MOM WITH WENFENG AND LAI

PLANT VISIT ON 15/06/17

WENFENG Lohia Auto Ind.


Varoon Narang DGM MKTG Shomir Lal
Wang Xiaojie Chief Engineer Venkat
Zhang Yiling GM manufacturing
Felix Yu DGM Admn.

(Also Met Liu Peng MD and discussed future plans and probable buisness opportunity)

POINTS
Wenfeng is asking for the following 3 option as approach points.
1 Check list will be shared by Wenfeng.
2 LAI will revret to the Checklist by
3 Wenfeng asked for LAI design if any, which LAI has negated
4 If any product in Alloy wheel is ava. With LAI , it is required for refrence. LAI has negated
5 The initial drg shared by LAI is only for reference and not to be considered for any development activity
6 LAI propsed that if any samples matches our requirement, Wenfeng to provide that
7 Wenfeng mentioned point on the board that are attached. LAI will revrt with the requiement asap
8 The following TENTATIVE time line for development discussed

CHECKLIST
DESIGN
3D DATA
CUSTOMER APPROVAL
COMMERCIAL SETTLEMENT
DIE DESIGN
DIE MAKING
SAMPLE T 0
Head Materials
R&D

opportunity)

DATE

16/06/17
19/06/17

evelopment activity

quiement asap

16/06/17
24/06/17
1/7/2017
8/7/2017
18/07/17
25/07/17
15/08/17
30/08/17