Date: 31/12/2015 Name : Situge S.M.J.M.T

Location
L03 at grid 23A-29/A-B1 concrete pouring inspection was done in day and night
L04 at grid 2-5/A-D Reinforcement beams fabrication work are inspected

L03-L04 at A/7-9 second stage columns formwork was inspected

Did you notice no


any non approved
Materials used at site /
Material used but don't know the status ?

Defects Noted/
Verbal instruction given to contractor
regarding defects

Studied the transfer floor drawings

Referred Method statements ,Drawings


and Engineer's comments.

Collected information

Plant & Labor Observations

General Comments:

Signature:.. Date:31.12.2015..