The document provides calculations for a hydroelectric power plant project. It calculates the turbine working head as 78.97m based on the area, flow rate, head losses, and water levels. It then determines the turbine power as 48.81MW, mechanical power as 41.49MW, and electric power as 37.341MW based on turbine and generator efficiencies. It concludes that a Francis or Kaplan turbine matched with a gearbox could be used to connect the turbine to the generator.
The document provides calculations for a hydroelectric power plant project. It calculates the turbine working head as 78.97m based on the area, flow rate, head losses, and water levels. It then determines the turbine power as 48.81MW, mechanical power as 41.49MW, and electric power as 37.341MW based on turbine and generator efficiencies. It concludes that a Francis or Kaplan turbine matched with a gearbox could be used to connect the turbine to the generator.
The document provides calculations for a hydroelectric power plant project. It calculates the turbine working head as 78.97m based on the area, flow rate, head losses, and water levels. It then determines the turbine power as 48.81MW, mechanical power as 41.49MW, and electric power as 37.341MW based on turbine and generator efficiencies. It concludes that a Francis or Kaplan turbine matched with a gearbox could be used to connect the turbine to the generator.