The document is a questionnaire for collecting information about a static secondary containment system project. It requests general project details, materials selection for the inner and outer pipes, leak detection methods, installation locations and conditions, secondary containment component selection, operating conditions, and required service life. The respondent indicated the project name, that PE80 and PE100 were used for the outer pipe, optical and N2 monitoring would be used, and an expected service life of 10 or more years.
The document is a questionnaire for collecting information about a static secondary containment system project. It requests general project details, materials selection for the inner and outer pipes, leak detection methods, installation locations and conditions, secondary containment component selection, operating conditions, and required service life. The respondent indicated the project name, that PE80 and PE100 were used for the outer pipe, optical and N2 monitoring would be used, and an expected service life of 10 or more years.
The document is a questionnaire for collecting information about a static secondary containment system project. It requests general project details, materials selection for the inner and outer pipes, leak detection methods, installation locations and conditions, secondary containment component selection, operating conditions, and required service life. The respondent indicated the project name, that PE80 and PE100 were used for the outer pipe, optical and N2 monitoring would be used, and an expected service life of 10 or more years.
Questionnaire for Static Evidence of Secondary Containment Systems
General project information
Project / Object = File name Order placed by / Customer Bid / Order number
Materials selection for outer pipe* PE 80 PE 100 PVC-U
X X X Leak detection information optical N2 Cable Other Type of monitoring* X X X Overpressure difference [bar] Underpressure [mbar] No pressure* X
Additional system data* Installation location 1 Installation location 2
Above ground X In buildings X
In the ground X Outdoors X
Time period for temperature
change: Ambient temperature: Max. Min. Max. Min. Installation temperature: Max. Min. Max. Min.
Selection of Secondary Containment components
X 90° elbow X 45° elbow XX T-red
Inner pipe: Outer pipe: Material Material Nominal diameter DN Nominal diameter DN Outer diameter d Outer diameter d Wall thickness e Wall thickness e Nominal pressure rating PN Nominal pressure rating PN Standard dimension ratio SDR Standard dimension ratio SDR
Jointing technology BF SF IR CT EF EC BF = Butt fusion SF = Socket fusion
Inner pipe* X X X X IR = Infrared CT = Cementing Outer pipe* X X EF = Electrofusion EC = EPDM coupler
Operating Conditions Flow media / Concentration Density: g/cm3
Total load time:
Maximum working temperature °C In percent % Minimum working temperature °C In percent % Maximum working pressure bar In percent % Minimum working pressure bar In percent %