g 6th Floor 8003.00 0.425 131.98 0.85 263.951 8398.93 0.00 8398.93 6.00% 480.18 8879.11 8879.11

h 7th & Above Floors 8003.00 0.425 131.98 0.85 263.951 8398.93 0.00 8398.93 7.00% 560.21 8959.14 8959.14

2 Ready Mix R.C.C.M-20 for beams in Crush Sand

a Ground /Stilt Floor 7378.00 0.425 131.98 0.85 263.951 7773.93 0.00 7773.93 0.00% 0.00 7773.93 7773.93

b First Floor 7378.00 0.425 131.98 0.85 263.951 7773.93 0.00 7773.93 1.00% 73.78 7847.71 7847.71

c 2nd Floor 7378.00 0.425 131.98 0.85 263.951 7773.93 0.00 7773.93 2.00% 147.56 7921.49 7921.49

d 3rd Floor 3 A a ii / 5 7378.00 0.425 131.98 0.85 263.951 7773.93 0.00 7773.93 3.00% 221.34 7995.27 7995.27
39
e 4th Floor BDF 6 7378.00 0.425 131.98 0.85 263.951 7773.93 0.00 7773.93 4.00% 295.12 8069.05 8069.05

f 5th Floor 7378.00 0.425 131.98 0.85 263.951 7773.93 0.00 7773.93 5.00% 368.90 8142.83 8142.83

g 6th Floor 7378.00 0.425 131.98 0.85 263.951 7773.93 0.00 7773.93 6.00% 442.68 8216.61 8216.61

h 7th & Above Floors 7378.00 0.425 131.98 0.85 263.951 7773.93 0.00 7773.93 7.00% 516.46 8290.39 8290.39
Ready Mix R.C.C.M-20 for Slabs & landings in
3
Crush Sand
a Ground /Stilt Floor 8093.00 0.425 131.98 0.85 263.951 8488.93 0.00 8488.93 0.00% 0.00 8488.93 8488.93

b First Floor 8093.00 0.425 131.98 0.85 263.951 8488.93 0.00 8488.93 1.00% 80.93 8569.86 8569.86

c 2nd Floor 8093.00 0.425 131.98 0.85 263.951 8488.93 0.00 8488.93 2.00% 161.86 8650.79 8650.79

d 3rd Floor 4 A a ii / 5 8093.00 0.425 131.98 0.85 263.951 8488.93 0.00 8488.93 3.00% 242.79 8731.72 8731.72
44
e 4th Floor BDF 8 8093.00 0.425 131.98 0.85 263.951 8488.93 0.00 8488.93 4.00% 323.72 8812.65 8812.65

f 5th Floor 8093.00 0.425 131.98 0.85 263.951 8488.93 0.00 8488.93 5.00% 404.65 8893.58 8893.58

g 6th Floor 8093.00 0.425 131.98 0.85 263.951 8488.93 0.00 8488.93 6.00% 485.58 8974.51 8974.51

h 7th & Above Floors 8093.00 0.425 131.98 0.85 263.951 8488.93 0.00 8488.93 7.00% 566.51 9055.44 9055.44
Excavated
Sand lead = 25 km Crush Sand lead Metal lead = 12Km Rock/Soling Add
DSR 2016-17 494.81 =494.81 / = 12km. ( 310.53 ) 12km. ( 310.53 ) = Stone Lead = Total Lift Labour
Item No. Short Description Of Item cum = 310.53/ cum 310.53/ cum 12Km = 379.90 = (5+7+9+11 Add 0% Total Total
Cess @
Total
379.90/Cum (14+15) (16+17) (18+19)
+13) 1% Over
18
P. No. Item No. Basic Rate Constant Amount Constant Amount Constant Amount Constant Amount 17

4 RCC Ready Mix M20 Chajja in Crush Sand

a Ground /Stilt Floor 8488.00 0.425 131.98 0.85 263.951 8883.93 0.00 8883.93 0.00% 0.00 8883.93 8883.93

b First Floor 8488.00 0.425 131.98 0.85 263.951 8883.93 0.00 8883.93 1.00% 84.88 8968.81 8968.81

c 2nd Floor 8488.00 0.425 131.98 0.85 263.951 8883.93 0.00 8883.93 2.00% 169.76 9053.69 9053.69

d 3rd Floor 5 A a ii / 5 8488.00 0.425 131.98 0.85 263.951 8883.93 0.00 8883.93 3.00% 254.64 9138.57 9138.57
50
e 4th Floor BDF 9 8488.00 0.425 131.98 0.85 263.951 8883.93 0.00 8883.93 4.00% 339.52 9223.45 9223.45

f 5th Floor 8488.00 0.425 131.98 0.85 263.951 8883.93 0.00 8883.93 5.00% 424.40 9308.33 9308.33

g 6th Floor 8488.00 0.425 131.98 0.85 263.951 8883.93 0.00 8883.93 6.00% 509.28 9393.21 9393.21

h 7th & Above Floors 8488.00 0.425 131.98 0.85 263.951 8883.93 0.00 8883.93 7.00% 594.16 9478.09 9478.09

5 RCC M 20- 75 MM thk Pardi

a Ground /Stilt Floor 8953.00 0.425 131.98 0.85 263.951 9348.93 0.00 9348.93 0.00% 0.00 9348.93 9348.93

b First Floor 8953.00 0.425 131.98 0.85 263.951 9348.93 0.00 9348.93 1.00% 89.53 9438.46 9438.46

c 2 Floor
nd
8953.00 0.425 131.98 0.85 263.951 9348.93 0.00 9348.93 2.00% 179.06 9527.99 9527.99

d 3 Floor
rd
8953.00 0.425 131.98 0.85 263.951 9348.93 0.00 9348.93 3.00% 268.59 9617.52 9617.52
6A a ii / 5
52
BDF 11
e 4th Floor 8953.00 0.425 131.98 0.85 263.951 9348.93 0.00 9348.93 4.00% 358.12 9707.05 9707.05

f 5th Floor 8953.00 0.425 131.98 0.85 263.951 9348.93 0.00 9348.93 5.00% 447.65 9796.58 9796.58

g 6th Floor 8953.00 0.425 131.98 0.85 263.951 9348.93 0.00 9348.93 6.00% 537.18 9886.11 9886.11

h 7th & Above Floors 8953.00 0.425 131.98 0.85 263.951 9348.93 0.00 9348.93 7.00% 626.71 9975.64 9975.64

6 TMT Bar Reinforcement

a Ground /Stilt Floor 50660.00 50660.00 0.00 50660.00 0.00% 0.00 50660.00 50660.00

b First Floor 50660.00 50660.00 0.00 50660.00 1.00% 506.60 51166.60 51166.60

c 2nd Floor 50660.00 50660.00 0.00 50660.00 2.00% 1013.20 51673.20 51673.20

d 3rd Floor 50660.00 50660.00 0.00 50660.00 3.00% 1519.80 52179.80 52179.80
8/5
54
e 4th Floor
BDF 17 50660.00 50660.00 0.00 50660.00 4.00% 2026.40 52686.40 52686.40

f 5th Floor 50660.00 50660.00 0.00 50660.00 5.00% 2533.00 53193.00 53193.00

g 6th Floor 50660.00 50660.00 0.00 50660.00 6.00% 3039.60 53699.60 53699.60

h 7th & Above Floors 50660.00 50660.00 0.00 50660.00 7.00% 3546.20 54206.20 54206.20
Excavated
Sand lead = 25 km Crush Sand lead Metal lead = 12Km Rock/Soling Add
DSR 2016-17 494.81 =494.81 / = 12km. ( 310.53 ) 12km. ( 310.53 ) = Stone Lead = Total Lift Labour
Item No. Short Description Of Item cum = 310.53/ cum 310.53/ cum 12Km = 379.90 = (5+7+9+11 Add 0% Total Total
Cess @
Total
379.90/Cum (14+15) (16+17) (18+19)
+13) 1% Over
18
P. No. Item No. Basic Rate Constant Amount Constant Amount Constant Amount Constant Amount 17

7 Fly Ash Brick massonry

a Ground /Stilt Floor 5460.00 0.3 148.44 5608.44 0.00 5608.44 0.00% 0.00 5608.44 5608.44

b First Floor 5460.00 0.3 148.44 5608.44 0.00 5608.44 1.00% 54.60 5663.04 5663.04

c 2nd Floor 5460.00 0.3 148.44 5608.44 0.00 5608.44 2.00% 109.20 5717.64 5717.64

d 3rd Floor 9b / 6 5460.00 0.3 148.44 5608.44 0.00 5608.44 3.00% 163.80 5772.24 5772.24
74
e 4th Floor BDG 5460.00 0.3 148.44 5608.44 0.00 5608.44 4.00% 218.40 5826.84 5826.84

f 5th Floor 5460.00 0.3 148.44 5608.44 0.00 5608.44 5.00% 273.00 5881.44 5881.44

g 6th Floor 5460.00 0.3 148.44 5608.44 0.00 5608.44 6.00% 327.60 5936.04 5936.04

h 7 & Above Floors


th
5460.00 0.3 148.44 5608.44 0.00 5608.44 7.00% 382.20 5990.64 5990.64

8 12 mm thick cement plaster 1:4 without neeru

a Ground /Stilt Floor 157.00 0.015 7.42 164.42 0.00 164.42 0.00% 0.00 164.42 164.42

b First Floor 157.00 0.015 7.42 164.42 0.00 164.42 1.00% 1.57 165.99 165.99

c 2nd Floor 157.00 0.015 7.42 164.42 0.00 164.42 2.00% 3.14 167.56 167.56

d 3rd Floor 2b / 11 BDL 157.00 0.015 7.42 164.42 0.00 164.42 3.00% 4.71 169.13 169.13
86
e 4th Floor 2A 157.00 0.015 7.42 164.42 0.00 164.42 4.00% 6.28 170.70 170.70

f 5th Floor 157.00 0.015 7.42 164.42 0.00 164.42 5.00% 7.85 172.27 172.27

g 6th Floor 157.00 0.015 7.42 164.42 0.00 164.42 6.00% 9.42 173.84 173.84

h 7th & Above Floors 157.00 0.015 7.42 164.42 0.00 164.42 7.00% 10.99 175.41 175.41
Providing 12mm thick cement plaster 1:4 with
9 neeru finish to plastered surface for in all
positions
a Ground /Stilt Floor 186.00 0.015 7.42 193.42 0.00 193.42 0.00% 0.00 193.42 193.42

b First Floor 186.00 0.015 7.42 193.42 0.00 193.42 1.00% 1.86 195.28 195.28

c 2nd Floor 186.00 0.015 7.42 193.42 0.00 193.42 2.00% 3.72 197.14 197.14

d 3rd Floor 2b / 11 BDL 186.00 0.015 7.42 193.42 0.00 193.42 3.00% 5.58 199.00 199.00
86+87 2A + 8/11 BDL
e 4th Floor 10 186.00 0.015 7.42 193.42 0.00 193.42 4.00% 7.44 200.86 200.86

f 5th Floor 186.00 0.015 7.42 193.42 0.00 193.42 5.00% 9.30 202.72 202.72

g 6th Floor 186.00 0.015 7.42 193.42 0.00 193.42 6.00% 11.16 204.58 204.58

h 7th & Above Floors 186.00 0.015 7.42 193.42 0.00 193.42 7.00% 13.02 206.44 206.44
Providing 12mm thick cement plaster 1:4 with
10 fine cement finish 1.4 mm thk. to plastered
surface for in all positions
a Ground /Stilt Floor 211.00 0.015 7.42 218.42 0.00 218.42 0.00% 0.00 218.42 218.42

b First Floor 211.00 0.015 7.42 218.42 0.00 218.42 1.00% 2.11 220.53 220.53

2b / 11 BDL
86+88 2A +13 / 11
BDL
Excavated
Sand lead = 25 km Crush Sand lead Metal lead = 12Km Rock/Soling Add
DSR 2016-17 494.81 =494.81 / = 12km. ( 310.53 ) 12km. ( 310.53 ) = Stone Lead = Total Lift Labour
Item No. Short Description Of Item cum = 310.53/ cum 310.53/ cum 12Km = 379.90 = (5+7+9+11 Add 0% Total Total
Cess @
Total
379.90/Cum (14+15) (16+17) (18+19)
+13) 1% Over
18
P. No. Item No. Basic Rate Constant Amount Constant Amount Constant Amount Constant Amount 17

c 2 Floor
nd
211.00 0.015 7.42 218.42 0.00 218.42 2.00% 4.22 222.64 222.64

d 3rd Floor 2b / 11 BDL 211.00 0.015 7.42 218.42 0.00 218.42 3.00% 6.33 224.75 224.75
86+88 2A +13 / 11
e 4th Floor BDL 211.00 0.015 7.42 218.42 0.00 218.42 4.00% 8.44 226.86 226.86

f 5th Floor 211.00 0.015 7.42 218.42 0.00 218.42 5.00% 10.55 228.97 228.97

g 6th Floor 211.00 0.015 7.42 218.42 0.00 218.42 6.00% 12.66 231.08 231.08

h 7th & Above Floors 211.00 0.015 7.42 218.42 0.00 218.42 7.00% 14.77 233.19 233.19
Two coat Sand faced plaster 1:4 c.m.(21 to
11
23mm Thk.)
a Ground /Stilt Floor 398.00 0.035 17.32 415.32 0.00 415.32 0.00% 0.00 415.32 415.32

b First Floor 398.00 0.035 17.32 415.32 0.00 415.32 1.00% 3.98 419.30 419.30

c 2nd Floor 398.00 0.035 17.32 415.32 0.00 415.32 2.00% 7.96 423.28 423.28

d 3rd Floor 398.00 0.035 17.32 415.32 0.00 415.32 3.00% 11.94 427.26 427.26
87 5/11BDL 7
e 4th Floor 398.00 0.035 17.32 415.32 0.00 415.32 4.00% 15.92 431.24 431.24

f 5th Floor 398.00 0.035 17.32 415.32 0.00 415.32 5.00% 19.90 435.22 435.22

g 6th Floor 398.00 0.035 17.32 415.32 0.00 415.32 6.00% 23.88 439.20 439.20

h 7th & Above Floors 398.00 0.035 17.32 415.32 0.00 415.32 7.00% 27.86 443.18 443.18

internal cement plaster 6 mm thick in a single


coat in cement mortar 1:3 with neeru finish

a Ground /Stilt Floor 144.00 0.0076 3.76 147.76 0.00 147.76 0.00% 0.00 147.76 147.76

b First Floor 144.00 0.0076 3.76 147.76 0.00 147.76 1.00% 1.44 149.20 149.20

c 2nd Floor 144.00 0.0076 3.76 147.76 0.00 147.76 2.00% 2.88 150.64 150.64

d 3rd Floor 1b/11 144.00 0.0076 3.76 147.76 0.00 147.76 3.00% 4.32 152.08 152.08
86+87 BDL1+8/11
e 4th Floor BDL 10 144.00 0.0076 3.76 147.76 0.00 147.76 4.00% 5.76 153.52 153.52

f 5th Floor 144.00 0.0076 3.76 147.76 0.00 147.76 5.00% 7.20 154.96 154.96

g 6 th
Floor 144.00 0.0076 3.76 147.76 0.00 147.76 6.00% 8.64 156.40 156.40

h 7th & Above Floors 144.00 0.0076 3.76 147.76 0.00 147.76 7.00% 10.08 157.84 157.84

Providing & fixing mild steel railing to


13
staircases etc. complete.

a Ground /Stilt Floor #REF! #REF! 0.00 #REF! 0.00% #REF! #REF! #REF!
b First Floor #REF! #REF! 0.00 #REF! 1.00% #REF! #REF! #REF!
c 2nd Floor #REF! #REF! 0.00 #REF! 2.00% #REF! #REF! #REF!
d 3rd Floor #REF! #REF! 0.00 #REF! 3.00% #REF! #REF! #REF!
RA
e 4th Floor #REF! #REF! 0.00 #REF! 4.00% #REF! #REF! #REF!
f 5th Floor #REF! #REF! 0.00 #REF! 5.00% #REF! #REF! #REF!
g 6th Floor #REF! #REF! 0.00 #REF! 6.00% #REF! #REF! #REF!
h 7th & Above Floors #REF! #REF! 0.00 #REF! 7.00% #REF! #REF! #REF!
14 Water proofing Bedding in 1:3 CM
a Ground /Stilt Floor 340.00 0.02 9.90 349.90 0.00 349.90 0.00% 0.00 349.90 349.90

b First Floor 340.00 0.02 9.90 349.90 0.00 349.90 1.00% 3.40 353.30 353.30

80 5/9 BDJ
Excavated
Sand lead = 25 km Crush Sand lead Metal lead = 12Km Rock/Soling Add
DSR 2016-17 494.81 =494.81 / = 12km. ( 310.53 ) 12km. ( 310.53 ) = Stone Lead = Total Lift Labour
Item No. Short Description Of Item cum = 310.53/ cum 310.53/ cum 12Km = 379.90 = (5+7+9+11 Add 0% Total Total
Cess @
Total
379.90/Cum (14+15) (16+17) (18+19)
+13) 1% Over
18
P. No. Item No. Basic Rate Constant Amount Constant Amount Constant Amount Constant Amount 17

c 2 Floor
nd
340.00 0.02 9.90 349.90 0.00 349.90 2.00% 6.80 356.70 356.70

d 3rd Floor 340.00 0.02 9.90 349.90 0.00 349.90 3.00% 10.20 360.10 360.10
80 5/9 BDJ
e 4th Floor 340.00 0.02 9.90 349.90 0.00 349.90 4.00% 13.60 363.50 363.50

f 5th Floor 340.00 0.02 9.90 349.90 0.00 349.90 5.00% 17.00 366.90 366.90

g 6th Floor 340.00 0.02 9.90 349.90 0.00 349.90 6.00% 20.40 370.30 370.30

h 7th & Above Floors 340.00 0.02 9.90 349.90 0.00 349.90 7.00% 23.80 373.70 373.70
Excavated
Sand lead = 25 km Crush Sand lead Metal lead = 12Km Rock/Soling Add
DSR 2016-17 494.81 =494.81 / = 12km. ( 310.53 ) 12km. ( 310.53 ) = Stone Lead = Total Lift Labour
Item No. Short Description Of Item cum = 310.53/ cum 310.53/ cum 12Km = 379.90 = (5+7+9+11 Add 0% Total Total
Cess @
Total
379.90/Cum (14+15) (16+17) (18+19)
+13) 1% Over
18
P. No. Item No. Basic Rate Constant Amount Constant Amount Constant Amount Constant Amount 17
15 BB Coba for Terraces/WC Bath
a Ground /Stilt Floor 610.00 0.026 12.87 622.87 0.00 622.87 0.00% 0.00 622.87 622.87

b First Floor 610.00 0.026 12.87 622.87 0.00 622.87 1.00% 6.10 628.97 628.97

c 2nd Floor 610.00 0.026 12.87 622.87 0.00 622.87 2.00% 12.20 635.07 635.07

d 3rd Floor 610.00 0.026 12.87 622.87 0.00 622.87 3.00% 18.30 641.17 641.17
80 4/9 BDJ
e 4th Floor 610.00 0.026 12.87 622.87 0.00 622.87 4.00% 24.40 647.27 647.27

f 5th Floor 610.00 0.026 12.87 622.87 0.00 622.87 5.00% 30.50 653.37 653.37

g 6th Floor 610.00 0.026 12.87 622.87 0.00 622.87 6.00% 36.60 659.47 659.47

h 7 & Above Floors


th
610.00 0.026 12.87 622.87 0.00 622.87 7.00% 42.70 665.57 665.57

16 Vitrified Tile

a Ground /Stilt Floor 890.00 0.020 9.90 899.90 0.00 899.90 0.00% 0.00 899.90 899.90

b First Floor 890.00 0.020 9.90 899.90 0.00 899.90 1.00% 8.90 908.80 908.80

c 2nd Floor 890.00 0.020 9.90 899.90 0.00 899.90 2.00% 17.80 917.70 917.70

d 3rd Floor 19 A a / 12 890.00 0.020 9.90 899.90 0.00 899.90 3.00% 26.70 926.60 926.60
97
e 4th Floor BDM 12 890.00 0.020 9.90 899.90 0.00 899.90 4.00% 35.60 935.50 935.50

f 5th Floor 890.00 0.020 9.90 899.90 0.00 899.90 5.00% 44.50 944.40 944.40

g 6th Floor 890.00 0.020 9.90 899.90 0.00 899.90 6.00% 53.40 953.30 953.30

h 7th & Above Floors 890.00 0.020 9.90 899.90 0.00 899.90 7.00% 62.30 962.20 962.20
17 P/L Ceramics Anti skid Tile flooring
a Ground /Stilt Floor 968.00 0.017 8.41 976.41 0.00 976.41 0.00% 0.00 976.41 976.41

b First Floor 968.00 0.017 8.41 976.41 0.00 976.41 1.00% 9.68 986.09 986.09

c 2nd Floor 968.00 0.017 8.41 976.41 0.00 976.41 2.00% 19.36 995.77 995.77

d 3rd Floor 968.00 0.017 8.41 976.41 0.00 976.41 3.00% 29.04 1005.45 1005.45
102 28/12 BDM
e 4th Floor 968.00 0.017 8.41 976.41 0.00 976.41 4.00% 38.72 1015.13 1015.13

f 5th Floor 968.00 0.017 8.41 976.41 0.00 976.41 5.00% 48.40 1024.81 1024.81

g 6th Floor 968.00 0.017 8.41 976.41 0.00 976.41 6.00% 58.08 1034.49 1034.49

h 7th & Above Floors 968.00 0.017 8.41 976.41 0.00 976.41 7.00% 67.76 1044.17 1044.17

18 P/L 30 cm. x 60 cm. For dado and skirting


a Ground /Stilt Floor 932.00 0.012 5.94 937.94 0.00 937.94 0.00% 0.00 937.94 937.94

b First Floor 932.00 0.012 5.94 937.94 0.00 937.94 1.00% 9.32 947.26 947.26

c 2nd Floor 932.00 0.012 5.94 937.94 0.00 937.94 2.00% 18.64 956.58 956.58

d 3rd Floor 10a / 12 932.00 0.012 5.94 937.94 0.00 937.94 3.00% 27.96 965.90 965.90
94
e 4th Floor BDM 13 932.00 0.012 5.94 937.94 0.00 937.94 4.00% 37.28 975.22 975.22

f 5th Floor 932.00 0.012 5.94 937.94 0.00 937.94 5.00% 46.60 984.54 984.54

g 6th Floor 932.00 0.012 5.94 937.94 0.00 937.94 6.00% 55.92 993.86 993.86

h 7th & Above Floors 932.00 0.012 5.94 937.94 0.00 937.94 7.00% 65.24 1003.18 1003.18

19 P/L 60 cm. x 60 cm. Skirting vitrified


a Ground /Stilt Floor 1045.00 0.012 5.94 1050.94 0.00 1050.94 0.00% 0.00 1050.94 1050.94

19 A b / 12
97 BDM 12
Excavated
Sand lead = 25 km Crush Sand lead Metal lead = 12Km Rock/Soling Add
DSR 2016-17 494.81 =494.81 / = 12km. ( 310.53 ) 12km. ( 310.53 ) = Stone Lead = Total Lift Labour
Item No. Short Description Of Item cum = 310.53/ cum 310.53/ cum 12Km = 379.90 = (5+7+9+11 Add 0% Total Total
Cess @
Total
379.90/Cum (14+15) (16+17) (18+19)
+13) 1% Over
18
P. No. Item No. Basic Rate Constant Amount Constant Amount Constant Amount Constant Amount 17

b First Floor 1045.00 0.012 5.94 1050.94 0.00 1050.94 1.00% 10.45 1061.39 1061.39

c 2nd Floor 1045.00 0.012 5.94 1050.94 0.00 1050.94 2.00% 20.90 1071.84 1071.84

d 3rd Floor 19 A b / 12 1045.00 0.012 5.94 1050.94 0.00 1050.94 3.00% 31.35 1082.29 1082.29
97 BDM 12
e 4th Floor 1045.00 0.012 5.94 1050.94 0.00 1050.94 4.00% 41.80 1092.74 1092.74

f 5th Floor 1045.00 0.012 5.94 1050.94 0.00 1050.94 5.00% 52.25 1103.19 1103.19

g 6th Floor 1045.00 0.012 5.94 1050.94 0.00 1050.94 6.00% 62.70 1113.64 1113.64

h 7th & Above Floors 1045.00 0.012 5.94 1050.94 0.00 1050.94 7.00% 73.15 1124.09 1124.09
machine cut machine polished machine cut
20 Kota stone slabs 20 to 25 mm thick for treads
and risers of steps and staircases
a Ground /Stilt Floor 1135.00 0.020 9.90 1144.90 0.00 1144.90 0.00% 0.00 1144.90 1144.90

b First Floor 1135.00 0.020 9.90 1144.90 0.00 1144.90 1.00% 11.35 1156.25 1156.25

c 2nd Floor 1135.00 0.020 9.90 1144.90 0.00 1144.90 2.00% 22.70 1167.60 1167.60

d 3rd Floor 6 b / 12 1135.00 0.020 9.90 1144.90 0.00 1144.90 3.00% 34.05 1178.95 1178.95
93
e 4th Floor BDM 22B 1135.00 0.020 9.90 1144.90 0.00 1144.90 4.00% 45.40 1190.30 1190.30

f 5th Floor 1135.00 0.020 9.90 1144.90 0.00 1144.90 5.00% 56.75 1201.65 1201.65

g 6th Floor 1135.00 0.020 9.90 1144.90 0.00 1144.90 6.00% 68.10 1213.00 1213.00

h 7th & Above Floors 1135.00 0.020 9.90 1144.90 0.00 1144.90 7.00% 79.45 1224.35 1224.35

21 Kota Flooring

a Ground /Stilt Floor 888.00 0.020 9.90 897.90 0.00 897.90 0.00% 0.00 897.90 897.90

b First Floor 888.00 0.020 9.90 897.90 0.00 897.90 1.00% 8.88 906.78 906.78

c 2nd Floor 888.00 0.020 9.90 897.90 0.00 897.90 2.00% 17.76 915.66 915.66

d 3 Floor
rd 4 / 12 BDM 888.00 0.020 9.90 897.90 0.00 897.90 3.00% 26.64 924.54 924.54
91 3B
e 4th Floor 888.00 0.020 9.90 897.90 0.00 897.90 4.00% 35.52 933.42 933.42

f 5th Floor 888.00 0.020 9.90 897.90 0.00 897.90 5.00% 44.40 942.30 942.30

g 6th Floor 888.00 0.020 9.90 897.90 0.00 897.90 6.00% 53.28 951.18 951.18

h 7th & Above Floors 888.00 0.020 9.90 897.90 0.00 897.90 7.00% 62.16 960.06 960.06

Providing sills of polished Kota stone 25 mm to


30mm thick, on a bed of 1:4 cement mortar
including cement float, filling joints with slurry,
22
curing polishing and cleaning complete. Spec. No.:
Bd.M.29 Page No. 391

a Ground /Stilt Floor 870.00 0.020 9.90 879.90 0.00 879.90 0.00% 0.00 879.90 879.90

b First Floor 870.00 0.020 9.90 879.90 0.00 879.90 1.00% 8.70 888.60 888.60

c 2nd Floor 870.00 0.020 9.90 879.90 0.00 879.90 2.00% 17.40 897.30 897.30

d 3rd Floor 7 a / 12 BDM 870.00 0.020 9.90 879.90 0.00 879.90 3.00% 26.10 906.00 906.00
94 29B
e 4th Floor 870.00 0.020 9.90 879.90 0.00 879.90 4.00% 34.80 914.70 914.70

f 5th Floor 870.00 0.020 9.90 879.90 0.00 879.90 5.00% 43.50 923.40 923.40

g 6th Floor 870.00 0.020 9.90 879.90 0.00 879.90 6.00% 52.20 932.10 932.10
Excavated
7 a / 12 BDM Sand lead = 25 km Crush Sand lead Metal lead = 12Km Rock/Soling Add
94 DSR 29B
2016-17 494.81 =494.81 / = 12km. ( 310.53 ) 12km. ( 310.53 ) = Stone Lead = Total Lift Labour
Item No. Short Description Of Item cum = 310.53/ cum 310.53/ cum 12Km = 379.90 = (5+7+9+11 Add 0% Total Total
Cess @
Total
379.90/Cum (14+15) (16+17) (18+19)
+13) 1% Over
18
P. No. Item No. Basic Rate Constant Amount Constant Amount Constant Amount Constant Amount 17

h 7 & Above Floors


th
870.00 0.020 9.90 879.90 0.00 879.90 7.00% 60.90 940.80 940.80

23 50 mm thk M 20 grade Cement Concrete Floor

5B b i / 12
h 7th & Above Floors 93 370.00 0.020 6.21 0.058 18.011 394.22 0.00 394.22 7.00% 25.90 420.12 420.12
BDM 6A

24 Internal Door

a Ground /Stilt Floor RA #REF! #REF! 0.00 #REF! 0.00% #REF! #REF! #REF!
b First Floor RA #REF! #REF! 0.00 #REF! 1.00% #REF! #REF! #REF!
c 2nd Floor RA #REF! #REF! 0.00 #REF! 2.00% #REF! #REF! #REF!
d 3rd Floor RA #REF! #REF! 0.00 #REF! 3.00% #REF! #REF! #REF!
e 4th Floor RA #REF! #REF! 0.00 #REF! 4.00% #REF! #REF! #REF!
f 5th Floor RA #REF! #REF! 0.00 #REF! 5.00% #REF! #REF! #REF!
g 6th Floor RA #REF! #REF! 0.00 #REF! 6.00% #REF! #REF! #REF!
h 7th & Above Floors RA #REF! #REF! 0.00 #REF! 7.00% #REF! #REF! #REF!

25 Toilet door
a Ground /Stilt Floor RA #REF! #REF! 0.00 #REF! 0.00% #REF! #REF! #REF!
b First Floor RA #REF! #REF! 0.00 #REF! 1.00% #REF! #REF! #REF!
c 2nd Floor RA #REF! #REF! 0.00 #REF! 2.00% #REF! #REF! #REF!
d 3rd Floor RA #REF! #REF! 0.00 #REF! 3.00% #REF! #REF! #REF!
e 4th Floor RA #REF! #REF! 0.00 #REF! 4.00% #REF! #REF! #REF!
f 5th Floor RA #REF! #REF! 0.00 #REF! 5.00% #REF! #REF! #REF!
g 6th Floor RA #REF! #REF! 0.00 #REF! 6.00% #REF! #REF! #REF!
h 7th & Above Floors RA #REF! #REF! 0.00 #REF! 7.00% #REF! #REF! #REF!

26 Main door
a Ground /Stilt Floor RA #REF! #REF! 0.00 #REF! 0.00% #REF! #REF! #REF!
b First Floor RA #REF! #REF! 0.00 #REF! 1.00% #REF! #REF! #REF!
c 2nd Floor RA #REF! #REF! 0.00 #REF! 2.00% #REF! #REF! #REF!
d 3rd Floor RA #REF! #REF! 0.00 #REF! 3.00% #REF! #REF! #REF!
e 4th Floor RA #REF! #REF! 0.00 #REF! 4.00% #REF! #REF! #REF!
f 5th Floor RA #REF! #REF! 0.00 #REF! 5.00% #REF! #REF! #REF!
g 6th Floor RA #REF! #REF! 0.00 #REF! 6.00% #REF! #REF! #REF!
h 7th & Above Floors RA #REF! #REF! 0.00 #REF! 7.00% #REF! #REF! #REF!

27 Al Windows with Grill

a Ground /Stilt Floor 4554.00 4554.00 0.00 4554.00 0.00% 0.00 4554.00 4554.00

b First Floor 4554.00 4554.00 0.00 4554.00 1.00% 45.54 4599.54 4599.54

c 2nd Floor 4554.00 4554.00 0.00 4554.00 2.00% 91.08 4645.08 4645.08

32 ii / 18
BDT
138+149 +
1 b / 19
BDU 1A
Excavated
Sand lead = 25 km Crush Sand lead Metal lead = 12Km Rock/Soling Add
DSR 2016-17 494.81 =494.81 / = 12km. ( 310.53 ) 12km. ( 310.53 ) = Stone Lead = Total Lift Labour
Item No. Short Description Of Item cum = 310.53/ cum 310.53/ cum 12Km = 379.90 = (5+7+9+11 Add 0% Total Total
Cess @
Total
379.90/Cum (14+15) (16+17) (18+19)
+13) 1% Over
18
P. No. Item No. Basic Rate Constant Amount Constant Amount Constant Amount Constant Amount 17

d 3 Floor
rd 32 ii / 18 4554.00 4554.00 0.00 4554.00 3.00% 136.62 4690.62 4690.62
BDT
138+149 +
e 4 Floor
th
1 b / 19 4554.00 4554.00 0.00 4554.00 4.00% 182.16 4736.16 4736.16
BDU 1A
f 5th Floor 4554.00 4554.00 0.00 4554.00 5.00% 227.70 4781.70 4781.70

g 6th Floor 4554.00 4554.00 0.00 4554.00 6.00% 273.24 4827.24 4827.24

h 7th & Above Floors 4554.00 4554.00 0.00 4554.00 7.00% 318.78 4872.78 4872.78

28 Aluminum Powder Coated Louvered Window

a Ground /Stilt Floor 2970.00 2970.00 0.00 2970.00 0.00% 0.00 2970.00 2970.00

b First Floor 2970.00 2970.00 0.00 2970.00 1.00% 29.70 2999.70 2999.70

c 2nd Floor 2970.00 2970.00 0.00 2970.00 2.00% 59.40 3029.40 3029.40

d 3rd Floor 2970.00 2970.00 0.00 2970.00 3.00% 89.10 3059.10 3059.10
144 44 / 18 BDT
e 4th Floor 2970.00 2970.00 0.00 2970.00 4.00% 118.80 3088.80 3088.80

f 5th Floor 2970.00 2970.00 0.00 2970.00 5.00% 148.50 3118.50 3118.50

g 6 th
Floor 2970.00 2970.00 0.00 2970.00 6.00% 178.20 3148.20 3148.20

h 7th & Above Floors 2970.00 2970.00 0.00 2970.00 7.00% 207.90 3177.90 3177.90

29 Kitchen Ota of Kadappa

a Ground /Stilt Floor 2655.00 0.02 9.90 2655 0.00 2655.00 0.00% 0.00 2655.00 2655.00

b First Floor 2655.00 0.02 9.90 2655 0.00 2655.00 1.00% 26.55 2681.55 2681.55

c 2nd Floor 2655.00 0.02 9.90 2655 0.00 2655.00 2.00% 53.10 2708.10 2708.10

d 3rd Floor 17 / 12 BDM 2655.00 0.02 9.90 2655 0.00 2655.00 3.00% 79.65 2734.65 2734.65
96 35
e 4th Floor 2655.00 0.02 9.90 2655 0.00 2655.00 4.00% 106.20 2761.20 2761.20

f 5th Floor 2655.00 0.02 9.90 2655 0.00 2655.00 5.00% 132.75 2787.75 2787.75

g 6 th
Floor 2655.00 0.02 9.90 2655 0.00 2655.00 6.00% 159.30 2814.30 2814.30

h 7th & Above Floors 2655.00 0.02 9.90 2655 0.00 2655.00 7.00% 185.85 2840.85 2840.85

30 SS Sink

a Ground /Stilt Floor 8992.00 8992 0.00 8992.00 0.00% 0.00 8992.00 8992.00

b First Floor 8992.00 8992 0.00 8992.00 1.00% 89.92 9081.92 9081.92

c 2nd Floor 8992.00 8992 0.00 8992.00 2.00% 179.84 9171.84 9171.84

d 3rd Floor 8992.00 8992 0.00 8992.00 3.00% 269.76 9261.76 9261.76
168 48 / 20 BDV 4
e 4th Floor 8992.00 8992 0.00 8992.00 4.00% 359.68 9351.68 9351.68

f 5th Floor 8992.00 8992 0.00 8992.00 5.00% 449.60 9441.60 9441.60

g 6th Floor 8992.00 8992 0.00 8992.00 6.00% 539.52 9531.52 9531.52

h 7th & Above Floors 8992.00 8992 0.00 8992.00 7.00% 629.44 9621.44 9621.44

31 Oil Bound Distemper with Primer

a Ground /Stilt Floor 54.00 54.00 0.00 54.00 0.00% 0.00 54.00 54.00

b First Floor 54.00 54.00 0.00 54.00 1.00% 0.54 54.54 54.54

111+108 5b/15+13/14
Excavated
Sand lead = 25 km Crush Sand lead Metal lead = 12Km Rock/Soling Add
DSR 2016-17 494.81 =494.81 / = 12km. ( 310.53 ) 12km. ( 310.53 ) = Stone Lead = Total Lift Labour
Item No. Short Description Of Item cum = 310.53/ cum 310.53/ cum 12Km = 379.90 = (5+7+9+11 Add 0% Total Total
Cess @
Total
379.90/Cum (14+15) (16+17) (18+19)
+13) 1% Over
18
P. No. Item No. Basic Rate Constant Amount Constant Amount Constant Amount Constant Amount 17

c 2 Floor
nd
54.00 54.00 0.00 54.00 2.00% 1.08 55.08 55.08

d 3rd Floor 54.00 54.00 0.00 54.00 3.00% 1.62 55.62 55.62
111+108 5b/15+13/14
e 4th Floor 54.00 54.00 0.00 54.00 4.00% 2.16 56.16 56.16

f 5th Floor 54.00 54.00 0.00 54.00 5.00% 2.70 56.70 56.70

g 6th Floor 54.00 54.00 0.00 54.00 6.00% 3.24 57.24 57.24

h 7th & Above Floors 54.00 54.00 0.00 54.00 7.00% 3.78 57.78 57.78

32 Apex Paint

a Ground /Stilt Floor 160.00 160.00 0.00 160.00 0.00% 0.00 160.00 160.00

b First Floor 160.00 160.00 0.00 160.00 1.00% 1.60 161.60 161.60

c 2 Floor
nd
160.00 160.00 0.00 160.00 2.00% 3.20 163.20 163.20

d 3rd Floor 160.00 160.00 0.00 160.00 3.00% 4.80 164.80 164.80
17 / 14
108
BDO
e 4th Floor 160.00 160.00 0.00 160.00 4.00% 6.40 166.40 166.40

f 5th Floor 160.00 160.00 0.00 160.00 5.00% 8.00 168.00 168.00

g 6 th
Floor 160.00 160.00 0.00 160.00 6.00% 9.60 169.60 169.60

h 7 & Above Floors


th
160.00 160.00 0.00 160.00 7.00% 11.20 171.20 171.20

33 White Wash

a Ground /Stilt Floor 7.50 7.50 0.00 7.50 0.00% 0.00 7.50 7.50

b First Floor 7.50 7.50 0.00 7.50 1.00% 0.08 7.58 7.58

c 2 Floor
nd
7.50 7.50 0.00 7.50 2.00% 0.15 7.65 7.65
1b/15
110
BDP 1A
Excavated
Sand lead = 25 km Crush Sand lead Metal lead = 12Km Rock/Soling Add
DSR 2016-17 494.81 =494.81 / = 12km. ( 310.53 ) 12km. ( 310.53 ) = Stone Lead = Total Lift Labour
Item No. Short Description Of Item cum = 310.53/ cum 310.53/ cum 12Km = 379.90 = (5+7+9+11 Add 0% Total Total
Cess @
Total
379.90/Cum (14+15) (16+17) (18+19)
+13) 1% Over
18
P. No. Item No. Basic Rate Constant Amount Constant Amount Constant Amount Constant Amount 17

d 3 Floor
rd 1b/15 7.50 7.50 0.00 7.50 3.00% 0.23 7.73 7.73
110
BDP 1A
e 4th Floor 7.50 7.50 0.00 7.50 4.00% 0.30 7.80 7.80

f 5th Floor 7.50 7.50 0.00 7.50 5.00% 0.38 7.88 7.88

g 6th Floor 7.50 7.50 0.00 7.50 6.00% 0.45 7.95 7.95

h 7th & Above Floors 7.50 7.50 0.00 7.50 7.00% 0.53 8.03 8.03

34 Brass Number Plate M-RA 0.00 #REF!

35 Steel Ladder

a 7th & Above Floors 155 11 /20 BDV 19 816.00 816.00 0.00 816.00 7.00% 57.12 873.12 873.12

36 Granite Frame/dado

a Ground /Stilt Floor 4070.00 0.022 10.89 4080.89 0.00 4080.89 0.00% 0.00 4080.89 4080.89
b First Floor 4070.00 0.022 10.89 4080.89 0.00 4080.89 1.00% 40.70 4121.59 4121.59
c 2nd Floor 4070.00 0.022 10.89 4080.89 0.00 4080.89 2.00% 81.40 4162.29 4162.29
d 3rd Floor 29 / 12 4070.00 0.022 10.89 4080.89 0.00 4080.89 3.00% 122.10 4202.99 4202.99
102
e 4th Floor BDM 4070.00 0.022 10.89 4080.89 0.00 4080.89 4.00% 162.80 4243.69 4243.69
f 5th Floor 4070.00 0.022 10.89 4080.89 0.00 4080.89 5.00% 203.50 4284.39 4284.39
g 6th Floor 4070.00 0.022 10.89 4080.89 0.00 4080.89 6.00% 244.20 4325.09 4325.09
h 7th & Above Floors 4070.00 0.022 10.89 4080.89 0.00 4080.89 7.00% 284.90 4365.79 4365.79

37 P/F 90 X 60 cm, Marble year Plate

a Ground /Stilt Floor 179 6a/ 21BDW 7 8100.00 8100.00 0.00 8100.00 0.00% 0.00 8100.00 8100.00

Providing & Fixing Letter Box as directed by


38 M-RA 0.00 0.00 #REF!
Engineer In charge

39 Chicken Mesh

16 / 11 BDL
a At All Floors 88 80.00 80.00 0.00 80.00 0.00% 0.00 80.00 80.00

40 Fan Hooks

a Ground /Stilt Floor 280.00 280.00 0.00 280.00 0.00% 0.00 280.00 280.00

b First Floor 280.00 280.00 0.00 280.00 1.00% 2.80 282.80 282.80

c 2nd Floor 280.00 280.00 0.00 280.00 2.00% 5.60 285.60 285.60
11 A / 5 BDF
61
d 3 Floor
rd
280.00 280.00 0.00 280.00 3.00% 8.40 288.40 288.40
e 4th Floor 280.00 280.00 0.00 280.00 4.00% 11.20 291.20 291.20
f 5th Floor 280.00 280.00 0.00 280.00 5.00% 14.00 294.00 294.00
Excavated
Sand lead = 25 km Crush Sand lead Metal lead = 12Km Rock/Soling Add
11 A 2016-17
DSR / 5 BDF 494.81 =494.81 / = 12km. ( 310.53 ) 12km. ( 310.53 ) = Stone Lead = Lift
61 Total Labour
Item No. Short Description Of Item cum = 310.53/ cum 310.53/ cum 12Km = 379.90 = (5+7+9+11 Add 0% Total Total
Cess @
Total
379.90/Cum (14+15) (16+17) (18+19)
+13) 1% Over
18
P. No. Item No. Basic Rate Constant Amount Constant Amount Constant Amount Constant Amount 17

g 6 th
Floor 280.00 280.00 0.00 280.00 6.00% 16.80 296.80 296.80
h 7th & Above Floors 280.00 280.00 0.00 280.00 7.00% 19.60 299.60 299.60

Deputy Engineer Executive Engineer - I


Pune housing & area Dev Board, Pune Pune housing & area Dev Board, Pune
Labour
Per unit
Rate

21

cum. 52.00

cum. 80.00

cum. 260.00

cum.

cum. 72.00

Hour 94.00

Hour 94.00

Hour 94.00

cum. 176.00

cum. 3550.00

cum. 851.00

cum. 1505.00

cum. 1905.00

cum. 2915.00
Labour
Per unit
Rate

M.T. 8550.00

cum. 900.00

sq m 138.00

sq m 160.00

sq m 151.00

sq m 156.00
Labour
Per unit
Rate

cum. 1505.00

cum.

cum.

cum.

cum.

cum.

cum.

cum.

cum. 1905.00

cum.

cum.

cum.

cum.

cum.

cum.

cum.

cum. 2085.00

cum.

cum.

cum.

cum.

cum.

cum.

cum.
Labour
Per unit
Rate

cum. 2085.00

cum.

cum.

cum.

cum.

cum.

cum.

cum.

cum. 2915.00

cum.

cum.

cum.

cum.

cum.

cum.

cum.

M.T. 8550.00

M.T.

M.T.

M.T.

M.T.

M.T.

M.T.

M.T.
Labour
Per unit
Rate

cum. 900.00

cum.

cum.

cum.

cum.

cum.

cum.

cum.

sq m 100.00

sq m

sq m

sq m

sq m

sq m

sq m

sq m

sq m 122.00

sq m

sq m

sq m

sq m

sq m

sq m

sq m

sq m 138.00

sq m
Labour
Per unit
Rate

sq m

sq m

sq m

sq m

sq m

sq m

sq m 249.00

sq m

sq m

sq m

sq m

sq m

sq m

sq m

sq m 108.00

sq m

sq m

sq m

sq m

sq m

sq m

sq m

R mt
R mt
R mt
R mt
R mt
R mt
R mt
R mt

sq m 145.00

sq m
Labour
Per unit
Rate

sq m

sq m

sq m

sq m

sq m

sq m
Labour
Per unit
Rate

Sq m 320.00

Sq m

Sq m

Sq m

Sq m

Sq m

Sq m

Sq m

sq m 124.00

sq m

sq m

sq m

sq m

sq m

sq m

sq m

sq m 510.00

sq m

sq m

sq m

sq m

sq m

sq m

sq m

sq m 300.00

sq m

sq m

sq m

sq m

sq m

sq m

sq m

sq m 210.00
Labour
Per unit
Rate

sq m

sq m

sq m

sq m

sq m

sq m

sq m

sq m 290.00

sq m

sq m

sq m

sq m

sq m

sq m

sq m

sq m 178.00

sq m

sq m

sq m

sq m

sq m

sq m

sq m

sq m 182.00

sq m

sq m

sq m

sq m

sq m

sq m
Labour
Per unit
Rate

sq m

Sq m 164.00

Sq m 473.67
Sq m
Sq m
Sq m
Sq m
Sq m
Sq m
Sq m

Sq m 440.97
Sq m
Sq m
Sq m
Sq m
Sq m
Sq m
Sq m

Sq m 467.86
Sq m
Sq m
Sq m
Sq m
Sq m
Sq m
Sq m

sq m 1632.00

sq m

sq m
Labour
Per unit
Rate

sq m

sq m

sq m

sq m

sq m

sq m 220.00

sq m

sq m

sq m

sq m

sq m

sq m

sq m

R mt 910.00

R mt

R mt

R mt

R mt

R mt

R mt

R mt

No 1530.00

No

No

No

No

No

No

No

sq m 17.00

sq m
Labour
Per unit
Rate

sq m

sq m

sq m

sq m

sq m

sq m

sq m 90.00

sq m

sq m

sq m

sq m

sq m

sq m

sq m

sq m 5.00

sq m

sq m
Labour
Per unit
Rate

sq m

sq m

sq m

sq m

sq m

Nos

R mt 285.00

sq m 595.00

sq m
sq m
sq m
sq m
sq m
sq m
sq m

No 215.00

No

sq m 27.00

No 15.00

No

No

No
No
No
Labour
Per unit
Rate

No
No