Daily Points To Recall (Day 10) : Professional Training and Consultation
Daily Points To Recall (Day 10) : Professional Training and Consultation
3. Inspection frequency:
5. After the valve is removed from service, first action is to check its
relieving pressure (pop pressure) in the as received condition.
Subsequently, carry out detailed visual examination, dismantling,
cleaning, and lapping of valve seat. Set the pop at desired pressure
and confirm the same at least once. Carry out leak test.