You are on page 1of 4

AVRO 146 RJ FCOM Chapler 2 TOC

Volume 3 Parl4 ICE PROTECTION Page 1

Chapter 2 - Ice Protection


Ground De-icing/Anti-icing Checklist ............................................................................. 1
Holdover TImes .......... ................................................................................................... 2

FCOM :V3P4 - 11 B AVRO 146-RJ100 EASA Nov 06/07


AVRO 146 RJ FCOM Chap1er 2
Volume 3 Parl4 ICE PROTECTION Page 1

Ground De-icingIAnti -icing Checklist


The ground de-icing/anti-icing checklist is given in Table 2.1.

Table 2.1 - Ground De-Icmg'AntHcmg ChecklIst


Before Oe-ic ingIAnti-icing Check
Cover/Blanks ............... II engines not running , fit to air data sensors and drain masts il
practicable
Doors ........................... Closed
BRAKE FANS .............. OFF
PACKS ........................ OFF
APU AIR ...................... OFF
ENG AIR ...................... OFF
Engines ........................ Not running or at ground idle
APU ............................. OFF if engines running
ENG ANT ICE .............. ON if required
FLAPS ......................... UP
External lights .............. As required
After De-icing/Anti-ic ing Check
Controls ....................... Full and free
APU ............................. As required
APU AIR ...................... OFF, check intake drains before use on next sector
ENG AIR ...................... OFF for at least one minute attar deicinglanti-icing completad
PACKS ........................ ON when air available
Tech Log ...................... Record time of application and type/mixture of fluid
BRAKE FANS .............. As required
External lights .............. As required
FLAPS ......................... Leave UP until entering runway and then select tho takeoff
setting

FCOM :V3P4- 11 B AVRO 146-RJ100 EASA Sep 30/11

You might also like