FORM: PWCC

SHEET: 01 OF 01

PROJECT TITLE:


Petrofac
ENERGY DEVELOPMENTS
TUNISIA LTD
PROVISION OF OFFSHORE INSPECTION OF
CHERGUI GAS EXPORT PIPELINE

( 2011 Survey)

S ROST
[-\HlJ~('" \\'olks Drvisrou

LOCATION: Chergui
PROVISIONAL WORK COMPLETION CERTIFICATE Offshore Pipeline

WORK COMPLETION AUTHORITY J

1 HEREBY CONFIRM THAT THE ABOYE PROJECT AS DEFINED , HAS BEEN PERFORMED AND COMPLETED
lN FULL ACCORDANCE WITH PETROFAC SOW , PROCEDURES AND RECOMMENDATIONS AS PER CONTRACT
PTU_PRJ_CON_0001_2011 Section III Schedule B _ Rates and Priees

NAME

SIGNATURE

DATE

COMPANY
fORM: fWCC
SHEET: 01 Of 01

PROJECT TITLE:


Petrofac
ENERGY DEVELOPMENTS
TUNISIA LTD
PROVISION OF OFFSHORE INSPECTION OF
CHERGUI GAS EXPORT PIPELINE

( 2011 Survey)
S ROST
Slll,.~",,,\\ ull:s l'lnswlt

LOCATION:Chergui
FINAL WORK COMPLETION CERTIFICATE Offshore Pipeline

WORK COMPLETION AUTHORITY

1 HEREBY CONFIRM THAT THE ABOYE PROJECT AS DEFINED , HAS BEEN PERFORMED AND COMPLETED
lN FULL ACCORDANCE WITH PETROFAC SOW , PROCEDURES AND RECOMMENDATIONS AS PER CONTRACT
PTU PRJ CON 0001 2011 Section III Schedule B Rates and Priees and AMENDMENT NO.02 related
to the addition~1 work for the concrete blocks removal

NAME

SIGNATURE

DATE

CpMPANY
-------_ ..

FORM: WCC
SHEET: 01 OF 01

PROJECT TITLE:

Petrofac Chergui Offshore Pipeline Dornes Removal


near Kerkennah shore
)
ENERGY DEVELOPMENTS
SAROST
TUNISIA LTD
S1Jl.,',f' ,1 \ '. oi l,s llIllSlOlI

Chergui
LOCATION:
WORK COMPLETION CERTIFICATE Offshore Pipeline

Subject: Chergui offshore Pipeline channel reinstatement by domes removal

WORK COMPLETION AUTHORITY

1 HEREBY CONFIRM THAT THE ABOVE WORK AS DEFINED , HAS BEEN COMPLETED lN FULL
ACCORDANCE WITH SPECIFICATIONS, VENDOR PROCEDURE AND RECOMMENDATIONS lN OROER TO
ALLOW NATURAL SEA WATER CIRCULATldN BY LOW TIDE

NAME

SIGNATURE

DATE

COMPANY SUBCONTRACTOR CLIENT


(SAROST) (PED)
FORM: WCC
SHEET: 01 OF 01

PROJECT TITLE:


Petrofac
ENERGY DEVELOPMENTS
TUNISIA LTD
Chergui Offshore Pipeline Dornes Rernoval
near Kerkennah shore

SlIl.r-
SAROST
1 \' UlI::. 1'1 l!,'1U1I

Chergui
LOCATION:
WORK COMPLETION CERTIFICATE Offshore Pipeline

Subject : Freespan Rectification by Concrete Bags Method


( Trial on a Freespan located @ KP29.491)

WORK COMPLETIONAUTHORITY

1 HEREBY CONFIRM THAT THE ABOVE WORK AS DEFINED , HAS BEEN COMPLETED lN FULL
ACCORDANCE WITH SPECIFICATIONS, VENDOR PR6CEDURE AND RECOMMENOATIONS lN OROER TO
TEST THE METHOD OF CONCRETE BAGS FOR FREESPAN RECTIFICATION

NAME

SIGNATURE

DATE

C-OMPANY CLIENT
SUBCONTRACTOR
(SAROST) (PED)
FORM: WCC
SHEET: 01 OF 01

PROJECT TITLE:


Petrofac
ENERGY DEVELOPMENTS
TUNISIA LTD
Pipeline Remediai Work Elimination
Freespans
Seaweed Matress Installation
of

SAROST
~nl,se . \\"ulks Iuvrsion

Chergui
LOCATION:
FINAL WORK COMPLETION CERTIFICATE Offshore Pipeline

WORK COMPLETION AUTHORITY

1 HEREBY CONFIRM THAT THE ABOVE PROJECT AS DEFINED , HAS BEEN INSTAlLED AND COMPLETED
lN FULL ACCORDANCE WITH SPECIFICATIONS, VENDOR PROCEDURE AND RECOMMENDATIONS
WE CONFIRM THAT SEAWEED MATRESS INSTALlED ON MAY 2010 ARE STILllOCATED ON THEIR INITIAL
POSITIONS BASED ON THE PIPELINE EXTERNAllNSPECTION PERFORMED ON NOV 2011

NAME

SIGNATURE

DATE

(OMPANY SUBCONTRACTOR
(SAROST)