You are on page 1of 2

Questionnaire for

steam jet vacuum ejectors


for start-up
company: * contact: *
address: phone:
fax:
e-mail: *
quotation: budget: phone call: visit:
until: until:

tr d

Please choose, which value you * evacuation period


like to predefine. motive flow

Data of the motive flow tr


(For another motive medium, please
motive medium water vapour use the corresponding questionnaire.)

motive pressure ptr bar (abs)


motive flow tr kg/h
motive flow temperature ttr C

Data of the suction flow s


suction medium
volume to be evacuated V m3
(including pipeline)
evacuation period t min
suction pressure pS bar (abs) start end
suction flow temperature tS C
molecular weight MS kg/kmol
air leakage flow L kg/h

Data of mixed flow d


discharge pressure pd bar (abs)

Constructive requirements
material * carbon steel
flanges, type, pressure range * EN DIN-flanges
design code
documentation drawing
manual
acc. press. equipment directive
material certificates
other

* mandatory field
send
110-113-Questionnaire-DVP-start-up-EN-160311

Krting Hannover AG Tel.: + 49 511 21 29-0


Fax: + 49 511 21 29-223
Badenstedter Strae 56 E-Mail: st@ koerting.de
30453 Hannover
Germany www.koerting.de

You might also like