PROJECT: DMRC CC-34, PROJECT SECTION :- Dismantling Of Batching Plant Date: - 24.09.2016
LOCATION/ DWARKA / THE SITE AT DELHI ASSESSMENT TEAM: - Mr. Benny Joseph, Mr. Venkataramana Bollu, Mr. Dinesh Sivaram, Mr. Sanjeev Singh, Mr. Uttam Jain, Mr. Avichal Jain
PREPARED BY: Mr. Dinesh Sivaram APPROVED BY: Mr. Benny Joseph
DESIGNATION: Chief HSE Manager Sign:- DESIGNATION: PROJECT MANAGER Sign:
SxP
Assessment on
control measure
Hierarchy
Probability (P)
Probability (P)
Cross
Severity (S)
Severity (S)
Severity (S)
Further
Existing Control reference to
SxP
SxP
Controlling
Admin. control
No Activity Hazards Risk Measures/ work the relevant Action By
Engg control
Measures
Substitution
Elimination
Total Controls Determined instructions/ SOP’s Objectives &
Required
PPE
Programmes
* Incase of legal requirement ‘Y’ shall be mentioned in the column of legal & base risk level shall be considered “High” irrespective of score of risk assessment. ERL & ARR shall be indicated with the word “Legal” to indicate the importance
of legal requirement.
** After every incident HIRAC of the particular activity shall be revised.
Format No.: HS F 105 15 01, Rev. 00, Rev. date: 10.03.13 Page 1 of 8
OH & S MANAGEMENT SYSTEM
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL
May cause
Sharp edges
minor/major 4 3 12 M √ 2 1 2 L NIL 2 1 2 L SIC
of shed
injury
Person
uses
portable
1. Take WAH & FHRA 1. Take WAH & FHRA
ladder to
2. Use tested with double 2. Use tested with double
2 remove all
lanyard full body safety lanyard full body safety
nut- bolts
harness. harness.
with
L
3. Use cotton hand gloves. 3. Use cotton hand gloves.
spanner or M +
Fall hazard,
May cause + 4. Barricade drop zone and 4. Barricade drop zone and L
gas cutting Fall of SIC &
minor & major 5 3 15 le √ √ 2 2 4 e NIL 2 2 4 L
material ensure no any person in ensure no any person in SHE
set injury ga g
l drop zone. drop zone. e
L
5. Person should be 5. Person should be trained
trained On working at On working at heights and
heights and ensure he is ensure he is medically fit.
medically fit.
M L
+ Hot work permit must be +
Check all hoses before L+
Gas cutting Burn Y 4 2 8 le √ √ prepared before 4 1 4 le NIL 4 1 4 SIC
start work. legal
ga commencement of work. g
l al
* Incase of legal requirement ‘Y’ shall be mentioned in the column of legal & base risk level shall be considered “High” irrespective of score of risk assessment. ERL & ARR shall be indicated with the word “Legal” to indicate the importance
of legal requirement.
** After every incident HIRAC of the particular activity shall be revised.
Format No.: HS F 105 15 01, Rev. 00, Rev. date: 10.03.13 Page 2 of 8
OH & S MANAGEMENT SYSTEM
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL
* Incase of legal requirement ‘Y’ shall be mentioned in the column of legal & base risk level shall be considered “High” irrespective of score of risk assessment. ERL & ARR shall be indicated with the word “Legal” to indicate the importance
of legal requirement.
** After every incident HIRAC of the particular activity shall be revised.
Format No.: HS F 105 15 01, Rev. 00, Rev. date: 10.03.13 Page 3 of 8
OH & S MANAGEMENT SYSTEM
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL
Silicosis,
a) Use of face masks / a) Use of face masks /
respiratory PEH &
filters, personal hygiene, filters, personal hygiene,
7 Dust Dust particles disease, 4 3 12 M √ √ 4 1 4 L NIL 4 1 4 L Site Mech.
surface to be kept wet. surface to be kept wet.
Pneumoconio Engineer
b) Long term screening b) Long term screening
sis’.
a) Setting up of Rest
Room. a) Setting up of Rest Room.
b) Rescheduling of work b) Rescheduling of work
cycle. cycle.
c) Use of light weight, light c) Use of light weight, light
Heat stroke,
Working colored and loose clothes. colored and loose clothes. PEH &
Heat Illness to
8 outside in 3 4 12 M √ √ d) Consuming adequate d) Consuming adequate 2 2 4 L NIL 2 2 4 L Site Mech.
Exhaustion, person
Sun quantity of water. quantity of water. Engineer
Heat stress
e) Keep out of direct e) Keep out of direct
sunlight. sunlight.
f) Rest area in shady f) Rest area in shady place.
place. g) Head protection.
g) Head protection.
Collapse of
Vehicle while
Injury to a) Traffic control at entry
moving on a) Traffic control at entry PEH &
Vehicle person & point by security
9 steep roads 4 3 12 M √ √ point by security personnel. 2 2 4 L NIL 2 2 4 L Site Mech.
movements Damage to personnel’s.
either upward b) No person should be Engineer
property. b) No person should be
or while
rolling down.
WORKING AT HEIGHTS
* Incase of legal requirement ‘Y’ shall be mentioned in the column of legal & base risk level shall be considered “High” irrespective of score of risk assessment. ERL & ARR shall be indicated with the word “Legal” to indicate the importance
of legal requirement.
** After every incident HIRAC of the particular activity shall be revised.
Format No.: HS F 105 15 01, Rev. 00, Rev. date: 10.03.13 Page 4 of 8
OH & S MANAGEMENT SYSTEM
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL
* Incase of legal requirement ‘Y’ shall be mentioned in the column of legal & base risk level shall be considered “High” irrespective of score of risk assessment. ERL & ARR shall be indicated with the word “Legal” to indicate the importance
of legal requirement.
** After every incident HIRAC of the particular activity shall be revised.
Format No.: HS F 105 15 01, Rev. 00, Rev. date: 10.03.13 Page 5 of 8
OH & S MANAGEMENT SYSTEM
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL
L
Lose control/ M Authorized ,competent, +
May hit and + certified and HMV Driving L PEH &
Crane
cause Y 5 2 10 le √ √ License Holder Driver / 2 2 4 e 2 2 4 L Site Mech.
Movement
minor/major ga Operator shall be allowed g Engineer
injury l for operation of crane e
L
Check all lifting equipment
Failure to May cause prior to use and ensure PEH &
lifting minor & major 3 2 6 M √ √ that all equipment is 3 1 3 L NIL 3 1 3 L Site Mech.
Crane equipment injury certified by a third party. Engineer
11
movement
M L
Operator, who come in
Alcoholic + + PEH &
Personnel alcoholic/ drunken L+
condition Y 4 2 8 le √ √ 4 1 4 le NIL 4 1 4 Site Mech.
injury condition should not be legal
during works ga g Engineer
allowed in any activity
l al
M L
+ Unauthorized person not to Unauthorized person not to + PEH &
Unauthorized L+
Serious injury Y 4 2 8 le √ √ be allowed in any be allowed in any operation 4 1 4 le NIL 4 1 4 Site Mech.
work legal
ga operation at site. at site. g Engineer
l al
L
Fall of
Lifting and shifting Lifting and shifting activities +
material Property
activities shall be under shall be under supervision of L PEH &
during damage &
5 3 15 √ √ supervision of Competent Competent engineer / 2 2 4 e NIL 2 2 4 L Site Mech.
material Personnel
engineer / Foreman / Foreman / supervisor. g Engineer
handling injury
supervisor. e
L
Damage of Property 5 2 10 M √ √ Lifting appliances and gear Lifting appliances and gear 4 1 4 L NIL 4 1 4 L PEH &
faulty gear, damage & to be certified by third party to be certified by third party Site Mech.
tools and Personnel and ensured the suitability and ensured the suitability Engineer
tackles during injury by concern responsible by concern responsible
dismantling person on site before use. person on site before use.
activity Person not to stand under Person not to stand under
suspended load. suspended load.
* Incase of legal requirement ‘Y’ shall be mentioned in the column of legal & base risk level shall be considered “High” irrespective of score of risk assessment. ERL & ARR shall be indicated with the word “Legal” to indicate the importance
of legal requirement.
** After every incident HIRAC of the particular activity shall be revised.
Format No.: HS F 105 15 01, Rev. 00, Rev. date: 10.03.13 Page 6 of 8
OH & S MANAGEMENT SYSTEM
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL
Property
Maintenance to have been Maintenance to have been PEH &
Failure of damage &
5 2 10 M √ carried out under engineer carried out under engineer 4 1 4 L NIL 4 1 4 L Site Mech.
Crane engine Personnel
and green sticker should and green sticker should be Engineer
injury
be on body of crane on body of crane
Trained and certified Trained and certified
Collision of
Property signalman only to signal signalman only to signal the
load and PEH &
damage & the crane operator, Crane crane operator, Crane swing
person under 4 3 12 M √ √ 4 1 4 L NIL 4 1 4 L Site Mech.
Personnel swing area is cordoned off area is cordoned off and
suspended Engineer
injury and entry prohibited until entry prohibited until the load
load
the load is stacked safely. is stacked safely.
May cause Rigger use tagline for all Rigger use tagline for all PEH &
Swinging
minor & major 3 2 6 M √ √ lifting activities and control lifting activities and control 3 1 3 L NIL 3 1 3 L Site Mech.
loads
injury the movement of load the movement of load Engineer
* Incase of legal requirement ‘Y’ shall be mentioned in the column of legal & base risk level shall be considered “High” irrespective of score of risk assessment. ERL & ARR shall be indicated with the word “Legal” to indicate the importance
of legal requirement.
** After every incident HIRAC of the particular activity shall be revised.
Format No.: HS F 105 15 01, Rev. 00, Rev. date: 10.03.13 Page 7 of 8
OH & S MANAGEMENT SYSTEM
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL
UNAUTHORISED VISITORS
Unauthorized 1. Ensure construction site 1. Ensure construction site is
Unauthorized Unauthorized and/ or is left as secure as left as secure as reasonably
visitors visitors to unaccompani reasonably practicable by practicable by using fencing,
site/Third ed third using fencing, barriers, barriers, working signs,
12 parties parties are a 3 2 6 M √ √ √ √ working signs, lights etc. lights etc. as appropriate. 2 1 2 L NIL 2 1 2 L SIC
potential as appropriate.
hazard to
themselves
and others.
SHIFTING DISMANTLED PARTS OF PLANT ON TRAILER
1. Use good serviced 1. Use good serviced
Trailers. Trailers.
2. Deploy trained operator. 2. Deploy trained operator.
3. Operate slowly and 3. Operate slowly and
carefully on rough roads. carefully on rough roads.
Personal 4. Provide trained banks 4. Provide trained banks
Shifting Use of
injury or men. men. PEH &
13 plant parts defective 4 2 6 M √ √ 3 1 3 L NIL 3 1 3 L
property √ 5. Control of Dust 5. Control of Dust SIC
by trailers trailer
damage. generation. generation.
6. Ensure wheel choke is 6. Ensure wheel choke is
provided while loading on provided while loading on
trailer. trailer.
7. Trailer key should be 7. Trailer key should be
handover to rigger. handover to rigger.
* Incase of legal requirement ‘Y’ shall be mentioned in the column of legal & base risk level shall be considered “High” irrespective of score of risk assessment. ERL & ARR shall be indicated with the word “Legal” to indicate the importance
of legal requirement.
** After every incident HIRAC of the particular activity shall be revised.
Format No.: HS F 105 15 01, Rev. 00, Rev. date: 10.03.13 Page 8 of 8