DAILY REPORT ON INTERNSHIP ACTIVITES CARRIED OUT AT

PAN OCEAN OIL CORPORATION (POOC) NIG. LTD. OVADE


OGHAREFE FACILITY
DATE: WEDNESDAY, 29TH MARCH 2017

PREPARED BY: IMEH, VICTOR OKON


DEPARTMENT OF ELECTRICAL/ELECTRONIC ENGINEERING
AFE BABALOLA UNIVERSITY

PROGRESS:
Introduced to the supervisor I would be working with Mr. Adeyinka(head of LPG-
Propane facility project)
Introduction to E & I department for Gas Processing Plant (GPP I)
Gas processing plant tour by Mr Ejiro from E & I department
Inlet gas section consisting of LP, IP & HP compressors
Identification of valves in the plant
Identification of various instruments present in the plant
Identification of PLC system
Introduction to activities carried out in control room by Mr Rukewe
Introduction to HMI system in control room
Introduction to process activity on the HMI
Controlling plant instruments and valves from the HMI

PROBLEMS:
No problems were encountered

PLANS:
Looking forward to learning from the E & I team.