You are on page 1of 5

Questionnaire for wet grinding system

Customer
Plant
Contact
Address

Christian Pfeiffer Hauptsitz Zweigniederlassung Liezen Geschäftsführer


Maschinenfabrik GmbH Sudhoferweg 110-112 Werkstraße 5 Ing. Dietmar Freyhammer
59269 Beckum, Deutschland 8940 Liezen, Österreich Dipl.-Ing. Martin Paterson
Tel. +49 2521 849-0 Tel. +43 3612 270-4101 Prokura
Fax +49 2521 849-123 Fax +43 3612 270-4118 Dipl.-Ing. Tim Nowack
Frank Klapper
office.de@christianpfeiffer.com office.at@christianpfeiffer.com Sitz der Gesellschaft: Beckum
HRB 7270, Amtsgericht
christianpfeiffer.com Ust-IdNr. DE 812 118 576 FN 373934d, ATU 636 35 828 Münster

1/5
Site conditions

Country

City

Plant name

Altitude meters above sea level

Ambient temperatures °C (Max.)

°C (Min.)

Air humidity % (at average ambient temperature)

Seismic zone

Existing infrastructure green field project existing building *


inside crane max. capacity: t

open installation under roof installation


*) Please provide drawing therefore.

Electricity

Frequency Hz Tolerance

Medium Voltage V Tolerance

Low voltage V Tolerance

✔ Neutral wire available

Auxiliary-supply voltage V AC

V DC

2/5
Raw materials

If available, please also provide data sheets (PSD, grindability test, sieve analysis, abrasion test,…)
of raw materials.

Type 1: Type 2: Type 3:


Material name

Material type

Feed size F80 µm

Max. grain size µm

Moisture of feed % H2O

Bulk weight t/m³

Specific gravity t/m³

Bond Work Index * kWh/mt (wet)

Other grindability test

Additional description
Type 1:

Type 2:

Type 3:

*) Please provide grindability test reports with detailed description of sample and test procedure.

3/5
Process water

If available, please also provide water analysis.

Pressure bar

Temperature °C

Density g/l

Solved solids mg / l

Dissolved solids mg / l

pH-Value

Additional remarks:

Production

Type 1: Type 2: Type 3:


Production (dry basis) mt/h nominal

mt/h maximal

Product size - P 80 µm

Solids concentration wt %

Product will be used for*

*) next process step (e.g. for flotation, leaching, FGD,…)

4/5
Scope of supply

If available, please also flow sheet.

Conveying system
Crusher(s)
AG / SAG Mill overflow grate discharge
Ball mill overflow grate discharge
Mill sump(s)
Slurry circulation pumps
Hydro cyclone station
Valves
Pipes
Control system
Equipment installation on site

Comments / Additions:

Please provide further description for your project requirements…