1. Static Equipment
2. Piping
3. Instrumentation
4. Civil
5 Rotary Equipment
6 Package Equipments
8 Heaters
9 Electrical
11 Fire Fighting
ISSUED :
DOC.No. DHT Project Sheet 3 of 34
1. Static Equipment:
1.1. Reactors, Columns, Pressure Vessels
Bolting for each nozzle with blind 10% (minimum two in each size)
1 / companion Flange and for each of installed fastners.
pad nozzle
Gaskets for each nozzle with Two sets for each installed
blind / gasket.
2
Companion flange for each pad
nozzle
Gasket for each internal flange of Two sets for each installed
4
each size / type gaskets
Bolts, nuts, clamps, spares for 10% (minimum two in each size)
6
demister of each size / type of installed fasteners.
1 Gaskets 400%
ISSUED :
DOC.No. DHT Project Sheet 4 of 34
3 Plugs 20%
4 Belts 100%
Blade for each size / type of fan One set (one set is total number
7
of blades in one fan)
Set of pulleys (fan & motor ) a. 1 set for each type of fan /
motor set not exceeding two in
number.
8
b. 2 Sets for each type of fan /
motor set numbering three and
more.
ISSUED :
DOC.No. DHT Project Sheet 5 of 34
Fan Bearing set (top + bottom = 1 a. 2 for fans uptp including two in
set) number
Bolts / Nuts of each size type 10% of total for each size
1 (minmum 10 nos of each size /
type)
ISSUED :
DOC.No. DHT Project Sheet 6 of 34
ISSUED :
DOC.No. DHT Project Sheet 7 of 34
2. Piping:
ISSUED :
DOC.No. DHT Project Sheet 8 of 34
3. Instrumentation:
ISSUED :
DOC.No. DHT Project Sheet 9 of 34
ISSUED :
DOC.No. DHT Project Sheet 10 of 34
ISSUED :
DOC.No. DHT Project Sheet 11 of 34
gasket, diaphragm,
o-ring for each valve)
b) 20% or minimum 2 nos. of each type /size,
(Self Actuating Valve) rating etc.of Trim set consisting of seat, seat
ring/seal ring, plug with stem, cage (wherever
applicable), packing material for each valve to
be provided as spare.
Same as those of Control Valves and Shut
Down valves and additionally
a) Gaskets for actuator per unit
PRDS & b) Gaskets for valve and connections per unit (if
2.5
De-superheater unit such gaskets are special
and supplied by PRDS/ De-Superheater
vendor)
c) Spray nozzle per unit
2.6 Breather Valves 1 Set of seal kit for each valve
One no. of flame arrester element and one set
2.7 Flame Arresters Gasket for each Type, Size, Rating and
material
3 Nos. of Gaskets & 3 Nos. of spare discs for
2.8 Rupture Disc
each Tag
3 ANALYSER
a) Furnace Assembly -1
b) Thermocouple - 1
c) Sensor board - 1
d) Zirconia Oxide Cell -1
3.1 O2 Analyser e) Each type / rating of Fuses - 1 set
f) Thermistor assembly - 1
g) Ceramic filter - 1
h) Processor card - 1
i) Any Other card - 1
a) Rings and gasket - 2 set of each type
b) Sensor and Detector - 1 no.
c) Rotameter - 1 no.
d) Pressure Control Valve - 1 no.
Methane Analyser
3.2 e) Fuses - 5 sets
(Infrared)
f) Electronic card - 1no.
g) Other Aux. Cards - 1 each
h) Processor card and other electronic 1 no.
each.
3.3 Moisture Analyser a) Sensor and etector -1 no.
b) Electronic card - 1no. Each type
c) Fuses - 5 sets
< Security Level 2 >
ISSUED :
DOC.No. DHT Project Sheet 12 of 34
ISSUED :
DOC.No. DHT Project Sheet 13 of 34
ISSUED :
DOC.No. DHT Project Sheet 14 of 34
Notes:
1. Above-mentioned mandatory spares list definess the minimum requirement.
Contractor to provide any additional items as recommended by manufacturer.
Contractor to submit mandatory spares list to Owner / PMC for approval.
2. Similar philosophy shall be followed for packaged units and other items not covered
in this list.
3. Contractor to submit spares list for 2 year operation and maintenance. The prices
shall be valid for atleast 2 years from date of order.
4. Contractor shall supply all spare items required for commissioning.
5. Next rounded figure to be considered wherever % is specified.Example : For total
11 Nos. Instruments with 10 % spares basis, 2 Nos. spares shall be provided.
< Security Level 2 >
ISSUED :
DOC.No. DHT Project Sheet 15 of 34
4. Civil:
4.1. HV spary nozzles 10% of total nozzles used in each size/type with
minimum
Drill holes.
4.2. MV spray nozzles 10% of total nozzles used in each size/type with
minimum
Drill holes.
Notes:
1. The above no of spares are suggestive and minimum. In case the vendor
feels more are required / recommended by manufacturer, same shall be
provided and mentioned along the offer.
< Security Level 2 >
ISSUED :
DOC.No. DHT Project Sheet 16 of 34
5. Mechanical Rotary:
Sno. Description Quantity (Insurance Spares) Remarks
1 PUMPS:
1.1 Centrifugal Pumps (Process Service) a.One set of complete
replaceable inner case
element consisting of all
rotating and stationary
hydraulic elements (diffuser or
volutes etc.) (Only for multi-
stage centrifugal
barrel type pumps)
ISSUED :
DOC.No. DHT Project Sheet 17 of 34
ISSUED :
DOC.No. DHT Project Sheet 18 of 34
Remarks:
(1) Spare parts shall be identical in all respects to the parts fitted in the main equipment,
including dimension, material of construction and heat treatment.
(2) Spare rotors shall be supplied in metal container in vertical storage and with Nitrogen
blanketing.
(3) Specified quantity is total for one Item (Service), which remains same even if there are
many machines per Item ( for example: 90-P-01 A / B ). Same is also applicable
for ‘Commissioning spares (minimum)’ in below Table-3.
(4) Mandatory spares for Electrical and instrumentation shall be as specified in their
respective job specifications or as listed elsewhere in the tender documents.
ISSUED :
DOC.No. DHT Project Sheet 19 of 34
2 Reciprocating Pumps:
2.1 Set of diaphragms 200%
2.2 Set of Plunger packings 200%
Of Installed quantity
2.3 Suction / Discharge valve 100%
2.4 Set of all gaskets 100%
3 Vertical Pumps:
3.1 Set of intermediate bushes 100%
3.2 Set of gaskets 100% Of Installed quantity
3.3 Set of seal faces 100%
4 Reciprocating Compressors:
4.1 Set of valve cover gaskets / O-rings 100%
4.2 Set of Head gaskets 100%
4.3 Set of other gaskets 100%
Of Installed quantity
4.4 Set of valve plates for all stages 100%
4.5 Set of springs for valves 100%
4.6 Rod packings & wipers 100%
Note :- Specified commissioning spares herewith are minimum , and LSTK contractor shall ensure that
all required erection and commissioning spares for all equipments are supplied by the vendors.
< Security Level 2 >
ISSUED :
DOC.No. DHT Project Sheet 20 of 34
6. Mechanical Package:
2 Gaskets 100%
EJECTOR / EDUCTOR
SILENCER
1 Gaskets 100%
EOT CRANE
ISSUED :
DOC.No. DHT Project Sheet 21 of 34
2 Bearing 200%
STATIC MIXER
1 Gaskets 100%
LOADING ARM
WEIGH BRIDGE
2 Gaskets 100%
BAG FILTERS
ISSUED :
DOC.No. DHT Project Sheet 22 of 34
Note-1 : For Other bought out items such as pumps , motors , exchangers within package ,
mandatory spares shall be provided as per Mandatory spares list for respective items
attached elsewhere
< Security Level 2 >
ISSUED :
DOC.No. DHT Project Sheet 23 of 34
7. Fired Heater:
ISSUED :
DOC.No. DHT Project Sheet 24 of 34
8. Electrical:
1.0 Generator ( one set of spares for each rating One set
and type )
each
ISSUED :
DOC.No. DHT Project Sheet 25 of 34
b) Bus insulator 5%
b) Bus insulators 5%
ISSUED :
DOC.No. DHT Project Sheet 26 of 34
b) Bus insulators 5%
ISSUED :
DOC.No. DHT Project Sheet 27 of 34
b) Bus insulators 5%
b) Bus insulators 5%
type/rating
ISSUED :
DOC.No. DHT Project Sheet 28 of 34
all types
a) All cards such as input and out put cards, One set
power supply cards, processor cards etc.
ISSUED :
DOC.No. DHT Project Sheet 29 of 34
f) Cooling fans
c) Pressurization system
ISSUED :
DOC.No. DHT Project Sheet 30 of 34
14 MV induction motors
15 Telephone Exchange
b) DGFAP One No
f) Hammer 10%
ISSUED :
DOC.No. DHT Project Sheet 31 of 34
17 Paging System
ISSUED :
DOC.No. DHT Project Sheet 32 of 34
9. Fire Fighting:
1.2 Automatic and Manual release system One of each type / size used in the system
supplied
1.3 Cylinder valve with safet pressure One of each type / size used in the system
relief supplied
1.4 Clean agent nozzles 10% of total nozzles used in each size /
type with minimum drill holes.
1.5 Clean agent release push buttons 10% of total used of each type
ISSUED :