PM CHECK LIST FOR ANALYSER-CO - BCIN-003

----------------------------------------------------------------
TASK DESCRIPTION FRQUENCY MONTHLY
-----------------------------------------------------------------

1.0 REFERENCE DOCUMENT & MATERIALS


1.1 REFER RELEVANT DRAWINGS AND DOCUMENT.
1.2 COLLECT REQUIRED DATA FROM DATA SHEET.
1.3 PREPARE TEST EQUIPMENT AND TOOLS REQUIRED FOR
CHECKS/TESTS.
----------------------------------------------------------------
2.0 SAFETY & PERMIT
2.1 OBTAIN WORK PERMIT FROM DESIGNATED AUTHORITY.
2.2 OVERRIDE ANY S/D ACTION AS REQUIRED AND RECORD AS
APPLICABLE
2.3 ENSURE NECESSARY EQUIPMENT ISOLATION IN PLACE.
2.4 DISPLAY CAUTION AND WARNING NOTICES.
2.5 ADVISE CONTROL ROOM OPERATOR TO CHECK INDICATION AND
ACKNOWLEDGE ALARM AS NECESSARY.
2.6 AS APLLICABLE TAKE THE LOOP ON MANUAL & PUT THE LOOP
BACK TO AUTO AFTER JOB COMPLETION
2.7 OBSERVE ALL SAFETY PRECAUTIONS.
---------------------------------------------------------------
3.0 WORK SUMMARY
3.1 CHECK FOR POWER SUPPLY AND ITS CONNECTIONS
3.2 ISOLATE PROCESS GAS LINE
3.3 PERFORM LEAK TEST AS PER MFRS RECOMENDATIONS
3.4 CHECK & CLEAN FILTER AS REQUIRED
3.5 PURGE THE SAMPLE LINE
3.6 CHECK THE CONTINIUTY OF THERMAL LINK
3.7 APPLY ZERO GAS AND CHECK ZERO
3.8 APPLY SPAN GAS AND NOTE READING
3.9 RESTORE NORMAL PROCESS GAS SUPPLY
3.10 CHECK SAMPLE GAS FLOW METER INDICATION
3.11 ENSURE SUFFICIENT SAMPLE GAS PR,IF REQUIRED ADJUST
3.12 CHECK THE FUNCTION OF ANALYSER
3.13 CHECK THE CONDITION OF LOCAL DISPLAY
3.14 VERIFY STEADY STATE OPERATION. SECURE ALL ENCLOSURES
3.15 VISUALLY CHECKS ALL FIELD WIRING /CABLES TIDE-UP AS
NECESSARY.
3.16 RETURN ANALYSER TO SERVICE
3.17 RAISE SEPARATE WR FOR CORRECTIVE ACTION AS REQUIRED.
-----------------------------------------------------------
4.0 JOB COMPLETION
4.1 RETURN ALL EQUIPMENT TO THE NORMAL OPERATING CONDITION.
4.2 LOG TEST/CALIBRATION RESULTS & COMPLETE REPORT.
4.3 REMOVE CAUTION AND WARNING NOTICES.
4.4 ENSURE WORK SITE IS IN A CLEAN AND SAFE CONDITION.
4.5 NORMALIZE ALL INTERLOCKS
4.6 SIGN OFF PERMIT TO WORK.