You are on page 1of 2

TRANSPORTATION COST BREAKDOWN Date: 7/4/17

Name: Ponsaran, Nel Christopher B.


Position: Jr. Cost Engineer

Due to our compliance of encoding our cost estimates to the DPWH intra-net database, I, Nel Christopher B.
Ponsaran, Jr. Cost Engineer, is assigned to encode Malabon-Tullahan River improvement estimates.

Inclusive dates: 07/4-4/17

MODE OF
DESTINATION TRANSPORTATION
WCI Office TO Anonas (LRT line 2 Station) Jeepney
Anonas (LRT line 2 Station) TO Recto (LRT line 2 Station) LRT line 2
Recto (LRT line 2 Station) TO Doroteo Jose (LRT line 1 Station) walking
Doroteo Jose (LRT line 1 Station) TO Pedro Gil (LRT line 1 Station) LRT line 1
Pedro Gil (LRT line 1 Station) TO Anda circle Jeepney
Anda circle TO DPWH UPMO 2nd street Tricycle (Special)
DPWH UPMO 2nd street TO Anda circle Tricycle (Special)
Anda circle TO Pedro Gil (LRT line 1 Station) Jeepney
Pedro Gil (LRT line 1 Station) TO Doroteo Jose (LRT line 1 Station) LRT line 1
Doroteo Jose (LRT line 1 Station) TO Recto (LRT line 2 Station) walking
Recto (LRT line 2 Station) TO Anonas (LRT line 2 Station) LRT line 2
Anonas (LRT line 2 Station) TO WCI Office Jeepney
TOTAL=
Two-way transportation cost for 1-day

Amount to be reimbursed: 212.00

Total (two-way trip cost) x no. of trips 212 x 1 212.00

NEL CHRISTOPHER B. PONSARAN


Employee
Date: 7/4/17

, I, Nel Christopher B.
t estimates.

FARE

8.00
25.00
-
15.00
8.00
50.00
50.00
8.00
15.00
-
25.00
8.00
212.00

You might also like