You are on page 1of 1

Avic-Mixed Development Project

Engineer: Supervision Consultant: Contractor:


Central Engineering Consultancy
AVIC Hotels Lanka Pvt Ltd. CSCEC
Bureau

SITE DIARY
Date: 17/12/2015 Name : Situge S.M.J.M.T

Location
At L03 at grid 23A-32/A-D Reinforcement fabricating
At L03 at grid 2-10/A-D Scaffolding fixing
Podium level at grid 21-29/B1-D Slab & beams reinforcement work was inspected

Did you notice no


any non approved
Materials used at site /
Material used but don't know the status ?

1.Columns head temporary formwork shall be placed


Defects Noted/ 2. Dropped area missing formwork shall be provided
Verbal instruction given to contractor 3. flight 8 & flight 9 of staircase landing main bars were not
regarding defects according to drawing

Transfer level drawings are studying

Referred Method statements ,Drawings


and Engineer's comments.

Collected information

Plant & Labor Observations

General Comments:

Signature:.. Date:17.12.2015..