You are on page 1of 2

N-267 Oct.

2000
Data Sheet for Medium Voltage Metal-Clad Switchgear
from 2.4 kV to 34.5 kV

Client PDVSA PETROJUNN Engineering Org. ABPI Spec. No.


Project title Adec. Sist. Gen. JunnSur Location Caracas Date 12/07/2017
Project location EDO. ANZOATEGUI Contract No. P17N123 Equip. No. SWGR-Outdoor
Project No P1B0071703 Specifier Name Tele. No
P.O. No.
Refer to PIP ELSSG02 for General Requirements
Applicable State and Local Codes:

Data Provided By: Buyer Seller With Proposal Seller After Order

Service Conditions (4): Power Circuit Breakers (8): (contd)


Altitude 120 m Seismic Zone Ground & Test Switch Required
Ambient Temperature: Max. 38.88 C Min. 20.55 C Description: Nota 1
Other
Rating & System Parameters (5): Main Bus Ratings (9.1):
Volts 13800 Phase 3 Hertz 60 1200 Amperes Silver-Plated Tin-Plated
Wye Delta Other: Barriers (9.3.3)
Fault Current 5 kA (RMS SYM) X/R Ratio No Yes
One-Line Dwg. No. P1B0071703-LCOD3-EP02001 Remote Control (10.2)
System Grounding: Required (Description Attached) Not Required
High Resistance Low Resistance Ungrounded CT Wire Color (10.3.2)
Ground Fault Current 400 Amperes Black Gray
Feeder Breaker Configuration (6.1.5): Differential CT Wire Color (10.3.10)
Red/Blue/Yellow Gray
One-High Two-High
Indicating Lights (10.7.1):
Enclosure (6.1):
Amber Purpose
Indoor Outdoor per ELSSG12
Other By Seller Purpose
Cable (6.2):
Heat Output Data:
Power Cable Entry: Top Bottom
_________________ BTU/HR For Entire Swgr. Line Up
Cable Lugs: By Buyer By Seller
Metering (10.7):
Control Cable Entry: Top Bottom
Microprocessor-Based Other: By Seller
Bus Duct (6.3)
Communication Reqd. Communication Not Reqd.
By Switchgear Seller By Others Not Required
RS 485 Other: Nota 1
Bus Duct Entrance (6.3) :
Partial Discharge Sensors (10.7):
Top Bottom Back Per Layout
Sketch Required Not Required
Arc - Resistant Construction (7): IR Termography (10.7):
No Yes Type B Other: Required Not Required
Power Circuit Breakers (8): Protective Relaying (10.8):
Operating Voltage, 125 VDC Other: Relay Description Shown on One-Line
Capacitive Trips for AC Operating Voltage Flexitest Switches per PIP ELSSG02, Section 10.8.2
For Failure of Capacitive Trip Device: Relay Description Shown on Attachment
Auto Trip Alarm Contacts Automatic Trip Device or Trip Circuit Monitoring
Relay
Dual Trip Coils Not Required for Motor & Generator
Breakers Double Output Contacts
Operating Voltage Source: Space Heaters (10.9):
By Buyer By Seller (per attachments) Thermostat Switch Not Required
Interrupting Rating: kA @ kV Space Heater Load 50 Watts @ 120 Volts
Close and Latch: kA Other: Nota 1
Remote Racking Device Required Not Required Space Heater Current Monitoring (10.9.4 e)
Accessories in PIP ELSSG02, Section 8.13 Not Required Not Required Required

Process Industry Practices Page 1 of 2


N-267 Oct. 2000
Data Sheet for Medium Voltage Metal-Clad Switchgear
from 2.4 kV to 34.5 kV

Data Provided By: Buyer Seller With Proposal Seller After Order
DC Power Supply (10.10): Documentation:
Required Per Attached Electronic Document Format: .DXF Other: PDF
Spec.: Nota 1 Manufacturer To Provide:
Not Required
Interior Finish (11): 2 Reproducible Plus
Mfg. Std. White 2 Number of Copies of All Documentation Plus
Shop Inspection & Tests (12.4): 2 Copies of the Operating Manuals
Mfr./ANSI Standard Tests Other Tests as Described
Witnessed Not Witnessed Other Requirements:
Preshipment Shop Inspection Nota 1: Requerimientos hacer espacificados por el fabricante.
Certified Test Reports Nota 2: los interruptores deberan ser de tipo extrables.
Other:
Nota 3 : Debe ser NEMA 3R

Process Industry Practices Page 2 of 2