Professional Documents
Culture Documents
Supplier Assessment Form New
Supplier Assessment Form New
Supplier Quality
Quality &
& Techinical
Techinical Assesment
Assesment
Guidelines
Guidelines for
for Conducting
Conducting Assessments
Assessments
The
TheSupplier
SupplierAssessment
Assessmentisisto
tobebeaaprocess
processassessment
assessmentandandshould
shouldaccurately
accuratelyreflect
reflectthe
theSupplier's
Supplier's
actual
actualmanufacturing
manufacturingand andquality
qualityprocesses,
processes,as
asevidenced
evidencedononthe
themanufacturing
manufacturingfloor.
floor.The
TheAssessment
Assessment
should
shouldvalidate
validatethat
thatthe
theday-to-day
day-to-dayoperations
operationscomply
complywith
withthe
therequirements
requirementsdetailed
detailedininthe
theAssessment.
Assessment.
ItItisisinsufficient
insufficientfor
foraaSupplier
Supplierto
tohave
havedocumented
documentedprocedures
proceduresonly.
only.
Recognizing
Recognizingthatthatsome
somesuppliers
suppliershave
havethe
thecapacity
capacityto
toprovide
providemultiple
multiplecommodities,
commodities,ititisisencouraged
encouragedthat
that
the
theappropriate
appropriatetechnical
technicalassessment
assessmentbebecompleted
completedininparallel
parallelwith
withthe
thequality
qualityassessment
assessmentportion.
portion.There
There
isisalso
alsoaa"Quick
"QuickAssessment"
Assessment"worksheet
worksheetthatthatcan
canbebecompleted
completedas aspart
partof
ofaageneral
generaloverview
overviewor orvisit
visitof
ofaa
supplier's
supplier'sfacility.
facility.Recognizing
Recognizingthat
thatthis
thisisisaavery
verygeneral
generaloverview
overviewonly,
only,aadetailed
detailedquality
qualityand
andtechnical
technical
assessment
assessmentshould
shouldalways
alwaysbebecompleted
completedprior
priorto
toaward
awardofofnew
newbusiness,
business,substantial
substantialincrease
increaseofofexisting
existing
business
businessororininresponse
responsetotopoor
poorsupplier
supplierperformance
performanceand/or
and/orelevated
elevatedrisk.
risk.
For
Foreach
eachaudit
auditsection,
section,the
therequired
requiredevidence/documentation
evidence/documentationisisdescribed
describedon onthe
theAssessment
AssessmentForm.
Form.The
The
Assessor
Assessorshould
shouldalso
alsouse
usethe
the"Observations
"Observations&&Notes"
Notes"field
fieldto
tohelp
helpclarify
clarifyand
andexplain
explaintheir
theirfindings.
findings.AA
"High",
"High","Medium"
"Medium"or or"Low"
"Low"Risk
Riskstatus
statuswill
willautomatically
automaticallybe
begenerated
generatedby bythe
thescore
scoreassigned
assignedtotoeach
each
element.
element.The
TheSummary
SummaryScore
Scorefor
foreach
eachparticular
particularelement
elementofofthe
theOperational/Quality
Operational/Qualityportion,
portion,will
will
automatically
automaticallybebereflected
reflectedon
onthe
theAudit
AuditCover
CoverPage
Pageand
andthe
thetotal
totalnumber
numberof ofhigh
highrisk
riskelements
elementswill
willbe
be
shown. The risk summaries for each Quick and Technical assessment completed, should
shown. The risk summaries for each Quick and Technical assessment completed, should be manually be manually
entered
enteredononthe
thecover
coverpage,
page,as
aswell.
well.
All
Allareas
areasassessed
assessedasasHigh
HighRisk
Riskmust
musthave
haveaadefined
definedCorrective
CorrectiveAction
ActionPlan
Plandetailed,
detailed,asaswell
wellas
asdates
dates
defined for completion, prior to award of any new business. Aside from the "High" risk
defined for completion, prior to award of any new business. Aside from the "High" risk elements, elements,
corrective
correctiveaction
actionshall
shallbe
beat
atthe
thediscretion
discretionof
ofthe
theAssessor.
Assessor.The
Thegoal
goalofofCorrective
CorrectiveAction
Actionisistotoeliminate
eliminateall
all
"High" risk elements in addition to attaining a minimum score of 80% for each audit
"High" risk elements in addition to attaining a minimum score of 80% for each audit section. Thesection. The
"Corrective
"CorrectiveAction
ActionPlan"
Plan"contained
containedwithin
withinthe
theAssessment
Assessmentfile,
file,shall
shallbebeused
usedtototrack
trackall
allcorrective
correctiveaction
action
activity.
activity.
Subsequent
Subsequentfollow-up
follow-upactivity,
activity,and
andsubsequent
subsequentAssessments
Assessmentsto tovalidate
validateimplementation
implementationofof
Corrective
Corrective Action, shall be the responsibility of the originating Magna Groupand
Action, shall be the responsibility of the originating Magna Group andSupplier
Supplier
Quality/Development
Quality/DevelopmentEngineer,
Engineer,andandmust
mustbebeinitiated
initiatedwith
withthe
theaward
awardofofbusiness,
business,at
atthe
the
latest. If the Assessing Group does not source business with the Supplier, development
latest. If the Assessing Group does not source business with the Supplier, development
activity
activityshall
shallbecome
becomethetheresponsibility
responsibilityof
ofthe
thesourcing
sourcingGroup/Division,
Group/Division,asasdefined
definedby
bytheir
their
Business Rules
Business Rules. .
ItItisisat
atthe
thediscretion
discretionof ofthe
theparticular
particularMagna
MagnaGroups
Groupsto
tobase
basesourcing
sourcingdecisions
decisionson onthe
thefinal
finalscore
score
attained.
attained. Each Groups' Business Rules shall define the selection criteria to be used. Theaim
Each Groups' Business Rules shall define the selection criteria to be used. The aimofofan
an
Assessment
Assessment is not simply the generation of a score. The ultimate aim is to identify and addressareas
is not simply the generation of a score. The ultimate aim is to identify and address areasof
of
systemic failure driving undue risk to our Groups and Divisions, and therefore proper
systemic failure driving undue risk to our Groups and Divisions, and therefore proper resolution and resolution and
360520998.xlsx
closure
closureof of"High"
"High"risk
riskitems,
items,isiscritical.
critical.
Assessment
Assessmentresults
resultsare
arefor
forsite-specific
site-specificmanufacturing
manufacturingfacilities.
facilities.IfIfaasupplier
supplierhas
hastwo
twoor
ormore
more
manufacturing locations, all locations require a separate Assessment.
DATE OF
SUPPLIER ASSESSMENT AUDIT:
REASON FOR/TYPE AUDIT QUALITY / DELIVERY ISSUES NEW BUSINESS QUICK ASSESSMENT
ANNUAL ASSESSMENT FOLLOW-UP ASSESSMENT TECHNICAL ASSESSMENT
TS 16949 CERTIFICATION ISO 9001:2000 CERTIFICATION VDA/Other CERTIFICATION ISO 14001 CERTIFICATION
Certification EXPIRY DATE Certification EXPIRY DATE Certification EXPIRY DATE Certification EXPIRY DATE
NO NO NO NO
MAGNA PLANTS
SUPPLIED:
80 1)
2)
60
3)
40
19
12
20
10
10
9
8
7
0 0 0 0 0 0 0 0 0 0
1)
2)
3)
No. ITEM 0
360520998.xlsx 3 of 108
Supplier Assessment Detailed
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is no curren
SUPPLIER ASSESSMENT FORM 2. If a particular element is currently "N/A" but there is the potential of future risk
No formal process
Does the organization have a process, charter or Unaware of requirements
9 system to ensure the presence of acceptable global
working conditions in all its operations?
360520998.xlsx 4 of 108
Supplier Assessment Detailed
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is no curren
SUPPLIER ASSESSMENT FORM 2. If a particular element is currently "N/A" but there is the potential of future risk
No. ITEM 0
360520998.xlsx 5 of 108
Supplier Assessment Detailed
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is no curren
SUPPLIER ASSESSMENT FORM 2. If a particular element is currently "N/A" but there is the potential of future risk
360520998.xlsx 6 of 108
Supplier Assessment Detailed
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is no curren
SUPPLIER ASSESSMENT FORM 2. If a particular element is currently "N/A" but there is the potential of future risk
Are Work Instructions for all employees affecting No work or operator instructions posted, or
15 product quality, including for repair and re-work significant lack of instructions
operations available and posted?
No start up procedures defines
No evidence of start up controls - such as first-
Are controls in place to verify process start up and job piece, containment etc.
16
change-over?
360520998.xlsx 7 of 108
Supplier Assessment Detailed
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is no curren
SUPPLIER ASSESSMENT FORM 2. If a particular element is currently "N/A" but there is the potential of future risk
360520998.xlsx 8 of 108
Supplier Assessment Detailed
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is no curren
SUPPLIER ASSESSMENT FORM 2. If a particular element is currently "N/A" but there is the potential of future risk
Quality
High Risk
No. ITEM 0
Is this Supplier ISO or TS registered ? Are they current Supplier has no certifications at present
with their surveillance audit schedule?
1
Is this Supplier current to their internal audit schedule No formal internal schedule of review
including corrective actions for all findings?
2
Does this Supplier have a process / system in place to Multiple examples of posted documents not current
3 ensure that all product documentation reflects the to revision level for selected part(s)
current revision level?
Noticeable lack of formal process
Focus only on external issues
Multiple open issues and/or late responses
Does the Supplier have an effective Problem Resolution No cross-functional approach
4 process? Does the system address customer and
internal issues?
Does this Supplier have a process / system to identify Suspect material not clearly identified
and segregate non-conforming material at each phase Suspect material at production cells, with high
of the production process? potential for mix
5 Lack of effective containment process
360520998.xlsx 9 of 108
Supplier Assessment Detailed
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is no curren
SUPPLIER ASSESSMENT FORM 2. If a particular element is currently "N/A" but there is the potential of future risk
Lack of instructions
Are Operators trained and qualified for any required Lack of operator training documentation
measurement and tests, including use of appropriate Missing, or no SPC where required
7 statistical techniques? Are there posted instructions
detailing inspection, test, SPC, work requirements and
re-work instructions at every station?
Are all inspection gauges and fixtures stored in a Evidence of gages/fixtures inappropriately stored
8 manner that protects them from environmental and / or and/or susceptible to damage
handling / storage damage? No designated storage
Does the supplier have sufficient internal capability and Significant lack of internal capability
equipment to ensure customer performance and High reliance on external sources
9 specification criteria can be met?
Does this Supplier have a process / system to measure No formal system in place
and track external quality performance with their
customers?
10
Does the supplier have a record retention process that No formal document retention system
ensures all necessary test, inspection and safety critical
records are retained for period as defined by the
11 Customer?
360520998.xlsx 10 of 108
Supplier Assessment Detailed
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is no curren
SUPPLIER ASSESSMENT FORM 2. If a particular element is currently "N/A" but there is the potential of future risk
Has this Supplier identified all of the special processes No, or minimal control over out-sourced processes
that will be required? Will any of these special
12 processes require outsourcing? Are additional controls
in place to manage outsources services?
360520998.xlsx 11 of 108
Supplier Assessment Detailed
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is no curren
SUPPLIER ASSESSMENT FORM 2. If a particular element is currently "N/A" but there is the potential of future risk
No. ITEM 0
Does the supplier have a formal process to plan Poor inventory management system
material flow into and through the plant? Are materials No apparent flow to material movement
and components stored, packaged and transported so High risk of damage to materials & components
as to protect them from dirt and damage?
2
Does this Supplier have a material lot traceability No, or very minimal traceability evident
system?
3
Does the supplier have a system / process to validate No verification of materials prior to shipping
the contents, label accuracy, and quantities of all
containers shipped?
4
360520998.xlsx 12 of 108
Supplier Assessment Detailed
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is no curren
SUPPLIER ASSESSMENT FORM 2. If a particular element is currently "N/A" but there is the potential of future risk
Is there a process to manage the material ordering No apparent link between customer orders and
activity to ensure an adequate supply of raw material / orders/receipts of purchased materials
lower level components are available to meet
production requirements? Are all delivered and/or
5
surplus materials stored in packaging and conditions so
as to prevent damage or mix?
Does this Supplier have processes / systems in place to No evidence of min/max values set
confirm and manage inventory levels? No regular cycle or inventory counts
6
Does the supplier utilize off-site warehouses? If so, is Off-site warehouses used
inventory tracked? Are cycle counts conducted? No visible controls in place
7
Is the supplier capable of meeting AIAG labeling AIAG labelling requirements not being met
requirements as defined in Supplier Guidelines?
8
Does the Supplier utilize Advanced Shipping Notice's Supplier does not issue ASN on regular basis, or
(ASN's)? Does the supplier verify the ASN to the Bill of issues in excess of 30 minutes prior to shipment
9 Lading, and the customers order?
C-TPAT and PIP Security Compliance Program Supplier completely unaware of requirements
10
360520998.xlsx 13 of 108
Supplier Assessment Detailed
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is no curren
SUPPLIER ASSESSMENT FORM 2. If a particular element is currently "N/A" but there is the potential of future risk
No. ITEM 0
Does this supplier have a process / system to recertify No formal process or procedure in place
a tool after repair but before production is scheduled?
1
Does the supplier have a tooling database to track and No database or formal tracking system for tools
manage tooling?
Is all Tooling being stored in a location that is protected Lack of designated storage for tooling
from environmental / handling damage?
3
Is there a system to track new tooling on order to No formal review process in place
support Customer schedules and targeted
5 implementation dates?
360520998.xlsx 14 of 108
Supplier Assessment Detailed
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is no curren
SUPPLIER ASSESSMENT FORM 2. If a particular element is currently "N/A" but there is the potential of future risk
Does the supplier have a formal Preventive No formal preventive maintenance plan in place
Maintenance management system at this facility? Does
it include all production equipment, Tooling and
6 supporting fixtures? Can it track specific Tools? Is
maintenance completed per schedule?
360520998.xlsx 15 of 108
Supplier Assessment Detailed
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is no curren
SUPPLIER ASSESSMENT FORM 2. If a particular element is currently "N/A" but there is the potential of future risk
No. ITEM 0
Does Magna face undue risk by entering / increasing Supplier is a direct competitor to Magna, with
2 business with this Supplier as a result of the share of same OE Customer base
business they do with other OEMs?
Does this Supplier have a process / system to track and No system in place to track quote response
manage RFQ's to ensure that quotes are submitted by No system to ensure cross-functional review
3 the requested due date?
Is this Supplier's facility owned or leased? Is it Inadequate coverage for damage or loss
adequately protected from catastrophic loss due to Fire, No coverage on customer owned tooling or
6 Flood, etc? Does the insurance coverage include equipment
customer owned goods and/or equipment?
Does the Supplier have access to required Magna No knowledge of websites or available resources
7 websites? Does the supplier understand what
information is available on applicable websites?
360520998.xlsx 16 of 108
Supplier Assessment Detailed
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is no curren
SUPPLIER ASSESSMENT FORM 2. If a particular element is currently "N/A" but there is the potential of future risk
Does this Supplier have a process / procedure for the No formal procedure for selection of suppliers
selection, qualification, approval, and management of No, or minimal tracking of supplier performance
their supply base?
8
Does this Supplier have a process / system in place to No formal system in place
disqualify their suppliers based on performance? Supplier performance not monitored or,
No reaction to poor supplier performance
9
NAFTA and Customs Compliance process No internal resources with appropriate knowledge
of NAFTA
10
360520998.xlsx 17 of 108
Supplier Assessment Detailed
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is no curren
SUPPLIER ASSESSMENT FORM 2. If a particular element is currently "N/A" but there is the potential of future risk
No. ITEM 0
Does this Supplier have a formal capacity plan and Supplier has no formal capacity review or planning
analysis methodology? Is it being used, are reports available
current?
2
Does this Supplier have a process / system to track and No formal process to track scheduled or
manage scheduled and unscheduled downtime for this unscheduled downtime
facility?
3
Does this Supplier have documented / published No formal process in place to track performance of
performance goals, Key Performance Metrics, for this key measurables and drive improvement
4 facility? How is the supplier performing to these goals?
360520998.xlsx 18 of 108
Supplier Assessment Detailed
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is no curren
SUPPLIER ASSESSMENT FORM 2. If a particular element is currently "N/A" but there is the potential of future risk
Does this Supplier have an up-to-date plant layout that No layout or mapping of production flow, available
shows current product flow?
5
Does this Supplier have a process / system in place to No formal training program
train new employees?
360520998.xlsx 19 of 108
Supplier Assessment Detailed
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is no curren
SUPPLIER ASSESSMENT FORM 2. If a particular element is currently "N/A" but there is the potential of future risk
Engineering
High Risk
No. ITEM 0
Does this Supplier have the latest Customer drawings No formal tracking system in place
and specifications for all parts in the program? Does the Informal system in place but high potential for
system ensure drawing/specifications are at the latest obsolete drawings/specifications in the system
1 level?
Is the electronic design program (software) used by the Supplier unable to communicate engineering data,
supplier (with design / Tool design responsibilities) internally
3 appropriate and compatible with Magna systems?
360520998.xlsx 20 of 108
Supplier Assessment Detailed
NOTES:
1. If a particular element is currently "N/A" (not applicable) and there is no curren
SUPPLIER ASSESSMENT FORM 2. If a particular element is currently "N/A" but there is the potential of future risk
Does this supplier have a system to manage and track No formal system in place, or informal system
Engineering Changes and Deviations? allowing high chance of error
360520998.xlsx 21 of 108
Supplier Assessment Detailed
N/A" (not applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" s
N/A" but there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section
Score
Moderate to High Risk Low to Moderate Risk
1 2
Job descriptions for all production functions Job descriptions for all levels of the organization
Evidence of training for production functions Evidence of training at all levels
360520998.xlsx 22 of 108
Supplier Assessment Detailed
N/A" (not applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" s
N/A" but there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section
Total High Risk elements for General Organization and Management Structu
360520998.xlsx 23 of 108
Supplier Assessment Detailed
N/A" (not applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" s
N/A" but there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section
Score
Moderate to High Risk Low to Moderate Risk
1 2
Documented procedure for program reviews Documented procedure for program reviews
some records of completed program reviews Records of completed program reviews
Inconsistent or no tracking of open issues Open issues tracked
No review of packaging unless driven by the Process to ensure review and approvel of
cusomer packaging
Limited or no internal knowledge/resources Sufficient internal knowledge/resources
Evidence of equipment validation prior to start of Evidence of equipment validation prior to start of
production production
No evidence or limited evidence of run at rate Evidence suggests run at rate conducted in most
studies to verify meeting capacity requirements situations, but lack of formal process
360520998.xlsx 24 of 108
Supplier Assessment Detailed
N/A" (not applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" s
N/A" but there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section
Evidence of some containment in place, but only Product containment plan is defined as part of
on a limited basis program launch process
Supplier only implements containment when Production control plans used - no pre-launch
directed by the Customer plans
Changes are tracked but lack formal system to Formal change management system in place
ensure documentation is updated, accordingly All changes assessed for impact on product and
Not all changes are officially managed system
All affected documentation updated
Heavy reliance on operators, but some focus on Significant focus on error prevention
automated error detection High use of mistake proofing in manufacturing
process
Process flow and manufacturing basically match, Process flow and manufacturing process match
but some out of sequence steps noted but inspection points out of sequence
Process Flow and Process Control Plan match, but Process Flow and Process Control Plan match and
no obvious link to FMEA's evident match to FMEA's
Risk numbers assigned on FMEA's, but no evident Risk numbers assigned on FMEA's
linkage to customer requirements Risk numbers linked to customer requirements
360520998.xlsx 25 of 108
Supplier Assessment Detailed
N/A" (not applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" s
N/A" but there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section
Evidence of improvements to mistake proofing, but Evidence of link between addition of mistake
no visible link to RPN's proofing and reduction plan for RPN's
Control plans identify required gauging, test Control plans identify required gauging, test
equipment and frequencies equipment and frequencies
Only minor exceptions noted No visible exceptions noted
Work instructions posted or available for operators Work instructions posted or readily available
No rework/repair instructions Repair/rework instructions posted or available
Instructions do not match level of Control Plans
Start up process defined Start up process defined
First-off samples available at all appropriate First-off samples available at all appropriate
operations - some exceptions noted operations - no exceptions noted
System in place to track Customer PPAP System in place to track Customer PPAP
submissions submissions
Evidence of some PPAP samples available Evidence of all PPAP samples available
360520998.xlsx 26 of 108
Supplier Assessment Detailed
N/A" (not applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" s
N/A" but there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section
360520998.xlsx 27 of 108
Supplier Assessment Detailed
N/A" (not applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" s
N/A" but there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section
Score
Moderate to High Risk Low to Moderate Risk
1 2
Supplier has minimum of ISO certification Supplier has all applicable certifications, including
Lacks TS/VDA certification ISO, TS, VDA, CQI - as applicable
Suspect material identified but not properly Suspect material clearly identified & segregated
segregated Effective containment process internally, at
Some evidence of containment in place suppliers and at customer(s)
Lack of or poor system to verify final disposition of No evidence of signatures detailing disposition
all suspect material and/or lack of secure containment area
360520998.xlsx 28 of 108
Supplier Assessment Detailed
N/A" (not applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" s
N/A" but there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section
Storage has been designated but is insufficient Adequate storage for gages/fixtures
Medium to high potential for damage Some, but minimal opportunity for damage
Sufficient resources to monitor most dimensional Internal resources can support dimensional and
and material specifications material requirements
Some reliance on external sources Some performance or specialty requirements are
sourced externally
Some customer performance measures in place System in place to track external quality
Some customers have no performance data All customers are tracked but, some customer
performance data not current
Some corrective actions not addressed in timely
manner
360520998.xlsx 29 of 108
Supplier Assessment Detailed
N/A" (not applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" s
N/A" but there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section
Sub-tier suppliers have at least partial evaluation Sub-tier suppliers evaluated prior to sourcing
prior to sourcing Performance of sub-tiers monitored regularly
No regular performance reviews No detailed records of review of requirements prior
to sourcing
360520998.xlsx 30 of 108
Supplier Assessment Detailed
N/A" (not applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" s
N/A" but there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section
Score
Moderate to High Risk Low to Moderate Risk
1 2
System in place to receive customer orders, but no System in place to receive and verify customer
verified back up system orders
No regular tracking of delivery performance Regular monitoring of delivery performance
Back up system for receiving orders but system is
not tested regularly
Material flow sufficient, from receiving through Good material flow throughout manufacturing
manufacturing and shipping facility - no apparent bottlenecks
Evidence ofsome material congestion in places Material identified at all stages of the process
No apparent FIFO System in place to monitor inventory levels
Potential for material damage Lacking evidence of effective FIFO
Traceability on finished product but lacking on raw Full material traceability on raw and finished
materials and components materials
Maximum period of traceability is >8 hours, or one
shift
Traceability indicated on shipping labels
Validation prior to shipping is limited to verification System in place to verify shipments, but limited to:
of part number, only - part number
- part quantity
360520998.xlsx 31 of 108
Supplier Assessment Detailed
N/A" (not applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" s
N/A" but there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section
Min and max values set on inventory Min and max values set on inventory
No inventory counts conducted on regular basis Inventory counts conducted on regular basis
AIAG standard met only when demanded by Labelling meets AIAG requirements
Customer All shipped material meets AIAG standard
Customer approval not obtained prior to shipping
Supplier almost always issues ASN but at times in Supplier issues ASN for all shipments
excess of 30 minutes prior to shipment ASN issued at maximum of 30 minutes prior to
shipment
Supplier notified of need to comply (by division) Supplier working on compliance with division
Minimal progress towards compliance Supplier on track with timing to achieve
compliance
360520998.xlsx 32 of 108
Supplier Assessment Detailed
N/A" (not applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" s
N/A" but there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section
Score
Moderate to High Risk Low to Moderate Risk
1 2
Documented system to qualify tool/fixture repairs Documented system to qualify tool/fixture repairs
No formal sign off procedure System ensures sign off by qualified personnel
Adequate tracking system for tooling Adequate tracking system for tooling
Missing asset tags on tools Customer ownership validated via asset tags
Tool maintenance records missing or not available Tool maintenance records maintained and
at all available for review
Documented system to track tooling orders Documented system to track tooling orders
Minimal evidence of customer updates Tooling tracked to implementation timeline
Evidence of customer updates
360520998.xlsx 33 of 108
Supplier Assessment Detailed
N/A" (not applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" s
N/A" but there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section
Supplier has knowledge of available capacity Supplier has knowledge of available capacity
Capacity forecast driven by high level factors such Evidence of current capacity studies on equipment
as floor space, total hours available
No detail on equipment capacity
360520998.xlsx 34 of 108
Supplier Assessment Detailed
N/A" (not applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" s
N/A" but there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section
Score
Moderate to High Risk Low to Moderate Risk
1 2
Supplier has full technical capability to support Supplier has full technical capability to support
Magna business Magna business
Magna represents >35% but <50% of supplier's Some secondary processing out-sourced
overall business Magna represents >35% but <50% of supplier's
overall business
Supplier is a direct competitor to Magna, but with Supplier is competitor with Magna, but with
different OE Customer base different technology and/or products
Cross functional team reviews quotes for feasibility Cross functional team reviews quotes for feasibility
No formal tracking system in place Formal tracking system in place
Some, but minimal knowledge of websites Full knowledge of Magna and/or Group website
Limited or no use of sites as directed by division
360520998.xlsx 35 of 108
Supplier Assessment Detailed
N/A" (not applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" s
N/A" but there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section
360520998.xlsx 36 of 108
Supplier Assessment Detailed
N/A" (not applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" s
N/A" but there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section
Score
Moderate to High Risk Low to Moderate Risk
1 2
Some areas of good housekeeping, but very Formal 5S program and review process in place
sporadic Majority of manufacturing area is clean and
Some risk to employees health & safety organized
Opportunity for improvement in office areas, or
shipping or warehouse areas
Minor risk to employee health & safety
No formal capacity review avaialbe Supplier has capacity planning as part of business
Supplier appears to have open manufacturing process
capacity available Capacity planning based on customer
requirements
360520998.xlsx 37 of 108
Supplier Assessment Detailed
N/A" (not applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" s
N/A" but there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section
Evidence of training for new employees Evidence of training program for new employees
Training includes health and safety training Training includes health and safety training
Training is sufficient to ensure job requirements Training is sufficient to ensure job requirements
can be met can be met
Evidence of cross-training
360520998.xlsx 38 of 108
Supplier Assessment Detailed
N/A" (not applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" s
N/A" but there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section
Score
Moderate to High Risk Low to Moderate Risk
1 2
Informal or manual system in place Formal system in place to track drawing and
System is fairly robust with minimal opportunity for specification levels
mistakes All appropriate documentation and control plans
reference latest drawings available
System in place to track validation requirements System in place to track validation requirements
Some validations completed as per schedule, but Validations completed as per requirement,
numerous validations delinquent including (but not limited to):
- PPAP
- FMVSS/Regulatory
- CQI
Supplier has system to communicate engineering Supplier has system to communicate engineering
data data
Majority of service is out sourced to a 3rd party Majority of communication is via interna systems
Portion of service is out sourced to a 3rd party
360520998.xlsx 39 of 108
Supplier Assessment Detailed
N/A" (not applicable) and there is no current risk to Magna, enter score of "3" for that element and add a note of explanantion in the "Notes" s
N/A" but there is the potential of future risk to Magna, enter score of "2" for that element and add a note of explanation in the "Notes" section
360520998.xlsx 40 of 108
Supplier Assessment Detailed
Negligible to No Risk
360520998.xlsx 41 of 108
Supplier Assessment Detailed
360520998.xlsx 42 of 108
Supplier Assessment Detailed
Negligible to No Risk
360520998.xlsx 43 of 108
Supplier Assessment Detailed
360520998.xlsx 44 of 108
Supplier Assessment Detailed
360520998.xlsx 45 of 108
Supplier Assessment Detailed
360520998.xlsx 46 of 108
Supplier Assessment Detailed
Negligible to No Risk
360520998.xlsx 47 of 108
Supplier Assessment Detailed
360520998.xlsx 48 of 108
Supplier Assessment Detailed
360520998.xlsx 49 of 108
Supplier Assessment Detailed
Negligible to No Risk
360520998.xlsx 50 of 108
Supplier Assessment Detailed
360520998.xlsx 51 of 108
Supplier Assessment Detailed
Negligible to No Risk
360520998.xlsx 52 of 108
Supplier Assessment Detailed
High
360520998.xlsx 53 of 108
Supplier Assessment Detailed
Negligible to No Risk
Facility is owned
Proof available to verify adequate insurance
Customer owned capital insured (Bailee Bond) High
360520998.xlsx 55 of 108
Supplier Assessment Detailed
Negligible to No Risk
360520998.xlsx 56 of 108
Supplier Assessment Detailed
360520998.xlsx 57 of 108
Supplier Assessment Detailed
Negligible to No Risk
360520998.xlsx 58 of 108
Supplier Assessment Detailed
360520998.xlsx 59 of 108
"H" - Observations indicate high risk - minimal standards, systems in place
QUICK ASSESSMENT "M" - Observations indicate moderate risk - standards/systems in place but improvement recommended
"L" - Observations indicate low/minimal risk - standards/systems appear robust and effective
Supplier has a detailed process to manage new programs and advance quality
planning
5 Advance Planning
There are sufficient resources in place to manage new program activity
There are regular reviews of status on all new programs
Indicate total number of elements per risk level, in summary on Cover Page
-Maintenance schedule for die cast and trim machines, cooling systems, shot
Evidence of proper Preventive
6 plunger, and furnaces are in evidence
Maintenance for equipment
- Check lists exist for regular equipment checks by skilled tradesman
Indicate total number of elements per risk level, in summary on Cover Page
EVIDENCE/ DOCUMENTATION
No. ITEM OBSERVATIONS/NOTES Score CORRECTIVE ACTION
REQUIRED
The Supplier has the proper type and - Number of machines can support capacity
volume of equipment to support - Type of machines used are appropriate for
1
current and quoted production dispensing of the subcomponents such as the
capacity. Resistors / Capacitors
EVIDENCE/ DOCUMENTATION
No. ITEM OBSERVATIONS/NOTES Score CORRECTIVE ACTION
REQUIRED
- All material specifications are available & known
- Lot numbers are controlled and traceable
- Boxes and drums are clean and sealed
Proper methods in place to control - Correct Set Up and adjustments - Paste
9
Soldering Paste other and raw material Temperature -Machine Temperature -Wiping
Frequency -Set up Procedure
Indicate total number of elements per risk level, in summary on Cover Page
-- Key Presence
APQP personnel
Documentation have inspection
of critical required
meets AIAG
- Plant Tier 2/3
Review is current
clean,
Supplier
EVIDENCE/ orderly
8DsPPAP forand well lit
completion
DOCUMENTATION
- knowledge
Goals
Job descriptions
equipment
Hydraulic
standard
Engineering
Records defined toChange
pressures
of perform
Auditsin thefor
are all
Business
job
levels of
monitored
Records Plan
forthetonnage,
No. ITEM - Evidence
Organization
5S
Posteddisciplines
Records
All information
CFTChart
ofofAdvance
Error-proofing
material are
specifications
to inwith
isplace
Quality
onresolve
line appropriate
arekey
Planning
availablewith
problems & known OBSERVATIONS/NOTES Score CORRECTIVE ACTION
-ejector
- and
-organization
requirements
Goals
Billet/bar
(e.g.
Engineering
Records
Approved
Review
Inspection
Audit
positions
reflect
CMM,
load. temperature
submitted
Schedule
Appropriate
current filled
REQUIRED
continuous
ofInstructions
packaging
Material
Early
software
based
machine
(including
PPAP controlled
Product
Tester
on plans
packages
(e.g.
areprocess
guarding
(hot/warm
etc.)
CATIA,
changed
Customer
forto reflect
requirements
Tier
Lot
Record
Poka 2/3of Suppliers
numbers
Yoke Customer
are controlled andand
Non-conformance safeties
traceableRatings)are&
reports
-process)
improvement
Sufficient
Training levellanguage
Records skills
(Including
to Certified
supportContract)
the
-- Containment
IGIS
In
Availability
Run-at-Rate
Warehouse
Program
accuracy
process
latest
(High
Resources
Evidence
Billet
Records
Boxes
Lock
status.
etc.)
CustomerReview
and
drawings
istoclean
ofofappear
boxes
and
or
completeness
3rdOEE
PPM,
communication
temperature
regular
Evidence
drums
Process
&
are
Party
orderly
Documents
adequate
is controlled
Failure
controlled
Supplier
for defects
of
areTracking
clean and
Flow
Modes
sessions
toLog.
fulfill
and
Audits and
sealed
Test
etc.)
all tasks
monitored
a. --Forgings
Customer
Tonnage
Minutes
Employee
Center
CAE,
Review
Packaging
Organization
Records
Facilities
PPAP
Evidence
Raw Moldofmonitored
and
training
Management
benches
documents
of
material ejector
Pre-Launch
of
ensures
flow,
Program
Chart defined
force
available
Stress
Control
Lessons-Learned
reflect
diameter and Review
protection &
showingmonitored
Review
for implemented
Analysis
Plans
latest
& TIR
of
to Meetings
Meetings
product
checks
level
controlled
hardness drive
foretc.
isLaps &
reviewed
-development
Established
Employee
evident
Application
Record of of Suggestion
plan
daily for
corrective succession
Program
verificationaction ofacross
error allproof
-improvement
Evidence
Cross-Training
Provision
Flash
Inspection/Test
resources offor
/material
under
Manufacturing Cost Matrix
24
fill ofhour
Quality
records
is Customer
monitored
Documents to Analysis
validate
at & Tracking
latest testing
level
b. -flats
NoRaw signs
applicable ofand certification
visible
similar pollution
productssheets
or spillsare reviewed
and -- support
Responses
Forgings to out of and
filed monitored specification
controlledconditions
for cracks,
The Supplier has adequate controls to
c. including end cracks
Raw material is color coded when received
1 assure quality and accuracy of
d. Verification of material chemistry, minimally
incoming material
quarterly
e. FIFO in place, material segregated by heats,
including WIP
a. Billet squareness
-- Presence
APQP Documentation / weight
of critical is controlled
inspection
meets AIAG
Material processing parameters are - Tier 2/3ofSupplier
6 b. Coating
equipment
standard billets is PPAP
controlled
controlled and monitored - All
Records of Advance
material Quality
specifications arePlanning
availablewith
& known
c. FIFO
--(e.g.
Review in
Billet/bar
Engineering
Records
Approved
CMM,place for
temperature
submitted
ofpackagingcoated
Material
Early
software
PPAP
Product material
controlled
Tester
plans
packages (hot/warm
(e.g. etc.)
CATIA,
for
- LotTier 2/3 Suppliers
numbers are controlled and traceable
process)
--Containment
IGIS
Availability
Run-at-Rate
Warehouse
Program
accuracy
etc.)Review
and
isto
clean
or
completeness
3rd
OEEProcess
&Party
orderly
Documents
Certified
Flow Test
- Records
Boxes and of drums
regularareSupplier Audits
clean and and
sealed
-- Tonnage
CAE,
Review
Packaging
Organization
Records
Facilities
Moldand ejector
Pre-Launch
of
ensures
flow,
Program
Chart force
Stress
protection
Control monitored
showing
Review
Analysis
Plans
of Meetings
product
etc.
development
a. Maintenance schedule for presses
Evidence of proper Preventive - Inspection/Test
b. resources
Ram alignment records to validate testing
Maintenance for equipment, error - Responses to out of specification conditions
7 c. Check valves, hydraulics
proofing, gaging, & supplementary
- Review
d. current
Check list 8Dsequipment
for regular for completion
checks
equipment - Engineering
e. Records
Adequateofof Audits
spare Change
part Records
inventory on hand
- Evidence
Error-proofingCFT to onresolve
line problems
- Audit
Inspection
Schedule
Instructions
based onare process
changed
requirements
to reflect
- Record
Poka Yokeof Customer Non-conformance reports &
latest Customer
(High level PPM, Failure Modes etc.)
- Lock
status.
boxes
Evidence
for defects
of Tracking Log.
Physical examination of equipment - Evidence
a. PPAP documents
No visibleof Lessons-Learned
reflect latesttolevel
drive
- Application
Record ofoil
of leaks
daily
corrective
verification
action of
across
errorallproof
8 supports overall effectiveness of - Manufacturing
improvement
b. Various gages, Documents
LED readouts,at latest level
applicable and similar products etc are working
equipment maintenance c. No questionable noises coming from equipment
-- Key personnel
Presence
APQP Documentation have inspection
of critical required
meets AIAG
- Plant Tier 2/3
Review is current
clean,
Supplier
EVIDENCE/ orderly
8DsPPAP forand well lit
completion
DOCUMENTATION
- knowledge
Goals
Job descriptions
equipment
Hydraulic
standard defined
Engineering
Records toChange
pressures
of perform
Auditsin thefor
are all
Business
job
levels of
monitored
Records Plan
forthe
tonnage,
No. ITEM - Evidence
Organization
5S
Posted
disciplines
Records
All information
CFTChart
ofofAdvance
Error-proofing
material are
specifications
to inwith
isplace
Quality
onresolve
line appropriate
arekey
Planning
availablewith
problems & known OBSERVATIONS/NOTES Score CORRECTIVE ACTION
-ejector
- and
-organization
requirements
Goals
Billet/bar
(e.g.
Inspection
Audit reflect
Engineering
Records
Approved
Review CMM,
load. temperature
submitted
Schedule
positions
Appropriate
current filled
REQUIRED
continuous
ofInstructions
packaging
Material
Early
software
based
machine
(including
PPAP controlled
Product
Tester
on plans
packages
(e.g.
areprocess
guarding
etc.)(hot/warm
CATIA,
changed
Customer
forto reflect
requirements
Tier
Lot
Record
Poka 2/3of Suppliers
numbers
Yoke Customer
are controlled andand
Non-conformance safeties
traceableRatings)
are&
reports
-process)
improvement
Sufficient
Traininglevellanguage
Records skills
(Including
to Certified
supportContract)
the
-- Containment
IGIS
In
Availability
Run-at-Rate
Warehouse
Program
accuracy
process
latest
(High etc.)
Customer
Resources
Evidence
Billet
Records
Boxes
Lock
status.
Review
and
drawings
isto
ofofappear
temperature
boxes
and
clean
or
completeness
3rdOEE
PPM,
communication
regular
Evidence
drums
Process
&
are
Party
orderly
Documents
adequate
is
for defects
of
controlled
Failure
controlled
Supplier
areTracking
clean and
Flow
Modes
sessions
toLog.
fulfill
and
Audits and
sealed
Test
etc.)
all tasks
monitored
a. --Forgings
Customer
Tonnage
Minutes
Employee
Center
CAE,
Review
Packaging
PPAP
Evidence ofmonitored
Organization
Records
Facilities
Mold and
training
benches
documents
Compression of Management
Pre-Launch
of ejector
ensures
flow,
Program
Chart defined
force
available
Stress Review
protection
Control
Lessons-Learned
Rings,reflect
and &
showingmonitored
Review
for implemented
Analysis
Plans
latest
Sleeves, TIR
of
to Meetings
Meetings
product
level
controlled checks
drive
etc. etc.
for
are Laps &
organized
-development
Established
Employee
evident
Application
Record of of Suggestion
plan
daily for
corrective succession
Program
verificationaction ofacross
error allproof
-improvement
Evidence
Cross-Training
Provision
Flash offor
Inspection/Test
resources
/ under
Manufacturing Cost Matrix
24
fill ofaccess
hour
Quality
records
is Customer
monitored
Documents to Analysis
validate
at & Tracking
latest testing
level
and -flats
Nostored
signs of
applicable for easy
visible
and similar pollution
products or spills
-- support
b.ToolingResponses
Forgings to out of
ismonitored
cleaned andspecification
and controlled
reviewed conditions
for each
after cracks,
run,
Supplier has adequate controls in including repair,
including end crackspolish, or replacement as required
9 place for storage and maintenance of c. Evidence of periodic checks for bell mouth
standard tooling condition at i.d. interface
d. Inventory levels maintained
e. Tools are properly identified with Customer I.D. if
applicable
a. Chemical Concentration
Phosphate Line parameters are
16 b. Tank Temperature
controlled
c. Submersion Time
-- Key personnel
Presence
APQP Documentation have inspection
of critical required
meets AIAG
- Plant Tier 2/3
Review is current
clean,
Supplier
EVIDENCE/ orderly
8DsPPAP forand well lit
completion
DOCUMENTATION
- knowledge
Goals
Job descriptions
equipment
Hydraulic
standard
Engineering
Records defined toChange
pressures
of perform
Auditsin thefor
are all
Business
job
levels of
monitored
Records Plan
forthe
tonnage,
No. ITEM - Evidence
Organization
5S
Posted
disciplines
Records
All information
CFTChart
ofofAdvance
Error-proofing
material are
specifications
to inwith
isplace
Quality
onresolve
line appropriate
arekey
Planning
availablewith
problems & known OBSERVATIONS/NOTES Score CORRECTIVE ACTION
-ejector
- and
-organization
requirements
Goals
Billet/bar
(e.g.
Engineering
Records
Approved
Review
Inspection
Audit reflect
CMM,
load. temperature
submitted
Schedule
positions
Appropriate
current filled
REQUIRED
continuous
ofInstructions
packaging
Material
Early
software
based
machine
(including
PPAP controlled
Product
Tester
on plans
packages
(e.g.
areprocess
guarding
(hot/warm
etc.)
CATIA,
changed
Customer
forto reflect
requirements
Tier
Lot
Record
Poka 2/3
numbersof Suppliers
Yoke Customer
are controlled andand
Non-conformance safeties
traceableRatings)
are&
reports
-process)
improvement
Sufficient
Training levellanguage
Records skills
(Including
to Certified
supportContract)
the
-- Containment
IGIS
In
Availability
Run-at-Rate
Warehouse
Program
accuracy
process
latest
(High etc.)
Resources
Evidence
Billet
Records
Boxes
Lock
status.
CustomerReview
and
drawings
istoclean
ofofappear
temperature
boxes
and
or
completeness
3rdOEE
PPM,
communication
regular
Evidence
drums
Process
&
are
Party
orderly
Documents
adequate
is controlled
Failure
controlled
Supplier
for defects
of
areTracking
clean and
Flow
Modes
sessions
toLog.
fulfill
and
Audits and
sealed
Test
etc.)
all tasks
monitored
--Forgings
Customer
Tonnage
Minutes
Employee
Center
CAE,
Review
Packaging
Organization
Records
Facilities
PPAP
EvidenceMold ofmonitored
and
training
documents
ofManagement
benches ejector
Pre-Launch
of
ensures
flow,
Program
Chart defined
force
available
Stress Review
protection
Control
Lessons-Learned
reflect
and &
showingmonitored
Review
for implemented
Analysis
Plans
latest TIR
of
to Meetings
Meetings
product
checks
level
controlled drive
foretc.
Laps &
-development
Established
Employee
evident
Application
Record of of Suggestion
plan
daily for
corrective succession
Program
verificationaction ofacross
error allproof
a. -improvement
Evidence
Cross-Training
Provision
Flash
Inspection/Test
resources offor
under
Manufacturing Cost
Billet /temperature Matrix
24
fill ofhour
Quality
records
is Customer
monitored
Documents
is to Analysis
validate
at
controlled & Tracking
andtesting
latest level
monitored
-flats
No signs ofand
applicable visible
similar pollution
products or spills
b. Forgingsmonitored
-- support
Responses
Forgings monitored
to out of and and controlled
specification
controlled forcracks,
Laps & flats
conditions
for
17 Warm Forge Specific c. Forgings
including endmonitored
cracks and controlled for cracks,
including end cracks
d. Lubrication sprayers working properly if applicable
The Supplier has Process Controls to a. CNC controls are used where applicable
ensure conformance to product design b. Equipment is capable of meeting design
3 -- Presence
APQP Documentation
tolerances of critical inspection
meets AIAG
and requirements - Tier 2/3 Supplier PPAP
- equipment
c. Hydraulic
standard pressures
Work holding are monitored
is adequate scopeforofwith
tonnage,
- Records of Advance Qualityfor
Planning work
Billet/bar
-ejector
-(e.g.
Engineering
Records
Approved
ReviewCMM,
load.temperature
submitted
ofpackaging
Material
Early
software
PPAP controlled
Product
Tester
plans
packages (hot/warm
(e.g. etc.)
CATIA,
for
Tier 2/3 Suppliers
-process)
- Containment
IGIS
In
Availability
Run-at-Rate
Warehouse
Program
accuracy
process
etc.)Review
and
drawings
isto
clean
or
completeness
3rd
OEE
Process
&are
Party
orderly
Documents
controlled
Certified
Flow Test
- Records of regular Supplier Audits and
Tonnage
-- Center
CAE,
Review
Packaging and
Organization
Records
Facilities
Mold
benches ejector
Pre-Launch
of
ensures
flow,
Program
Chart force
available
Stress
protection
Control
showingmonitored
Review
Evidence of proper Preventive a. Maintenance
development schedule forfor
Analysis
Plans
TIR
of Meetings
product
checks
equipment etc.
b.- Flash
Inspection/Test
resources
/ under fill records
Ram alignment is monitored
to validate testing
Maintenance for equipment, error - Responses to out of specification conditions
4 proofing, gaging, & supplementary c. Check valves, hydraulics
equipment d. Coolant and/or cutting fluids are kept at
appropriate concentration levels
Indicate total number of elements per risk level, in summary on Cover Page
EVIDENCE/ DOCUMENTATION
No. ITEM
REQUIRED
EVIDENCE/ DOCUMENTATION
No. ITEM
REQUIRED
- Mold machine pre-heat, auto-clave, cooling
parameters controlled
- Coating Robot Dipping and Draining routine
controlled
Critical cycling parameters are - Cluster insertion, and fill & compaction of molding
5
monitored and maintained media controlled
- Pouring routine - dip, drain, pour controlled
- Pressure solidification cycle controlled
- Heat treat parameters controlled
EVIDENCE/ DOCUMENTATION
No. ITEM
REQUIRED
- Coating mix-down procedures are evident
Proper methods in place to control - Molten metal preparation, cleaning, and pouring
9 required material mixing and are evident
processing - Cast line Molding media additions are controlled
OBSERVATIONS/NOTES Score
OBSERVATIONS/NOTES Score
OBSERVATIONS/NOTES Score
ate total number of elements per risk level, in summary on Cover Page
CORRECTIVE ACTION
CORRECTIVE ACTION
CORRECTIVE ACTION
EVIDENCE/ DOCUMENTATION
No. ITEM OBSERVATIONS/NOTES Score CORRECTIVE ACTION
REQUIRED
Are there adequate controls for
Confirm system for receiving inspection and
1 receiving inspection of incoming
identification of incoming material.
material.
What datum strategy would Confirm supplier datum scheme matches with
11 supplier require in order to process print requirements and datums selected on
the part in planned equipment assembly pallets
What datum strategy would Confirm supplier datum scheme matches with
13 supplier require in order to inspect print requirements and datums selected on
the part in planned equipment inspection fixtures (i.e. CMM/Gauges)
EVIDENCE/ DOCUMENTATION
No. ITEM OBSERVATIONS/NOTES Score CORRECTIVE ACTION
REQUIRED
Does Supplier equipment have
Review supplier controls to protect part from
fixturing to guarantee part presence
15 mis-loads and damage. (i.e.. Poke-Yokes,
and proper position during process.
clamping damage etc)
(no mis-load)
Review supplier work instructions or check
Does supplier identify and
16 sheets for identification of controlled process
document machine settings
parameters
Is Machine/fixture ID identified on
Review supplier controls for clear identification
each part for duplicate processes.
17 of parts from m/c to m/c and fixture to fixture
(i.e...two machines making same
(ie.traceability for any containment purposes)
part)
EVIDENCE/ DOCUMENTATION
No. ITEM OBSERVATIONS/NOTES Score CORRECTIVE ACTION
REQUIRED
Review supplier controls for protecting part from
rust (Applying rust inhibitor, protecting in
What controls supplier has to
28 packaging, shelf life for rust inhibitor, packaging
protect part from rust
mat'l will not escalate rust issues if part
touches)
What controls supplier has to Review if part requires special packaging /
29 protect part from damages on protective aids to prevent from damages in-
machine surfaces house and during transit
What are supplier plans to maintain Review supplier controls. Is there 100%
30 capability on critical dimensions inspection for critical dimensions and PTC's or
and PTC's? demonstrated process capability?
What are supplier controls for What are plans? Borescope, Ball check, flow
35
detecting blocked channels testing.
What are supplier controls for
detecting casting issues at Any planned receiving inspection? What
36 receiving and identified after features? Are there planned boundary samples,
machining (i.e. porosity, non-clean templates for porosity checking etc.)
up etc)
Indicate total number of elements per risk level, in summary on Cover Page
EVIDENCE/ DOCUMENTATION
No. ITEM OBSERVATIONS/NOTES Score CORRECTIVE ACTION
REQUIRED
EVIDENCE/ DOCUMENTATION
No. ITEM OBSERVATIONS/NOTES Score CORRECTIVE ACTION
REQUIRED
Sintering
EVIDENCE/ DOCUMENTATION
No. ITEM OBSERVATIONS/NOTES Score CORRECTIVE ACTION
REQUIRED
Indicate total number of elements per risk level, in summary on Cover Page
360520998.xlsx
"F" = Full Compliance/Evidence "P" = Partial Compliance/Evidence "N" = No Compliance/Evidence
Technical Assessment - Plastic Injection N/A = Not Applicable
Indicate total number of elements per risk level, in summary on Cover Page
360520998.xlsx
"F" = Full Compliance/Evidence "P" = Partial Compliance/Evidence "N" = No Compliance/Evidence
Technical Assessment - Screw Machining N/A = Not Applicable
The Supplier has the proper type and - Number of machines and spindle type can support
volume of equipment to support capacity
1
current and quoted production - Vertical or Horizontal turrets in use
capability. - Machines are fully automated, as appropriate
The Supplier has Process Controls to - Machine size is appropriate for product
3 ensure conformance to product design - Evidence of SPC Controls in use
and requirements - Bar diameter and size is appropriate for products
Indicate total number of elements per risk level, in summary on Cover Page
a. All rework processes are identified on P Flow, CP, FMEA & PPAP'd.
b. Standardized Work for all rework operations..
Secondary operations are c. Are all molding parameters clearly defined and available at presses?
5
controlled and monitored d. Is process for removing excess flash automated to insure consistency for
excess flash removal?
a. Compression Rings, Sleeves, etc. are organized and stored for easy access.
b.Tooling is cleaned and reviewed after each run, including repair, polish, or
Supplier has adequate controls
replacement as required.
9 in place for storage and
c. Evidence of periodic checks for bell mouth condition at i.d. interface.
maintenance of standard tooling
d. Inventory levels maintained.
e. Tools are properly identified with Customer I.D. if applicable.
a. Adequate number and skilled tool engineers onsite to support mfg. plant.
Supplier has adequate tool b. Design capability, including ability to translate math data (CATIA, UG, Pro-Eng
11
design capability etc.)
c. Adequate CAD licenses for scope or work.
a. Parameter control check list and follow up (pressure, humidity, speeds, density)
Wax, Oil or Borettite application b. Control charts available for critical features.
16
is controlled. c. Inspection methods according to the characteristic
d. Preventive maintenance plan for nozzles, pipes, heaters.
a. Solution ratio.
Bonding agent parameters are
18 b. Temperature.
controlled
c. Time.
EVIDENCE/ DOCUMENTATION
No. ITEM OBSERVATIONS/NOTES Score CORRECTIVE ACTION
REQUIRED
- Number of machines can support capacity.
The Supplier has the proper type and - Tonnage of machines is appropriate for product
volume of equipment to support
1
current and quoted production
capability.
Are nitrogen systems (self-contained) - All nitrogen systems must be part of a predictive
7 part of supplier predictive maintenance maintenance program (based on hits, not time) to
plan? ensure that no non-conforming product can be
produced as a result of low or excessive tonnage.
EVIDENCE/ DOCUMENTATION
No. ITEM OBSERVATIONS/NOTES Score CORRECTIVE ACTION
REQUIRED
- Stamping presses appear to be in good working
Physical examination of equipment order. There is no evidence of oil leaks on floor, etc.
8 supports overall effectiveness of
equipment maintenance
Do operator instructions and /or press Press set-up and/or operator instructions should
16 set-up instructions match production include shut height parameter, nitrogen system
parameters? pressure, counter balance pressure, feed rate and
total/per corner tonnage at a minimum. This will
insure consistent set-up from shift to shift, as well as
help in the troubleshooting process.
EVIDENCE/ DOCUMENTATION
No. ITEM OBSERVATIONS/NOTES Score CORRECTIVE ACTION
REQUIRED
Supplier shows evidence first piece reports are
What parameters are checked for placed at press, or are easily accessible for operator
17 startup (Dimensional, PLC, etc.). First review.
piece approval posted.
PLAN DO
Task Timing
Status No. Issue Description Actions Taken Responsibility Start Target
Date Date
Project name
Materials -
= 1Behind
= 2O.K.
= 3Completed
4
5
6
Quality -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Manufacturing -
1
2
3
4
5
6
= Behind
= O.K. Engineering -
= 1Completed
2
3
4
5
6
7
8
9
10
11
12
13
Magna PPM
300
250
200
150
100
50
0
40553 40585 40617 40649 40681 40713 40745 40777 40809
EET PDCA Update 06/21/10
me
g-
-
e Initiatives
Row 4
360520998.xlsx
11/01/2010-V11 02/18/2011-V12 Cover Union and CQI information added
Quality Added - Previous Sections redefined
Facilities/ Added - Previous Sections redefined
Tooling
Purchasing Added - Previous Sections redefined
Operations Added - Previous Sections redefined
Engineering Added - Previous Sections redefined
Quick Scoring method revised
Assessment
Detailed Scoring method revised
Quality Ass't.
Materials 14 C-TPAT & PIP requirements added
Purchasing 12 NAFTA/Customs requirements added
02/18/2011-V12 03/14/2011-V13 Formatting & printing settings improved
Corrective
03/14/2011-V13 04/15/2011-V14 Format changed to PDCA Tracker
Acition
04/15/2011-V14 05/04/2011-V15 All All Scoring method revised
Advance Q. 19 Revised
7 Revised
Materials 7 Revised
3 Revised
Operations 6 Added
Organization 4 Revised
6 Revised
7 Added
Purchasing 3 Revised
10 Added
Quality 3 Added
6 Revised
10 Revised
16 Added
05/04/2011-V15 09/30/2011-V16 Cover Supplier contact information added
Detailed
All Scoring method revised and descriptions added
Quality Ass't.
All "Notes" added to header of each section
360520998.xlsx
cription
to paragraphs 2, 5 & 6
cility added
Non-Conformance" and
Manufacturing Documents"
dded
d
ed)
rrent PPM
ths & Weaknesses
n added
straints added
g added
added
ed area" added
dded
labelling" added
ded
added
l control added
Site specific assessments
ssment Added
Assessment Added
ng Added
Assessment Added
QI Certification
QI Certification
ancial/Technical revised
sed - risk level added and
ded
ng assessment
emoved
added
ed
al Assessments added
and scoring added
360520998.xlsx
added
redefined
redefined
redefined
redefined
redefined
s added
ents added
ngs improved
Tracker
n added
d descriptions added
f each section
360520998.xlsx