Coffee Shop Network Project Proposal

This document provides a proposal for a new network for a small coffee shop. It outlines the project scope, topology, risks/benefits, budget, and resources. The scope involves building a network with VPN access for remote monitoring. Risks include scope creep, scheduling errors, and network failures. Benefits are increased revenue, cost savings, and productivity gains. The budget allocates funds for equipment, installation, and labor costs totaling $8,283.53.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
116 views8 pages

Coffee Shop Network Project Proposal

This document provides a proposal for a new network for a small coffee shop. It outlines the project scope, topology, risks/benefits, budget, and resources. The scope involves building a network with VPN access for remote monitoring. Risks include scope creep, scheduling errors, and network failures. Benefits are increased revenue, cost savings, and productivity gains. The budget allocates funds for equipment, installation, and labor costs totaling $8,283.53.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

Proposal for Coffee Shop

Project Charter
Version 1.0

Prepared by: Submitted to:

Tianjiao Wang (100920557) Prof. George Gorsline


S.M Imtiaj Islam (100983673)
Rajat Sood (100981754)
Abdul Samad Mahmood Qureshi (100799523)
Farhad Mouradi (100992912)
<Company Name>

Revision History

Date Version Description Author


November 1.0 Document Creation Group 6
25th 2016
November 1.0 Addition: Project Proposal Tianjiao Wang
25th 2016
November 1.0 Addition: Topology Group 6
25th 2016
November 1.0 Addition: Scope Statement Abdul Qureshi
26th 2016
November 1.0 Addition: Risks/Benefits S.M Imtiaj Islam,
26th 2016 Farhad Mouradi
November 1.0 Addition: Budget/Resources Rajat Sood
26th 2016
November 1.0 Document Editing Group 6
27th 2016
Project Proposal

The purpose of this project is creating a new small network for a small 24/7 coffee shop
based on the requirements of the owner of the coffee shop.

The coffee shop will support four POS machines for sales in the front to help
customers, and one manager will get a desktop to manage all the data and sales
information. By using the VPN, the owner of this coffee shop can monitor and check
the details of employees' work at home. Due to these requirements, the coffee shop
need a sample, secure, and high availability network.

Topology
<Company Name>

Scope Statement

In scope Out of Scope

Building a topology based on the ISP which will provide IP addressing for all
network requirements and making a the clients
network plan

Order network equipment such as We are going to install Microsoft SQL


routers, access points, Point of Sales Database but not going to manage or
and install and cable them. configure it.
Owner wants to work at home so there The bank that we choose is decided by the
will be an VPN setup for them to owner of the coffee shop
connect to work

Ensuring high availability and testing We are not going to upgrade the operating
for connectivity issues. Making sure system on the POS because it
there is a backup server in case the already meets the network requirements.
main server goes down

Risks and Solutions

1) Scope Risk

Scope creep Possible changes and addition to the plan as the project gets carried
on

Hardware and Software issues - Possibly cause due to defective equipment

Solution

Risk Avoidance - Its a company policy for us to stick to the plans and not make any
changes due to unsatisfactory hindering.

Risk Reduction - Equipment we buy are from people who are adept to what they
do/sell and are trusted and recommended by us.

2) Scheduling Errors/Risks

Human Errors For a new team like us, its likely for us to make errors while setting
up our schedules and equipment delivery dates.

Natural Disasters Any kind of natural disasters that occurs will/might cause
hindrance to our productivity.

Solution

Professionalism We might a new team, but we take our work seriously. We have
a clean slate when it comes to any kind lateness or tardiness.
<Company Name>

Risk Acceptance This is something that has to be taken accounted for, and we
are always prepared for these situations.

3) Resource Risks

Man power Possible lack in man power, due to large projects with tight deadlines

Specialists If the project requires someone or more to be proficient in a certain


field.

Solution

We take what we can handle, so all these will be already taken accounted for.

4) Technical Risks

Network Failure In any case, its possible to network to completely fail.

Solution

High Availability - We know how important it is for a business to run for 24/7, so we
do multiple crash tests and use industry level security solutions to avoid any network
failures.

Benefits

Increased Revenue:

The most common type of benefit and a very broad category. It has a direct impact on
the revenue of the organization.

Revenue cost saving:


When systems are automated, this benefit is obvious as automation can save manual
process time. This benefit mean that organization can make some roles redundant or
relocate some roles to different department.

Hardware cost saving:

IT projects replace the existing hardware with new hardware which can be less
expensive. New hardware can require less maintenance which will result in cost saving.
In some cases, there could be saving by moving your application and data to a cloud-
based services which will reduce your hardware expenditure.

Productivity gain:

Automating systems should lead to productivity gain which can allow people to do more
work. Introducing system reduces manual task, so the resources can be delivered to
other areas.

Resources

Position Name Responsibilities

Project Manager S.M Imtiaj Islam Manage and supervise the project.

Network Analyst Tianjiao Wang To evaluate equipment and


analyzing traffic flow.
Equipment Installer Abdul Qureshi, Farhad For installing, configuring and test
Mouradi, Rajat Sood the equipments.
Security Analyst Abdul Qureshi, Farhad Implementing Security and network
Mouradi policies.
Customer Support Rajat Sood Customer Services and general
and Services management

Budget
<Company Name>
Type of Expense Cost GST & HST Amount
Tianjiao 14*8*11.40 $1276.80
Rajat 09*8*11.40 $820.80
Imtiaj 15*8*11.40 $1368.00
Farhad 08*8*11.40 $729.60
Abdul 12*8*11.40 $1094.40
PC for the Coffee $369.99 13% $418.09
Shop
POS $404.90 *4 13% $1830.14
Credit Card $99.99 *4 13% $451.95
Reader
D-Link Amplifi $89.99 13% $101.69
Wireless AC1200
Dual Band Router
D-Link Wireless $99.98 13% $112.97
AC1200 Dual-
Band PoE Access
Point
Insignia RJ45 $69.99 13% $79.09
Ethernet Patch
Cable (NS-
PNW76C0- C)
TOTAL $8,283.53