West Qurna I 000 509 F02201Q

Project Location: Basra, Iraq Rev. 0


Page 1 of 1

SURVEILLANCE REPORT
Location Subcontractor/Activity Date Completed Work Report No.
Produce Water109 DS7 CPECC / concrete pouring May.2017 Yes No SR AWQ0109 009

Inspection Checklist, Specification, Or Drawing Used As Reference:


wqsxsxWfdssdjbkiigQ-FT-NSPDS-00-040998887101_1

RESULTS: Follow-up Required Satisfactory


Description Of Item/Work Inspected/Observed:
Conducting crushing of concrete cubes test /Concrete Works/

Observations/Deficiency:
Regarding to IR CE-C 057794320 Witness to testing concrete cubes (compressive strength at 7 days) from
Sleeper footing (C35) in DS237 and the results were achieved failed values of compressive strength for all
cubes.ready to working with the elevationwhich refer in the drwig and give the same value of critacle point

Karim garib Ahmad issa

Surveillance Personnel/Date Site Quality Manager/Date

Person Notified Of Deficiency Amir zami alarbawi bechtel QA/QC mechanic


Name Title
Recommended Corrective Action:

Corrective Actions Implemented/Accepted:


Waiting the results of cylinder compressive strength test with age (28 days) and the results are passed

Surveillance Personnel/Date Site Quality Manager /Date

Attached
IRS
Result of samples