NWC Water Quality Improvement Projects

PO No . 701220081
Comments Resolution Sheet
Transmittal No.: WQIP-D1-ILF-T-0125 V2
Responsible reviewer: Mushtaq Zaidi/Mohammad Yousaf
Position: Surveyor/ Civil Engineer
Transmittal Date: 8/24/2023

Comment Sheet No.: WQIP-D1-ILF-CS-0125 V2


Resolution by:
Position:
Comment Sheet Date: 8/24/2023

Note: Acceptance does not relieve the contractor from his responsibility and liability concerning compliance with the contract requirement.
No. REV REVIEWER REFERENCE NWC/ILF COMMENT CWC RESOLUTION Code
2200016404-D1-CWC-010GEN-CIV-MS-00531 REVC, METHOD STATEMENT of SITE SURVEY WORKS B
1 ILF MZ Introduction of Project is missing Add at point # 1.0
2 ILF MZ Definition of Project survey Grid detail is missing Add at point # 3.0
3 ILF MZ Scope of work need to be describe in detail Add at point # 3.0
4 ILF MZ Describe ROW limit as per project requirement for site work Add at point # 8.1.1.6
Preparation of drawing detail is missing.
5 ILF MZ/AE Response from contactor is requierd.
open

Refrences: Mention the detail of references for site work


6 ILF MZ/AE the sub items #7.2.5.1 ,2,3 ,… is under clause #8.2.5 , it should renumbering to Add at point # 7.2.5.3 open
start with #8.2.5.1,2,3,….
Purposed survey equipment detail is missing as per the work scope.
Tools and equipment: Provide the detail of equipment and attach calibration
7 ILF MZ certificate.Latest equipment should be use at site for more accuracy. Add at point # 8.1.2

8 ILF MZ Schedule of work missing As per P6-Baseline Schedule

control points data need to be attach/Polygon Point (PP) set based on the
9 ILF MZ reference points.Secondary bench mark to be shifting in presense of engineer.
Add at point # 8.2.5

10 ILF MZ Drawing layer structure is missing. complied


11 ILF MZ Purposed survey staff to be describe. complied
12 ILF MZ Site data should be carried out by jointly all the activity at site. complied
Primary and secondary control points checked after every 3month in engineer
13 ILF MZ presence.
Add at point # 8.2.5

Codes:
A - Approved As Submitted
B - Approved Except As Noted Page 1 of 2
C - Disapproved - Resubmit
D - Receipt Acknowledge
NWC Water Quality Improvement Projects
PO No . 701220081
Comments Resolution Sheet
Transmittal No.: WQIP-D1-ILF-T-0125 V2
Responsible reviewer: Mushtaq Zaidi/Mohammad Yousaf
Position: Surveyor/ Civil Engineer
Transmittal Date: 8/24/2023

Comment Sheet No.: WQIP-D1-ILF-CS-0125 V2


Resolution by:
Position:
Comment Sheet Date: 8/24/2023

Note: Acceptance does not relieve the contractor from his responsibility and liability concerning compliance with the contract requirement.
No. REV REVIEWER REFERENCE NWC/ILF COMMENT CWC RESOLUTION Code

Describe the ROW of topographic survey and site work.


The edge of ROW
14 ILF MZ -The axis of new pipe line with points of intersection and chainage. complied
-Grid of Co-ordinates.
-A Legend
-Key plan
-Tile Block
-Northe arrow

15 ILF MZ An appropriate geoid model is used to calculate orthometric heights. complied

In the table of content please add Topographic Drawings with following.


1. Topographic drawing of pipeline route
16 ILF MZ/AE 2. Topographic drawing of stations and special area of interest
complied open
The attached drawing shall be approved and clear copy

Contractor has to make details field survey with staking to the exact alignments
17 ILF MZ of the pipe line to be constructed and excat determination of the location of complied
existing facilities such as crossing of existing facilites.
18 ILF MZ The final ROW of existing and new pipeline to be agreed with NWC/ILF. complied
19 ILF MZ 7.2.5.1 error tolerances need to be describe as per spec. complied
20 ILF MZ 7.2.5.2 need to be describe in detail. complied
21 ILF MY GEN Coordinate system shall be metioned (Datum and Zone) complied

22 ILF MY GEN Any existing utilities during excavation work shall be determined accurately and complied
record to be reflected in Asbuilt drawing
23 ILF MY GEN All calibration certificates for survey instrument shall be submitted for complied
information prior to start the work
24 ILF AE GEN All Appendix should be attached on proper way (typing and printing) Added open
25 ILF AM HSE Comply with PTW requirement of the client Added B
26 ILF AM HSE All the workers on site shall comply with PPE requirements of the site Added B
27 ILF AM HSE Ensure to maintain the good housekeeping at site Added B
28 ILF AM HSE Contractor should follow as mentioned in RA Added B
Codes:
A - Approved As Submitted
B - Approved Except As Noted Page 2 of 2
C - Disapproved - Resubmit
D - Receipt Acknowledge