You are on page 1of 1

mv "DUTCH SPEAR"

STOWAWAYS, DRUGS, SMUGGLING SEARCH CHECKLIST

Port of Results of searching:


Date & Time of
Commencement
Date & Time of CHIEF OFFICER
Completion

AREA 1. HOLD, CRANES AND ALL COMPARTMENTS AREA 3. ALL DECK COMPARTMENTS FROM THE
IN FRONT OF SUPERSTRUCTURE FORE LINE OF SUPERSTRUCTURE TO AFT
1.Cargo hold 1.Compass deck
2.Hatch coamings 2.Funnel top
3.Hold accesses 3.Funnel inside
4.Deck cargo 4.Air condition room
5.Cranes 5.Rescue boat
6.Paint locker 6.Welder room
7.Bosun store 7.Em. generator room
8.CO2 fore station 8.CO2 aft room
9.Bow thruster room 9.FFE aft locker

A/B TANOVITSKIY V. SECOND OFFICER ELKIN I.

A/B BONDARETS V. AREA 4. ALL COMPARTMENTS INSIDE


SUPERSTRUCTURE FROM THE BRIDGE TO
ENGINE
1.Galley/Stores/Messroom
2.Provision store
3.Locker
AREA 2. ALL COMPARTMENTS IN THE ENGINE ROOM 4.Changing room
1.Control room 5.Laundry
2.Lockers 6.Dispensary/Hospital
3.Steering room 7.Deck office
4.Bottom plates 8.Ship's toilets
5.Emergency escapes 9.Empty cabins
6.Workshop 10.Bridge

CHIEF ENGINEER DZYAZKO COOK ALIPA F.


V. A/B Oiller Rybak S.

You might also like