General Specification for Material Requisition

Project Name Bac Ninh Waste to Energy (WtE) Project, Vietnam


Project Number GW2005
Supplier / Purchaser [EP+SV] JFE Engineering India Pvt Ltd
Client /Contractor/Purchaser [EPC] JFE Engineering Corporation, Environmental Solutions Sector
Owner T&J Green Energy
Project location Thuan Thanh District Bac Ninh Province Vietnam
Nearest Deep Sea port- Hai Phong port, Vietnam
Nearest airport - Hanoi Air port
Plant 500 TPD Waste-to-Energy Plant At Bac Ninh Province,
Vietnam
Project Schedule Plan Plant civil work start- 1 Jan 2022 [EPC to confirm]
Plant installation start- 1 Sep. ,2022 [EPC to confirm]
Taking Over - 31 Dec. ,2023 [Tentative-EPC to confirm]
Plant operation mode 24 hrs Continuous operation, 7920 hrs/year
Operation Availability - 330 days/year (For equipment design)
Installation type Outdoor installation (Unless otherwise specified)
Site elevation, m 50 above mean sea level
Ambient Conditions Maximum Average Minimum
Dry bulb temperature °C 38 24 10
Relative humidity % 90 80 -
Average monthly rainfall 170 mm
- -
mm (Monthly)
Design ambient temperature °C 32 [for all equipment except air cooled condenser]
35 [for air cooled condenser]
Ambient barometric pressure, 1.013
bar(A)
Seismic Factor Refer Building Regulation TCVN: Design of structures
For earthquake Resistances. Part 1: general rules,
seismic actions and rules for buildings

Wind Load Wind Speed : 39.37m/s (for Design)


Wind gust: 3 secs.
Frequency: 20 yrs.
Wind Pressure : 0.95kN/sq.m

Steam Condition MPaG/ °C 4.1 / 400 @ Super heater outlet

Compressed air supply Miscellaneous air Instrument air


Dehumidified (dew point < - Dehumidified (dew point < -
17 °C at atmospheric 30 °C at atmospheric
pressure) pressure)
Supply pressure max= 0.7, min= 0.4 MPaG

Page 3 of 6
General Specification for Material Requisition

Cooling water supply Content Inlet Outlet


Temperature, °C 33 Vendor to inform outlet
Approach : 8°C
temperature and amount of
cooling water required.
Should not be more than
40°C
Pressure, MPaG 0.4 0.3
Important Note- Expected temperature during maximum
ambient condition (dry bulb temp 38°C and relative humidity
90%) should be also specified.
Noise level, dB(A) Location Value
At site boundary < 70
At 1m from equipment on operation continuously as < 85
working atmosphere in any direction
Note-
1. If above criteria cannot be achieved, covers or enclosure
should be applied by supplier
2. If noise level would be over the criteria for equipment NOT
on operation contentiously, such as air knocker,
compressed air pulse, hammering device, vendor is
requested to submit expected noise level.

Vibration Limit ISO 2314, ISO 10816 and ISO 7919


[For the steam turbine, main generator and other large
auxiliaries - feed pumps, fans etc.]

Electrical power supply Power circuit AC400V x 3ph x 4W x 50Hz


Control circuit AC230V x 1ph x 2W x 50Hz
DC110V x 2W
Operation/instrument circuit DC24V / AC230V x 1ph x 2W x 50Hz
UPS Supply
Analog signal I/O DC 4-20 mA
Power generation voltage AC6.6kV x 3ph x 3W x 50Hz
Power Evacuation Nominal/Operating Voltage:
/Transmission Voltage AC35kV x 3ph x 3W x 50Hz
Rated Voltage :
AC38.5kV x 3ph x 3W x 50Hz
Highest System Voltage :
AC40.5kV x 3ph x 3W x 50Hz
Generator Transformer 35 kV / 6.6 kV
Voltage Ratio
Utility during site construction Construction Power: Purchaser(EPC) Scope
Construction Water: Purchaser(EPC) Scope
Fuel (Diesel) : Purchaser (EPC) Scope (Including commissioning
activity)
Motor type - Motor Winding Insulation shall be Class F, however temperature
increase shall not be more than Class B limits. VFD driven motors
shall be of Inverter duty.

Page 4 of 6
General Specification for Material Requisition

- Prevention grade IP-55 (Totally enclosed, waterproof, outdoor type)


Efficiency class-IE3
Vibration Limit ISO 10816 and ISO 7919
Painting Refer “WB-C11-A000-002 Painting specification”

Spare Parts, Wear Parts Refer “WB-C11-A000-003 Philosophy of Spare Parts, Wear Parts and
and Special Tools Special Tools”

Secondary Wiring Work Refer “WB-C11-A000-004 Secondary Wiring Work Philosophy”

Insulation Refer “WB-C11-A000-005 Insulation specification”

Lubricant Filling Method Refer “WB-C11-A000-006 Lubricant Filling Method”

Platform, staircase and ladder Refer “WB-C11-A000-007 Specification for Platform, Stair and
Handrail”
Applicable Codes and Refer “WB-C11-A000-101 Applicable Codes and Standards”
Standards
Basic Transportation Block Refer “WB-C11-A000-102 Basic Transportation Block Concept”
Concept
Unit System SI
Defect Liability
1. The DLP shall be twenty four (24) months from the date of
complete supply or eighteen (18) months from the date of
commissioning whichever is earlier.
Photographing
1. Vendor shall take and submit a photo of the ordered equipment to
the Purchaser (JFE-India) before the shipment.
2. For detail instruction please refer ‘’Instruction on Photography
(WB-C11-A00-401)”
Special Requirements
1. English language shall be used in all documents.
2. As-built drawing (dwg) by PDF format shall be submitted within
two weeks after Taking Over.
3. CAD data of outline dwg (AutoCAD 2017 or newer
version/General Arrangement Drawing) shall be submitted for the
planning work of layout.
4. All electrical parts and instruments (including parts of control
Panels) should be based on IEC standard. If PLC is used in
Vendor's scope, major PLC supplier shall be chosen after
Purchaser’s approval.
Safety Covers
1. Every dangerous part (including any flywheel) of any electric
generator, motor, transmission machinery or other machinery in
the workplace shall be securely fenced
2. Safety cover shall be secured with bolts.
3. Safety cover shall be totally covered type (not punch metal type).

Page 5 of 6
General Specification for Material Requisition

Others
1. Relevant law of Vietnam shall be complied
2. Regarding oil and grease, compatible product name of ‘’shell’’
shall be specified in the list of lubricant.
3. For other general requirement, refer Material Requisition
attachment.

Page 6 of 6