You are on page 1of 13

SHIFT SCH SCH OPRT IN/OUT TOT REST DUMMY WORK

SCHEDULE ==> SHIFT 1: 6.50 18.00 11.50 7.00 18.00 11.00 1.00 0.5 10.00
SHIFT 2 : 18.00 6.50 12.50 18.00 6.50 12.50 1.00 0 11.50
24.00 23.50 2.00 0.50 21.50
Plan Working Hours FOR O/B
Days Senin Selasa Rabu Kamis Jumat Sabtu Minggu TOTAL AVRG REMARK
Working Hrs. PAMA 19.93 19.93 19.93 19.93 18.93 19.93 19.93 138.48 19.78
Eff. WHRS Shift 1 8.99 8.99 8.99 8.99 7.99 8.99 8.99 61.94 8.85
Eff. WHRS Shift 2 10.93 10.93 10.93 10.93 10.93 10.93 10.93 76.53 10.93
Total lost time/day (min) 244.50 244.50 244.50 244.50 304.50 244.50 244.50 1771.50 253.07
Idle/Delay shift 1
- Change shift 30 30 30 30 30 30 30 210 30' pagi
- Wait Operator - - - - - - - -
- Over Capacity - - - - - - - -
- P2h - - - - - - - - D/S, P2H dilakukan pada saat change shift
- Tyre - - - - - - - -
- Lubricating & Refueling - - - - - - - -
- Move Equipment 3 3 3 3 3 3 3 21
- Wait Survey 0.5 0.5 0.5 0.5 0.5 0.5 0.5 4
- Wait Equipment 2 2 2 2 2 2 2 14
- Wait Blast 45 45 45 45 45 45 45 315 Blasting Jam 16 / 2days
- Rest 60 60 60 60 60 60 60 420
- Others -
- Praying/Sholat 10 10 10 10 70 10 10 130
Total lost time shift 1 150.5 150.5 150.5 150.5 210.5 150.5 150.5 1113.5 159.1
Idle/Delay shift 2.
- Change shift 15 15 15 15 15 15 15 105 Semi Hot Seat Change shift
- Wait Operator - - - - - - - -
- Over Capacity - - - - - - - -
- P2h - - - - - - - -
- Tyre - - - - - - - -
- Lubricating & Refueling - - - - - - - -
- Move Equipment 2 2 2 2 2 2 2 14
- Wait Survey - - - - - - - -
- Wait Equipment 2 2 2 2 2 2 2 14
- Wait Blast - - - - - - - -
- Rest 60 60 60 60 60 60 60 420
- Others - - - - - - - -
- Praying/Sholat 15 15 15 15 15 15 15 105
Total lost time shift 2 94.0 94.0 94.0 94.0 94.0 94.0 94.0 658.0 94.0

Idle/Delay Daily
- Change shift 45 45 45 45 45 45 45 315
- Wait Operator - - - - - - - -
- Over Capacity - - - - - - - -
- P2h - - - - - - - - D/S, P2H dilakukan pada saat change shift
- Tyre - - - - - - - -
- Lubricating & Refueling - - - - - - - -
- Move Equipment 5 5 5 5 5 5 5 35
- Wait Survey 0.5 0.5 0.5 0.5 0.5 0.5 0.5 4
- Wait Equipment 4 4 4 4 4 4 4 28
- Wait Blast 45 45 45 45 45 45 45 315
- Rest 120 120 120 120 120 120 120 840
- Others - - - - - - - -
- Praying/Sholat 25 25 25 25 85 25 25 235
Total lost time Daily (min) 244.50 244.50 244.50 244.50 304.50 244.50 244.50 1771.50 253.07
Total lost time Daily (Hours) 4.08 4.08 4.08 4.08 5.08 4.08 4.08 29.53 4.22
SHIFT SCH SCH OPRT IN/OUT TOT REST DUMMY WORK
SCHEDULE ==> SHIFT 1: 6.50 15.00 8.50 7.00 18.00 11.00 1.00 0.5 10.00
SHIFT 2 : 15.00 23.00 8.00 18.00 6.50 12.50 1.00 0 11.50
SHIFT 3 : 23.00 6.50 7.50
16.50 23.50 2.00 0.50 21.50
Plan Working Hours FOR O/B
Days Senin Selasa Rabu Kamis Jumat Sabtu Minggu TOTAL AVRG REMARK
Working Hrs. PAMA 20.23 20.23 20.23 20.23 18.86 20.23 20.23 140.21 20.03
Eff. WHRS Shift 1 7.53 7.53 7.53 7.53 6.16 7.53 7.53 51.31 7.33
Eff. WHRS Shift 2 6.17 6.17 6.17 6.17 6.17 6.17 6.17 43.17 6.17
Eff. WHRS Shift 3 6.53 6.53 6.53 6.53 6.53 6.53 6.53 45.73 6.53
Total lost time/day (min) 226.50 226.50 226.50 226.50 308.50 226.50 226.50 1667.50 238.21
Idle/Delay shift 1
- Change shift 5 5 5 5 5 5 5 35 Hot Seat Change shift
- Wait Operator - - - - - - - -
- Over Capacity - - - - - - - -
- P2h - - - - - - - -
- Tyre - - - - - - - -
- Lubricating & Refueling - - - - - - - -
- Move Equipment 3 3 3 3 3 3 3 21
- Wait Survey 0.5 0.5 0.5 0.5 0.5 0.5 0.5 4
- Wait Equipment 2 2 2 2 2 2 2 14
- Wait Blast - - - - - - - -
- Rest 30 30 30 30 50 30 30 230
- Others 10 10 10 10 10 10 10 70
- Praying/Sholat 8 8 8 8 70 8 8 118 Jum'atan
Total lost time shift 1 58.5 58.5 58.5 58.5 140.5 58.5 58.5 491.5 70.2
Idle/Delay shift 2.
- Change shift 5 5 5 5 5 5 5 35 Hot Seat Change shift
- Wait Operator - - - - - - - -
- Over Capacity - - - - - - - -
- P2h - - - - - - - -
- Tyre - - - - - - - -
- Lubricating & Refueling - - - - - - - -
- Move Equipment 2 2 2 2 2 2 2 14
- Wait Survey - - - - - - - -
- Wait Equipment 2 2 2 2 2 2 2 14
- Wait Blast 45 45 45 45 45 45 45 315
- Rest 30 30 30 30 30 30 30 210
- Others 10 10 10 10 10 10 10 70
- Praying/Sholat 16 16 16 16 16 16 16 112 Ashar , Isyak
Total lost time shift 2 110.0 110.0 110.0 110.0 110.0 110.0 110.0 770.0 110.0
Idle/Delay shift 3
- Change shift 5 5 5 5 5 5 5 35 Hot Seat Change shift
- Wait Operator - - - - - - - -
- Over Capacity - - - - - - - -
- P2h - - - - - - - -
- Tyre - - - - - - - -
- Lubricating & Refueling - - - - - - - -
- Move Equipment 3 3 3 3 3 3 3 21
- Wait Survey - - - - - - - -
- Wait Equipment 2 2 2 2 2 2 2 14
- Wait Blast - - - - - - - -
- Rest 30 30 30 30 30 30 30 210
- Others 10 10 10 10 10 10 10 70
- Praying/Sholat 8 8 8 8 8 8 8 56 Subuh
Total lost time shift 3 58.0 58.0 58.0 58.0 58.0 58.0 58.0 406.0 58.0

Idle/Delay Daily
- Change shift 15 15 15 15 15 15 15 105
- Wait Operator - - - - - - - -
- Over Capacity - - - - - - - -
- P2h - - - - - - - - D/S, P2H dilakukan pada saat change shift
- Tyre - - - - - - - -
- Lubricating & Refueling - - - - - - - -
- Move Equipment 8 8 8 8 8 8 8 56
- Wait Survey 0.5 0.5 0.5 0.5 0.5 0.5 0.5 4
- Wait Equipment 6 6 6 6 6 6 6 42
- Wait Blast 45 45 45 45 45 45 45 315
- Rest 90 90 90 90 110 90 90 650
- Others 30 30 30 30 30 30 30 210
- Praying/Sholat 32 32 32 32 94 32 32 286
Total lost time Daily (min) 226.50 226.50 226.50 226.50 308.50 226.50 226.50 1667.50 238.21
Total lost time Daily (Hours) 3.78 3.78 3.78 3.78 5.14 3.78 3.78 27.79 3.97
SHIFT SCH SCH OPRT IN/OUT TOT REST DUMMY WORK
SCHEDULE ==> SHIFT 1: 6.50 18.00 11.50 7.00 17.50 10.50 1.00 1.5 9.50
SHIFT 2 : 18.00 6.50 12.50 19.50 6.50 11.00 1.00 1.5 10.00
24.00 2.00 3.00 19.50
Plan Working Hours FOR O/B
Days Senin Selasa Rabu Kamis Jumat Sabtu Minggu TOTAL AVRG REMARK
Working Hrs. PAMA 17.85 17.85 17.85 17.85 16.85 17.85 17.85 123.95 17.71
Eff. WHRS Shift 1 8.52 8.52 8.52 8.52 7.52 8.52 8.52 58.62 131.76
Eff. WHRS Shift 2 9.33 9.33 9.33 9.33 9.33 9.33 9.33 65.33 191.49
Total lost time/day (min) 369.0 369.0 369.0 369.0 429.0 369.0 369.0 2,643.0 251.7
Total lost time shift 1 179.0 179.0 179.0 179.0 239.0 179.0 179.0 1,313.0 188.8
Total lost time shift 2 190.0 190.0 190.0 190.0 190.0 190.0 190.0 1,330.0 125.0
Idle shift 1
- Change shift 60 60 60 60 60 60 60 420 30' pagi dan 30' sore
- No Job - - - - - - - -
- No Operator 3 3 3 3 3 3 3 21
- No Required - - - - - - - -
- Hujan - - - - - - - -
Delays shift 1 0
- P2h - - - - - - - -
- Tyre - - - - - - - -
- Lubricating & Refuel - - - - - - - -
- Move equipment 5 5 5 5 5 5 5 35
- Wait. Survey 1 1 1 1 1 1 1 7
- Wait. Unit 2 2 2 2 2 2 2 14
- Wait. Blast 30 30 30 30 30 30 30 210
- Rest 60 60 60 60 60 60 60 420
Others 10 10 10 10 10 10 10 70 Terlambat start dan parkir cepat, dll
- Praying 8 8 8 8 68 8 8 116
Idle shift 2. -
- Change shift 90 90 90 90 90 90 90 630 Jam 18.00 - 19.30 kosong
- No Job - - - - - - - -
- No Op - - - - - - - -
- No Ne - - - - - - - -
- Hujan - - - - - - - -
Delays shift 2
- P2h 3 3 3 3 3 3 3 21
- Tyre - - - - - - - -
- Lubricating & Refuel - - - - - - - -
- Move. 5 5 5 5 5 5 5 35
- Wait. Survey - - - - - - - -
- Wait. Unit 2 2 2 2 2 2 2 14
- Wait. Blast - - - - - - - -
- Rest 60 60 60 60 60 60 60 420
Others 15 15 15 15 15 15 15 105 Terlambat start dan parkir cepat, dll
- Praying 15 15 15 15 15 15 15 105
SHIFT SCH SCH OPRT IN/OUT TOT REST DUMMY WORK
SCHEDULE ==> SHIFT 1: 6.50 15.00 8.50 7.00 18.00 11.00 1.00 0.5 10.00
SHIFT 2 : 15.00 23.00 8.00 18.00 6.50 12.50 1.00 0 11.50
SHIFT 3 : 23.00 6.50 7.50
16.50 23.50 2.00 0.50 21.50
Plan Working Hours FOR O/B
Days Senin Selasa Rabu Kamis Jumat Sabtu Minggu TOTAL AVRG REMARK
Working Hrs. PAMA 20.48 20.48 20.48 20.48 18.98 20.48 20.48 141.83 20.26
Eff. WHRS Shift 1 7.16 7.16 7.16 7.16 5.66 7.16 7.16 48.61 6.94
Eff. WHRS Shift 2 6.77 6.77 6.77 6.77 6.77 6.77 6.77 47.37 6.77
Eff. WHRS Shift 3 6.55 6.55 6.55 6.55 6.55 6.55 6.55 45.85 6.55
Total lost time/day (min) 211.50 211.50 211.50 211.50 301.50 211.50 211.50 1570.50 224.36
Idle/Delay shift 1
- Change shift 5 5 5 5 5 5 5 35 Hot Seat Change shift
- Wait Operator - - - - - - - -
- Over Capacity - - - - - - - -
- P2h - - - - - - - -
- Tyre - - - - - - - -
- Lubricating & Refueling - - - - - - - -
- Move Equipment 3 3 3 3 3 3 3 21
- Wait Survey 0.5 0.5 0.5 0.5 0.5 0.5 0.5 4
- Wait Equipment 2 2 2 2 2 2 2 14
- Wait Blast 30 30 30 30 30 30 30 210
- Rest 30 30 30 30 50 30 30 230
- Others 10 10 10 10 10 10 10 70
- Praying/Sholat 70 70
Total lost time shift 1 80.5 80.5 80.5 80.5 170.5 80.5 80.5 653.5 93.4
Idle/Delay shift 2.
- Change shift 5 5 5 5 5 5 5 35 Hot Seat Change shift
- Wait Operator - - - - - - - -
- Over Capacity - - - - - - - -
- P2h - - - - - - - -
- Tyre - - - - - - - -
- Lubricating & Refueling - - - - - - - -
- Move Equipment 3 3 3 3 3 3 3 21
- Wait Survey - - - - - - - -
- Wait Equipment 2 2 2 2 2 2 2 14
- Wait Blast - - - - - - - -
- Rest 30 30 30 30 30 30 30 210
- Others 10 10 10 10 10 10 10 70
- Praying/Sholat 24 24 24 24 24 24 24 168 Ashar ,maghrib, Isyak
Total lost time shift 2 74.0 74.0 74.0 74.0 74.0 74.0 74.0 518.0 74.0
Idle/Delay shift 3
- Change shift 5 5 5 5 5 5 5 35 Hot Seat Change shift
- Wait Operator - - - - - - - -
- Over Capacity - - - - - - - -
- P2h - - - - - - - -
- Tyre - - - - - - - -
- Lubricating & Refueling - - - - - - - -
- Move Equipment 2 2 2 2 2 2 2 14
- Wait Survey - - - - - - - -
- Wait Equipment 2 2 2 2 2 2 2 14
- Wait Blast - - - - - - - -
- Rest 30 30 30 30 30 30 30 210
- Others 10 10 10 10 10 10 10 70
- Praying/Sholat 8 8 8 8 8 8 8 56 Subuh
Total lost time shift 3 57.0 57.0 57.0 57.0 57.0 57.0 57.0 399.0 57.0

Idle/Delay Daily
- Change shift 15 15 15 15 15 15 15 105
- Wait Operator - - - - - - - -
- Over Capacity - - - - - - - -
- P2h - - - - - - - - D/S, P2H dilakukan pada saat change shift
- Tyre - - - - - - - -
- Lubricating & Refueling - - - - - - - -
- Move Equipment 8 8 8 8 8 8 8 56
- Wait Survey 0.5 0.5 0.5 0.5 0.5 0.5 0.5 4
- Wait Equipment 6 6 6 6 6 6 6 42
- Wait Blast 30 30 30 30 30 30 30 210
- Rest 90 90 90 90 110 90 90 650
- Others 30 30 30 30 30 30 30 210
- Praying/Sholat 32 32 32 32 102 32 32 294
Total lost time Daily (min) 211.50 211.50 211.50 211.50 301.50 211.50 211.50 1570.50 224.36
Total lost time Daily (Hours) 3.53 3.53 3.53 3.53 5.03 3.53 3.53 26.18 3.74
BENDILI
LOCATION :
PT. Pamapersada Nusantara WEEKLY PLAN
PAMA DISTRICT KPCS Period : 1-Dec 3-Dec Rev. :0 Pencapaian produksi sampai dengan :
TARGET Diskripsi unit Target Realisasi +/-
Total hari bulan ini 31 hari Target O/B bulan ini 5,021,524 Bcm Month to Date (OB) Bcm
Perkiraan jam hujan, licin & kabut bulan ini 100 jam Target O/B minggu ini 452,224 Bcm
Perkiraan hari efektif bulan ini 26.8 hari Target T/S minggu ini 37,444 Bcm Last week (OB) Bcm
Rencana jam kerja minggu ini 47.2 jam Target CO minggu ini 46,805 Bcm
O/B ACTIVITIES PA Hauling BCM 1000 EQUIP EQUIP TOT TOT +/- 92%
ID PIT DUMP Plan REMARK
Unit C/N Q'ty Pd'ty (%) Dist. (km) 1-Dec 2-Dec 3-Dec Total RUNNING TYPE SETT EXIST
PC5500 SH4001 1 1800 92.0% Block W (irs) 18.9 20.2 20.2 59.3 1.0 PC5500 2 2 - 1.8
H730E 3 SHIFT 10 175 92.0% Strip PANEL 1 3.50 Prod 33.95 36.41 36.41 106.8 1 Red 10.3 PC4000 2 3 1.0 2.8
HD1500 - 156 92.0% RL 40, 50 150 W (ers) 15.0 16.1 16.1 47.2 1 Red - PC3000 2 4 2.0 3.7
KIJANG Prod 27.03 28.99 28.99 85.01 - PC1250 6 7 1.0 6.4
PC5500 SH4002 1 1800 92.0% Block W (irs) 18.9 20.2 20.2 59.3 1.0 PC750 2 2 - 1.8
H730E 3 SHIFT 4 182 92.0% Strip PANEL 3 3.30 Prod 33.95 36.41 36.41 106.8 1 Red 4.0 PC300 - 3 3.0 2.8
HD1500 7 152 92.0% RL 70, 80,90 90 W (ers) 15.0 16.1 16.1 47.2 1 Red 7.1 H730E 14 15 0.7 13.8
K10 Prod 27.03 28.99 28.99 85.01 - HD1500 14 25 11.5 23.0
PC4000 SH304 Block W (irs) - - - - - HD465 - - - -
HD1500 Strip Prod - - - - - A40_HM 11 14 3.4 12.9
HD785 RL W (ers) - - - - - HD785 61 68 6.7 63.9
Prod - - - - - HD785-CB 10 11 1.0 10.1
PC4000 SH305 1 1350 90.0% Block W (irs) 18.9 19.9 19.9 58.8 1.0 HD785-BT - - -
HD1500 156 90.0% Strip PANEL 05 3.30 Prod 25.55 26.90 26.90 79.3 -
HD785 14 96 90.0% RL 140,150 30 W (ers) 14.7 15.5 15.5 45.8 1 Red 14.0
BADAK Prod 19.90 20.95 20.95 61.81 -
PC4000 SH306 1 1350 90.0% Block W (irs) 18.9 19.9 19.9 58.8 1.0
HD1500 150 90.0% Strip Panel 2 3.50 Prod 25.55 26.90 26.90 79.3 -
HD785 13 102 90.0% RL 40 ,50 150 W (ers) 14.7 15.5 15.5 45.8 NORED 13.2
KIJANG Prod 19.90 20.95 20.95 61.81 -
PC3000 EX708 Block W (irs) - -
HD1500 Strip Prod - -
HD785 RL W (ers) - -
Prod - -
PC3000 EX709 1 950 91.0% Block W (irs) 18.9 19.9 19.9 58.8 1.0
HD1500 152 91.0% Strip PANEL 05 3.30 Prod 17.98 18.93 18.93 55.8 1 Red -
HD785 10 94 91.0% RL 140,150 30 W (ers) 14.9 15.7 15.7 46.3 10.1
BADAK Prod 14.16 14.91 14.91 43.98 -
PC3000 EX710 Block W (irs) - -
HD1500 Strip PANEL 03 3.30 Prod - -
HD785 RL 80,90 30 W (ers) - -
BADAK Prod - -
PC3000 EX711 1 950 91.0% Block W (irs) 18.9 20.2 20.2 59.3 1.0
HD1500 3 SHIFT 6 147 91.0% Strip PANEL 1 3.50 Prod 17.92 19.21 19.21 56.3 6.5
HD785 - 90 91.0% RL 40,50,60 150 W (ers) 14.9 15.9 15.9 46.7 1 Red -
KIJANG Prod 14.11 15.13 15.13 44.38 -
PC1250 EX1001 1 500 92.0% Block W (irs) 18.9 19.9 19.9 58.8 1.0
HD785 6 90 92.0% Strip PANEL 05 3.00 Prod 9.46 9.96 9.96 29.4 1 Red 5.6
RL 140,150 90 W (ers) 15.1 15.9 15.9 46.8 ` -
K10 Prod 7.54 7.93 7.93 23.40 -
PC1250 EX1006 Block W (irs) - - - -
HD785 Strip Prod - - - - 1 Red
RL W (ers) - - - -
Prod - - - -
PC1250 EX1008 Block W (irs) - - - -
HD785 Strip Prod - - - - 1 Red
RL W (ers) - - - -
Prod - - - -
PC1250 EX1013 1 500 92.0% Block W (irs) 18.9 19.9 19.9 58.8
HD785 5 101 92.0% Strip PANEL 3,4 3.50 Prod 9.46 9.96 9.96 29.4 NORED
RL 100,110,140 90 W (ers) 15.1 15.9 15.9 46.8
K10 Prod 7.54 7.93 7.93 23.40
PC1250 EX1014 1 500 92.0% Block W (irs) 18.9 19.9 19.9 58.8
HD785 5 101 92.0% Strip PANEL 1,2 3.50 Prod 9.46 9.96 9.96 29.4
RL 40,50,60 150 W (ers) 15.1 15.9 15.9 46.8 NORED
KIJANG Prod 7.54 7.93 7.93 23.40
Subtot. Prod (icld. Rain & slippery), BCM - - - - 183.27 194.64 194.64 572.54
Subtot. Prod (excl. rain & slippery), BCM - - - - 144.75 153.74 153.74 452.22 -
TOP SOIL ACTIVITIES PA Hauling BCM 1000
ID PIT DUMP Plan REMARK
Unit C/N Q'ty Pd'ty (%) Dist. (km) 30-Dec 30-Dec 30-Dec 1-Dec 2-Dec 3-Dec Total
PC750 EX577 1 300 92.0% Block W (irs) 18.9 19.9 19.9 58.8 1.0
HD785 4 85 92.0% Strip 2.80 Prod 5.68 5.98 5.98 17.6 3.5
` - 28 92.0% RL W (ers) 15.1 15.9 15.9 46.8 -
Prod 4.52 4.76 4.76 14.04 -
PC750 EX578 1 300 92.0% Block W (irs) 18.9 19.9 19.9 58.8
A40_HM 11 28 92.0% Strip 2.80 Prod 5.68 5.98 5.98 17.6
RL W (ers) 15.1 15.9 15.9 46.8
Prod 4.52 4.76 4.76 14.04
PC1250 EX1006 1 500 92.0% Block W (irs) 18.9 19.9 19.9 58.8
HD785 5 102 92.0% Strip 2.80 Prod 9.46 9.96 9.96 29.4
RL W (ers) 15.1 15.9 15.9 46.8
Prod 7.54 7.93 7.93 23.40 68
Subtot. Prod (icld. Rain & slippery), BCM - - - - 20.82 21.92 21.92 47.02
Subtot. Prod (excl. rain & slippery), BCM - - - - 16.58 17.45 17.45 37.44
COAL ACTIVITIES PA Hauling BCM 1000
ID PIT DUMP Plan REMARK
Unit C/N Q'ty Pd'ty (%) Dist. (km) 30-Dec 30-Dec 30-Dec 1-Dec 2-Dec 3-Dec Total
PC1250 EX1002 1 500 92.0% Block W (irs) 18.9 19.9 19.9 58.8 1.0
HD785-CB 5 107 92.0% Strip 8.00 Prod 9.46 9.96 9.96 29.4 5.0
HD785 RL W (ers) 15.1 15.9 15.9 46.8 -
ROM/Crusher Prod 7.54 7.93 7.93 23.40 -
PC1250 EX1004 1 500 92.0% Block W (irs) 18.9 19.9 19.9 58.8
HD785-CB 5 107 92.0% Strip 8.00 Prod 9.46 9.96 9.96 29.39
HD785 77 92.0% RL W (ers) 15.1 15.9 15.9 46.8
ROM/Crusher Prod 7.54 7.93 7.93 23.40
Subtot. Prod (icld. Rain & slippery), BCM - - - - 18.93 19.93 19.93 58.78
Subtot. Prod (excl. rain & slippery), BCM - - - - 15.07 15.87 15.87 46.81
OTHER ACTIVITY
Activity Unit Type C/N PA Description Activity Type C/N PA
Dozing D375A-5 DZ367 90% Road GD825A-2 GR320 92%
DZ368 90% Maint'ce GR321 92%
DZ369 90% GR322 92%
D155 DZ278 90% GR404 92%
D7G/D85SS DZ015 90% GR405 92%
DZ016 90% Compactor CP300 90%
Drilling REDRILL DR041 90% TJCP006
DR042 90%
DR052 Spraying HD785-5(WT) DT791 90%
Spread D375A-5 DZ372 90% HD785-3(WT) DT603 90%
Disposal DZ373 90% HD785-3(WT) DT602 90%
DZ374 90% 320B/PC200 KPTJEX001 90%
DZ375 90% General KPTJEX007 90%
D279 EX429 90%
EX430 90%
Soil WD D85SS DZ05 90% D155A2 DZ264 90%
DZ264 Landclearing D7G/D85SS TJDZ012 90%
TJDZ005 90%
TJDZ008 90%

Disepakati bersama : Cat. :1.

Eng. Dept Head Prod. Dept Head Plant Dept. Head

//17009/D:/376633201.xls/WK#01/01/15/2018
BENDILI
LOCATION :
PT. Pamapersada Nusantara WEEKLY PLAN
PAMA DISTRICT KPCS Period : 4-Dec to 10-Dec Rev. :0 Pencapaian produksi sampai dengan :
TARGET Diskripsi unit Target Realisasi +/-
Total hari bulan ini 31 hari Target O/B bulan ini 5,021,524 Bcm Month to Date (OB) Bcm
Perkiraan jam hujan, licin & kabut bulan ini 100 jam Target O/B minggu ini 1,067,172 Bcm
Perkiraan hari efektif bulan ini 26.8 hari Target T/S minggu ini 121,301 Bcm Last week (OB) Bcm
Rencana jam kerja minggu ini 111.7 jam Target CO minggu ini 110,274 Bcm
O/B ACTIVITIES PA Hauling BCM 1000 EQUIP EQUIP TOT TOT +/- 92%
ID PIT DUMP Plan REMARK
Unit C/N Q'ty Pd'ty (%) Dist. (km) 4-Dec 5-Dec 6-Dec 7-Dec 8-Dec 9-Dec 10-Dec Total RUNNING TYPE SETT EXIST
1,800 PC5500 SH4001 1 1800 92.0% Block W (irs) 20.2 20.2 20.2 20.2 18.9 20.2 20.2 140.2 1.0 PC5500 2 2 - 1.8
H730E 3 SHIFT 10 175 92.0% Strip PANEL 1 3.50 Prod 36.41 36.41 36.41 36.41 33.95 36.41 36.41 252.4 10.3 PC4000 2 3 1.0 2.8
HD1500 - 156 92.0% RL 40, 50 150 W (ers) 16.1 16.1 16.1 16.1 15.0 16.1 16.1 111.7 - PC3000 2 4 2.0 3.7
OB KIJANG Prod 28.99 28.99 28.99 28.99 27.03 28.99 28.99 200.98 - PC1250 6 7 1.0 6.4
1,800 PC5500 SH4002 1 1800 92.0% Block W (irs) 20.2 20.2 20.2 20.2 18.9 20.2 20.2 140.2 1.0 PC750 2 2 - 1.8
H730E 3 SHIFT 4 182 92.0% Strip PANEL 3 3.30 Prod 36.41 36.41 36.41 36.41 33.95 36.41 36.41 252.4 4.0 PC300 - 3 3.0 2.8
HD1500 7 152 92.0% RL 70, 80,90 90 W (ers) 16.1 16.1 16.1 16.1 15.0 16.1 16.1 111.7 7.1 H730E 14 15 0.7 13.8
OB K10 Prod 28.99 28.99 28.99 28.99 27.03 28.99 28.99 200.98 - HD1500 14 25 11.5 23.0
- PC4000 SH304 Block W (irs) - - - - - - - - - HD465 - - - -
#DIV/0! HD1500 Strip Prod - - - - - - - - - A40_HM 11 14 3.4 12.9
#DIV/0! HD785 RL W (ers) - - - - - - - - - HD785 61 68 6.7 63.9
OB Prod - - - - - - - - - HD785-CB 10 11 1.0 10.1
1,350 PC4000 SH305 1 1350 90.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 19.9 138.5 1.0 HD785-BT - - -
21.5 HD1500 156 90.0% Strip PANEL 05 3.30 Prod 26.90 26.90 26.90 26.90 25.55 26.90 26.90 186.9 -
23.7 HD785 14 96 90.0% RL 140,150 30 W (ers) 15.5 15.5 15.5 15.5 14.7 15.5 15.5 107.9 14.0
OB BADAK Prod 20.95 20.95 20.95 20.95 19.90 20.95 20.95 145.63 -
1,350 PC4000 SH306 1 1350 90.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 19.9 138.5 1.0
HD1500 150 90.0% Strip Panel 2 3.50 Prod 26.90 26.90 26.90 26.90 25.55 26.90 26.90 186.9 -
22.4 HD785 13 102 90.0% RL 40 ,50 150 W (ers) 15.5 15.5 15.5 15.5 14.7 15.5 15.5 107.9 13.2
OB KIJANG Prod 20.95 20.95 20.95 20.95 19.90 20.95 20.95 145.63 -
- PC3000 EX708 Block W (irs) - -
HD1500 Strip Prod - -
#DIV/0! HD785 RL W (ers) - -
Prod - -
950 PC3000 EX709 1 950 91.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 19.9 138.5 1.0
HD1500 152 91.0% Strip PANEL 05 3.30 Prod 18.93 18.93 18.93 18.93 17.98 18.93 18.93 131.6 -
24.3 HD785 10 94 91.0% RL 140,150 30 W (ers) 15.7 15.7 15.7 15.7 14.9 15.7 15.7 109.1 10.1
BADAK Prod 14.91 14.91 14.91 14.91 14.16 14.91 14.91 103.62 -
- PC3000 EX710 Block W (irs) - -
HD1500 Strip PANEL 03 3.30 Prod - -
HD785 RL 80,90 30 W (ers) - -
BADAK Prod - -
950 PC3000 EX711 1 950 91.0% Block W (irs) 20.2 20.2 20.2 20.2 18.9 20.2 20.2 140.2 1.0
HD1500 3 SHIFT 6 147 91.0% Strip PANEL 1 3.50 Prod 19.21 19.21 19.21 19.21 17.92 19.21 19.21 133.2 6.5
HD785 - 90 91.0% RL 40,50,60 150 W (ers) 15.9 15.9 15.9 15.9 14.9 15.9 15.9 110.4 -
KIJANG Prod 15.13 15.13 15.13 15.13 14.11 15.13 15.13 104.92 -
500 PC1250 EX1001 1 500 92.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 19.9 138.5 1.0
HD785 6 90 92.0% Strip PANEL 05 3.00 Prod 9.96 9.96 9.96 9.96 9.46 9.96 9.96 69.2 5.6
RL 140,150 90 W (ers) 15.9 15.9 15.9 15.9 15.1 15.9 15.9 110.3 -
K10 Prod 7.93 7.93 7.93 7.93 7.54 7.93 7.93 55.14 -
- PC1250 EX1006 Block W (irs) - - - - - - - - -
HD785 Strip Prod - - - - - - - - -
RL W (ers) - - - - - - - - -
Prod - - - - - - - - -
- PC1250 EX1008 Block W (irs) - - - - - - - - -
HD785 Strip Prod - - - - - - - - -
RL W (ers) - - - - - - - - -
Prod - - - - - - - - -
500 PC1250 EX1013 1 500 92.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 19.9 138.5 1.0
HD785 5 101 92.0% Strip PANEL 3,4 3.50 Prod 9.96 9.96 9.96 9.96 9.46 9.96 9.96 69.2 5.0
RL 100,110,140 90 W (ers) 15.9 15.9 15.9 15.9 15.1 15.9 15.9 110.3 -
K10 Prod 7.93 7.93 7.93 7.93 7.54 7.93 7.93 55.14 -
500 PC1250 EX1014 1 500 92.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 19.9 138.5 1.0
HD785 5 101 92.0% Strip PANEL 1,2 3.50 Prod 9.96 9.96 9.96 9.96 9.46 9.96 9.96 69.2 5.0
RL 40,50,60 150 W (ers) 15.9 15.9 15.9 15.9 15.1 15.9 15.9 110.3 -
KIJANG Prod 7.93 7.93 7.93 7.93 7.54 7.93 7.93 55.14 -
Subtot. Prod (icld. Rain & slippery), BCM 194.64 194.64 194.64 194.64 183.27 194.64 194.64 1,351.09
Subtot. Prod (excl. rain & slippery), BCM 153.74 153.74 153.74 153.74 144.75 153.74 153.74 1,067.17 -
TOP SOIL ACTIVITIES PA Hauling BCM 1000
ID PIT DUMP Plan REMARK
Unit C/N Q'ty Pd'ty (%) Dist. (km) 4-Dec 5-Dec 6-Dec 7-Dec 8-Dec 9-Dec 10-Dec Total
300 PC750 EX577 1 300 92.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 19.9 138.5 1.0
HD785 4 85 92.0% Strip 2.80 Prod 5.98 5.98 5.98 5.98 5.68 5.98 5.98 41.54 3.5
` - 28 92.0% RL W (ers) 15.9 15.9 15.9 15.9 15.1 15.9 15.9 110.3 -
Prod 4.76 4.76 4.76 4.76 4.52 4.76 4.76 33.08 -
PC750 EX578 1 300 92.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 19.9 138.5
A40_HM 11 28 92.0% Strip 2.80 Prod 5.98 5.98 5.98 5.98 5.68 5.98 5.98 41.54
RL W (ers) 15.9 15.9 15.9 15.9 15.1 15.9 15.9 110.3
Prod 4.76 4.76 4.76 4.76 4.52 4.76 4.76 33.08
500 PC1250 EX1006 1 500 92.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 19.9 138.5 1.0
HD785 5 102 92.0% Strip 2.80 Prod 9.96 9.96 9.96 9.96 9.46 9.96 9.96 69.24 4.9
RL W (ers) 15.9 15.9 15.9 15.9 15.1 15.9 15.9 110.3 -
Prod 7.93 7.93 7.93 7.93 7.54 7.93 7.93 55.14 -
Subtot. Prod (icld. Rain & slippery), BCM 21.92 21.92 21.92 21.92 20.82 21.92 21.92 152.32
Subtot. Prod (excl. rain & slippery), BCM 17.45 17.45 17.45 17.45 16.58 17.45 17.45 121.30
COAL ACTIVITIES PA Hauling BCM 1000
ID PIT DUMP Plan REMARK
Unit C/N Q'ty Pd'ty (%) Dist. (km) 4-Dec 5-Dec 6-Dec 7-Dec 8-Dec 9-Dec 10-Dec Total
536 PC1250 EX1002 1 500 92.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 19.9 138.5 1.0
HD785-CB 5 107 92.0% Strip 8.00 Prod 9.96 9.96 9.96 9.96 9.46 9.96 9.96 69.24 5.0
HD785 RL W (ers) 15.9 15.9 15.9 15.9 15.1 15.9 15.9 110.3 -
ROM/Crusher Prod 7.93 7.93 7.93 7.93 7.54 7.93 7.93 55.14 -
536 PC1250 EX1004 1 500 92.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 19.9 138.5 1.0
HD785-CB 5 107 92.0% Strip 8.00 Prod 9.96 9.96 9.96 9.96 9.46 9.96 9.96 69.24 5.0
HD785 77 92.0% RL W (ers) 15.9 15.9 15.9 15.9 15.1 15.9 15.9 110.3 -
ROM/Crusher Prod 7.93 7.93 7.93 7.93 7.54 7.93 7.93 55.14 -
Subtot. Prod (icld. Rain & slippery), BCM 19.93 19.93 19.93 19.93 18.93 19.93 19.93 138.48
Subtot. Prod (excl. rain & slippery), BCM 15.87 15.87 15.87 15.87 15.07 15.87 15.87 110.27
OTHER ACTIVITY
Activity Unit Type C/N PA Description Activity Type C/N PA
Dozing D375A-5 DZ367 90% Road GD825A-2 GR320 92%
DZ368 90% Maint'ce GR321 92%
DZ369 90% GR322 92%
D7G/D85SS DZ121 90% GR404 92%
DZ120 90% GR405 92%
Compactor CP300 90%
Drilling REDRILL DR041 90% TJCP006
DR042 90%
DR052 Spraying HD785-5(WT) DT791 90%
Spread D375A-5 DZ372 90% HD785-3(WT) DT603 90%
Disposal DZ373 90% HD785-3(WT) DT602 90%
DZ374 90% 320B/PC200 KPTJEX001 90%
DZ375 90% General KPTJEX007 90%
D279 EX429 90%
EX430 90%
Soil WD D85SS DZ122 90% D155A2 DZ264 90%
Landclearing D7G/D85SS TJDZ012 90%
TJDZ005 90%
TJDZ008 90%

Disepakati bersama : Cat. :1.

Eng. Dept Head Prod. Dept Head Plant Dept. Head

//17009/D:/376633201.xls/WK#02/01/15/2018
BENDILI
LOCATION :
PT. Pamapersada Nusantara WEEKLY PLAN
PAMA DISTRICT KPCS Period : 11-Dec to 17-Dec Rev. :0 Pencapaian produksi sampai dengan :
TARGET Diskripsi unit Target Realisasi +/-
Total hari bulan ini 31 hari Target O/B bulan ini 5,021,524 Bcm Month to Date (OB) Bcm
Perkiraan jam hujan, licin & kabut bulan ini 100 jam Target O/B minggu ini 1,067,172 Bcm
Perkiraan hari efektif bulan ini 26.8 hari Target T/S minggu ini 115,518 Bcm Last week (OB) Bcm
Rencana jam kerja minggu ini 111.7 jam Target CO minggu ini 110,274 Bcm
O/B ACTIVITIES PA Hauling BCM 1000 EQUIP EQUIP TOT TOT +/- 92%
ID PIT DUMP Plan REMARK
Unit C/N Q'ty Pd'ty (%) Dist. (km) 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec Total RUNNING TYPE SETT EXIST
PC5500 SH4001 1 1800 92.0% Block W (irs) 20.2 20.2 20.2 20.2 18.9 20.2 20.2 140.2 1.0 PC5500 2 2 - 1.8
H730E 3 SHIFT 10 175 92.0% Strip PANEL 1 3.50 Prod 36.41 36.41 36.41 36.41 33.95 36.41 36.41 252.4 1 Red 10.3 PC4000 2 3 1.0 2.8
HD1500 - 156 92.0% RL 40, 50 150 W (ers) 16.1 16.1 16.1 16.1 15.0 16.1 16.1 111.7 - PC3000 2 4 2.0 3.7
KIJANG Prod 28.99 28.99 28.99 28.99 27.03 28.99 28.99 200.98 - PC1250 6 7 1.0 6.4
PC5500 SH4002 1 1800 92.0% Block W (irs) 20.2 20.2 20.2 20.2 18.9 20.2 20.2 140.2 1.0 PC750 2 2 - 1.8
H730E 3 SHIFT 4 182 92.0% Strip PANEL 3 3.30 Prod 36.41 36.41 36.41 36.41 33.95 36.41 36.41 252.4 4.0 PC300 - 3 3.0 2.8
HD1500 7 152 92.0% RL 70, 80,90 90 W (ers) 16.1 16.1 16.1 16.1 15.0 16.1 16.1 111.7 1 Red 7.1 H730E 14 15 0.7 13.8
K10 Prod 28.99 28.99 28.99 28.99 27.03 28.99 28.99 200.98 - HD1500 14 25 11.5 23.0
PC4000 SH304 Block W (irs) - - - - - - - - - HD465 - - - -
HD1500 Strip Prod - - - - - - - - 0 Red - A40_HM 11 14 3.4 12.9
HD785 RL W (ers) - - - - - - - - 1 Red - HD785 61 68 6.7 63.9
Prod - - - - - - - - - HD785-CB 10 11 1.0 10.1
PC4000 SH305 1 1350 90.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 19.9 138.5 1.0 HD785-BT - - - -
HD1500 156 90.0% Strip PANEL 05 3.30 Prod 26.90 26.90 26.90 26.90 25.55 26.90 26.90 186.9 0Red - 55.44
HD785 14 96 90.0% RL 140,150 30 W (ers) 15.5 15.5 15.5 15.5 14.7 15.5 15.5 107.9 0Red 14.0
BADAK Prod 20.95 20.95 20.95 20.95 19.90 20.95 20.95 145.63 -
PC4000 SH306 1 1350 90.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 19.9 138.5 1.0
HD1500 150 90.0% Strip Panel 2 3.50 Prod 26.90 26.90 26.90 26.90 25.55 26.90 26.90 186.9 -
HD785 13 102 90.0% RL 40 ,50 150 W (ers) 15.5 15.5 15.5 15.5 14.7 15.5 15.5 107.9 0Red 13.2
KIJANG Prod 20.95 20.95 20.95 20.95 19.90 20.95 20.95 145.63 -
PC3000 EX708 Block W (irs) - -
HD1500 Strip Prod - -
HD785 RL W (ers) - 1 Red -
Prod - -
PC3000 EX709 1 950 91.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 19.9 138.5 1.0
HD1500 152 91.0% Strip PANEL 05 3.30 Prod 18.93 18.93 18.93 18.93 17.98 18.93 18.93 131.6 -
HD785 10 94 91.0% RL 140,150 30 W (ers) 15.7 15.7 15.7 15.7 14.9 15.7 15.7 109.1 1 Red 10.1
BADAK Prod 14.91 14.91 14.91 14.91 14.16 14.91 14.91 103.62 -
PC3000 EX710 Block W (irs) - -
HD1500 Strip PANEL 03 3.30 Prod - 2 red -
HD785 RL 80,90 30 W (ers) - 2red -
BADAK Prod - -
PC3000 EX711 1 950 91.0% Block W (irs) 20.2 20.2 20.2 20.2 18.9 20.2 20.2 140.2 1.0
HD1500 3 SHIFT 6 147 91.0% Strip PANEL 1 3.50 Prod 19.21 19.21 19.21 19.21 17.92 19.21 19.21 133.2 1 Red 6.5
HD785 - 90 91.0% RL 40,50,60 150 W (ers) 15.9 15.9 15.9 15.9 14.9 15.9 15.9 110.4 -
KIJANG Prod 15.13 15.13 15.13 15.13 14.11 15.13 15.13 104.92 -
PC1250 EX1001 1 500 92.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 19.9 138.5 1.0
HD785 6 90 92.0% Strip PANEL 05 3.00 Prod 9.96 9.96 9.96 9.96 9.46 9.96 9.96 69.2 5.6
RL 140,150 90 W (ers) 15.9 15.9 15.9 15.9 15.1 15.9 15.9 110.3 0Red -
K10 Prod 7.93 7.93 7.93 7.93 7.54 7.93 7.93 55.14 -
PC1250 EX1006 Block W (irs) - - - - - - - - -
HD785 Strip Prod - - - - - - - - -
RL W (ers) - - - - - - - - -
Prod - - - - - - - - -
PC1250 EX1008 Block W (irs) - - - - - - - - -
HD785 Strip Prod - - - - - - - - -
RL W (ers) - - - - - - - - -
Prod - - - - - - - - -
PC1250 EX1013 1 500 92.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 19.9 138.5 1.0
HD785 5 101 92.0% Strip PANEL 3,4 3.50 Prod 9.96 9.96 9.96 9.96 9.46 9.96 9.96 69.2 1 Red 5.0
RL 100,110,140 90 W (ers) 15.9 15.9 15.9 15.9 15.1 15.9 15.9 110.3 -
K10 Prod 7.93 7.93 7.93 7.93 7.54 7.93 7.93 55.14 -
PC1250 EX1014 1 500 92.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 19.9 138.5 1.0
HD785 5 101 92.0% Strip PANEL 1,2 3.50 Prod 9.96 9.96 9.96 9.96 9.46 9.96 9.96 69.2 5.0
RL 40,50,60 150 W (ers) 15.9 15.9 15.9 15.9 15.1 15.9 15.9 110.3 -
KIJANG Prod 7.93 7.93 7.93 7.93 7.54 7.93 7.93 55.14 -
Subtot. Prod (icld. Rain & slippery), BCM 194.64 194.64 194.64 194.64 183.27 194.64 194.64 1,351.09 -
Subtot. Prod (excl. rain & slippery), BCM 153.74 153.74 153.74 153.74 144.75 153.74 153.74 1,067.17 - -
TOP SOIL ACTIVITIES PA Hauling BCM 1000 -
ID PIT DUMP Plan REMARK
Unit C/N Q'ty Pd'ty (%) Dist. (km) 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec Total Q'ty
PC750 EX577 1 300 92.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 19.9 138.5 1.0
HD785 4 85 92.0% Strip 2.80 Prod 5.98 5.98 5.98 5.98 5.68 5.98 5.98 41.54 3.5
` - 28 92.0% RL W (ers) 15.9 15.9 15.9 15.9 15.1 15.9 15.9 110.3 -
Prod 4.76 4.76 4.76 4.76 4.52 4.76 4.76 33.08 -
PC750 EX578 1 300 92.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 19.9 138.5
A40_HM 11 28 92.0% Strip 2.80 Prod 5.98 5.98 5.98 5.98 5.68 5.98 5.98 41.54
RL W (ers) 15.9 15.9 15.9 15.9 15.1 15.9 15.9 110.3
Prod 4.76 4.76 4.76 4.76 4.52 4.76 4.76 33.08
PC1250 EX1006 1 500 92.0% Block W (irs) 17.9 17.9 17.9 17.9 16.9 17.9 17.9 124.0 1.0
HD785 5 102 92.0% Strip 2.80 Prod 8.93 8.93 8.93 8.93 8.43 8.93 8.93 61.98 4.9
RL W (ers) 14.2 14.2 14.2 14.2 13.4 14.2 14.2 98.7 -
Prod 7.11 7.11 7.11 7.11 6.71 7.11 7.11 49.35 -
Subtot. Prod (icld. Rain & slippery), BCM 20.88 20.88 20.88 20.88 19.78 20.88 20.88 145.06
Subtot. Prod (excl. rain & slippery), BCM 16.63 16.63 16.63 16.63 15.75 16.63 16.63 115.52
COAL ACTIVITIES PA Hauling BCM 1000
ID PIT DUMP Plan REMARK
Unit C/N Q'ty Pd'ty (%) Dist. (km) 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec Total
PC1250 EX1002 1 500 92.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 19.9 138.5
HD785-CB 5 107 92.0% Strip 8.00 Prod 9.96 9.96 9.96 9.96 9.46 9.96 9.96 69.24
HD785 RL W (ers) 15.9 15.9 15.9 15.9 15.1 15.9 15.9 110.3
ROM/Crusher Prod 7.93 7.93 7.93 7.93 7.54 7.93 7.93 55.14
PC1250 EX1004 1 500 92.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 19.9 138.5
HD785-CB 5 107 92.0% Strip 8.00 Prod 9.96 9.96 9.96 9.96 9.46 9.96 9.96 69.24
HD785 77 92.0% RL W (ers) 15.9 15.9 15.9 15.9 15.1 15.9 15.9 110.3
ROM/Crusher Prod 7.93 7.93 7.93 7.93 7.54 7.93 7.93 55.14
Block W (irs) -
Strip Prod -
RL W (ers) -
Prod -
Subtot. Prod (icld. Rain & slippery), BCM 19.93 19.93 19.93 19.93 18.93 19.93 19.93 138.48
Subtot. Prod (excl. rain & slippery), BCM 15.87 15.87 15.87 15.87 15.07 15.87 15.87 110.27
OTHER ACTIVITY
Activity Unit Type C/N PA Description Activity Type C/N PA
Dozing D375A-5 DZ367 90% Road GD825A-2 GR320 92%
DZ368 90% Maint'ce GR321 92%
DZ369 90% GR322 92%
D7G/D85SS DZ121 90% GR404 92%
DZ120 90% GR405 92%
Compactor CP300 90%
Drilling REDRILL DR041 90% TJCP006
DR042 90%
DR052 Spraying HD785-5(WT) DT791 90%
Spread D375A-5 DZ372 90% HD785-3(WT) DT603 90%
Disposal DZ373 90% HD785-3(WT) DT602 90%
DZ374 90% 320B/PC200 KPTJEX001 90%
DZ375 90% General KPTJEX007 90%
D279 EX429 90%
EX430 90%
Soil WD D85SS DZ122 90% D155A2 DZ264 90%
Landclearing D7G/D85SS TJDZ012 90%
TJDZ005 90%
TJDZ008 90%

Disepakati bersama : Cat. :1.

Eng. Dept Head Prod. Dept Head Plant Dept. Head

//17009/D:/376633201.xls/WK#03/01/15/2018
BENDILI
LOCATION :
PT. Pamapersada Nusantara WEEKLY PLAN
PAMA DISTRICT KPCS Period : 18-Dec to 24-Dec Rev. :0 Pencapaian produksi sampai dengan :
TARGET Diskripsi unit Target Realisasi +/-
Total hari bulan ini 31 hari Target O/B bulan ini 5,021,524 Bcm Month to Date (OB) Bcm
Perkiraan jam hujan, licin & kabut bulan ini 100 jam Target O/B minggu ini 1,067,172 Bcm
Perkiraan hari efektif bulan ini 26.8 hari Target T/S minggu ini 115,518 Bcm Last week (OB) Bcm
Rencana jam kerja minggu ini 111.7 jam Target CO minggu ini 110,274 Bcm
O/B ACTIVITIES PA Hauling BCM 1000 EQUIP EQUIP TOT TOT +/- 92%
ID PIT DUMP Plan REMARK
Unit C/N Q'ty Pd'ty (%) Dist. (km) 18-Dec 19-Dec 20-Dec 21-Dec 22-Dec 23-Dec 24-Dec Total RUNNING TYPE SETT EXIST
PC5500 SH4001 1 1800 92.0% Block W (irs) 20.2 20.2 20.2 20.2 18.9 20.2 20.2 140.2 1.0 PC5500 2 2 - 1.8
H730E 3 SHIFT 10 175 92.0% Strip PANEL 1 3.50 Prod 36.41 36.41 36.41 36.41 33.95 36.41 36.41 252.4 10.3 PC4000 2 3 1.0 2.8
HD1500 - 156 92.0% RL 40, 50 150 W (ers) 16.1 16.1 16.1 16.1 15.0 16.1 16.1 111.7 - PC3000 2 4 2.0 3.7
KIJANG Prod 28.99 28.99 28.99 28.99 27.03 28.99 28.99 200.98 - PC1250 6 7 1.0 6.4
PC5500 SH4002 1 1800 92.0% Block W (irs) 20.2 20.2 20.2 20.2 18.9 20.2 20.2 140.2 1.0 PC750 2 2 - 1.8
H730E 3 SHIFT 4 182 92.0% Strip PANEL 3 3.30 Prod 36.41 36.41 36.41 36.41 33.95 36.41 36.41 252.4 4.0 PC300 - 3 3.0 2.8
HD1500 7 152 92.0% RL 70, 80,90 90 W (ers) 16.1 16.1 16.1 16.1 15.0 16.1 16.1 111.7 7.1 H730E 14 15 0.7 13.8
K10 Prod 28.99 28.99 28.99 28.99 27.03 28.99 28.99 200.98 - HD1500 14 25 11.5 23.0
PC4000 SH304 Block W (irs) - - - - - - - - - HD465 - - - -
HD1500 Strip Prod - - - - - - - - - A40_HM 11 14 3.4 12.9
HD785 RL W (ers) - - - - - - - - - HD785 61 68 6.7 63.9
Prod - - - - - - - - - HD785-CB 10 11 1.0 10.1
PC4000 SH305 1 1350 90.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 19.9 138.5 1.0 HD785-BT - - - -
HD1500 156 90.0% Strip PANEL 05 3.30 Prod 26.90 26.90 26.90 26.90 25.55 26.90 26.90 186.9 - 12.32
HD785 14 96 90.0% RL 140,150 30 W (ers) 15.5 15.5 15.5 15.5 14.7 15.5 15.5 107.9 14.0
BADAK Prod 20.95 20.95 20.95 20.95 19.90 20.95 20.95 145.63 -
PC4000 SH306 1 1350 90.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 19.9 138.5 1.0
HD1500 150 90.0% Strip Panel 2 3.50 Prod 26.90 26.90 26.90 26.90 25.55 26.90 26.90 186.9 -
HD785 13 102 90.0% RL 40 ,50 150 W (ers) 15.5 15.5 15.5 15.5 14.7 15.5 15.5 107.9 13.2
KIJANG Prod 20.95 20.95 20.95 20.95 19.90 20.95 20.95 145.63 -
PC3000 EX708 Block W (irs) - -
HD1500 Strip Prod - -
HD785 RL W (ers) - -
Prod - -
PC3000 EX709 1 950 91.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 19.9 138.5 1.0
HD1500 152 91.0% Strip PANEL 05 3.30 Prod 18.93 18.93 18.93 18.93 17.98 18.93 18.93 131.6 -
HD785 10 94 91.0% RL 140,150 30 W (ers) 15.7 15.7 15.7 15.7 14.9 15.7 15.7 109.1 10.1
BADAK Prod 14.91 14.91 14.91 14.91 14.16 14.91 14.91 103.62 -
PC3000 EX710 Block W (irs) - -
HD1500 Strip PANEL 03 3.30 Prod - -
HD785 RL 80,90 30 W (ers) - -
BADAK Prod - -
PC3000 EX711 1 950 91.0% Block W (irs) 20.2 20.2 20.2 20.2 18.9 20.2 20.2 140.2
HD1500 3 SHIFT 6 147 91.0% Strip PANEL 1 3.50 Prod 19.21 19.21 19.21 19.21 17.92 19.21 19.21 133.2
HD785 - 90 91.0% RL 40,50,60 150 W (ers) 15.9 15.9 15.9 15.9 14.9 15.9 15.9 110.4
KIJANG Prod 15.13 15.13 15.13 15.13 14.11 15.13 15.13 104.92
PC1250 EX1001 1 500 92.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 19.9 138.5
HD785 6 90 92.0% Strip PANEL 05 3.00 Prod 9.96 9.96 9.96 9.96 9.46 9.96 9.96 69.2
RL 140,150 90 W (ers) 15.9 15.9 15.9 15.9 15.1 15.9 15.9 110.3
K10 Prod 7.93 7.93 7.93 7.93 7.54 7.93 7.93 55.14
PC1250 EX1006 Block W (irs) - - - - - - - - -
HD785 Strip Prod - - - - - - - - -
RL W (ers) - - - - - - - - -
Prod - - - - - - - - -
PC1250 EX1008 Block W (irs) - - - - - - - - -
HD785 Strip Prod - - - - - - - - -
RL W (ers) - - - - - - - - -
Prod - - - - - - - - -
PC1250 EX1013 1 500 92.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 19.9 138.5 1.0
HD785 5 101 92.0% Strip PANEL 3,4 3.50 Prod 9.96 9.96 9.96 9.96 9.46 9.96 9.96 69.2 5.0
RL 100,110,140 90 W (ers) 15.9 15.9 15.9 15.9 15.1 15.9 15.9 110.3 -
K10 Prod 7.93 7.93 7.93 7.93 7.54 7.93 7.93 55.14 -
PC1250 EX1014 1 500 92.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 19.9 138.5
HD785 5 101 92.0% Strip PANEL 1,2 3.50 Prod 9.96 9.96 9.96 9.96 9.46 9.96 9.96 69.2
RL 40,50,60 150 W (ers) 15.9 15.9 15.9 15.9 15.1 15.9 15.9 110.3
KIJANG Prod 7.93 7.93 7.93 7.93 7.54 7.93 7.93 55.14
Subtot. Prod (icld. Rain & slippery), BCM 194.64 194.64 194.64 194.64 183.27 194.64 194.64 1,351.09 -
Subtot. Prod (excl. rain & slippery), BCM 153.74 153.74 153.74 153.74 144.75 153.74 153.74 1,067.17 -
TOP SOIL ACTIVITIES PA Hauling BCM 1000
ID PIT DUMP Plan REMARK
Unit C/N Q'ty Pd'ty (%) Dist. (km) 18-Dec 19-Dec 20-Dec 21-Dec 22-Dec 23-Dec 24-Dec Total
PC750 EX577 1 300 92.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 19.9 138.5 1.0
HD785 4 85 92.0% Strip 2.80 Prod 5.98 5.98 5.98 5.98 5.68 5.98 5.98 41.54 3.5
` - 28 92.0% RL W (ers) 15.9 15.9 15.9 15.9 15.1 15.9 15.9 110.3 -
Prod 4.76 4.76 4.76 4.76 4.52 4.76 4.76 33.08 -
PC750 EX578 1 300 92.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 19.9 138.5
A40_HM 11 28 92.0% Strip 2.80 Prod 5.98 5.98 5.98 5.98 5.68 5.98 5.98 41.54
RL W (ers) 15.9 15.9 15.9 15.9 15.1 15.9 15.9 110.3
Prod 4.76 4.76 4.76 4.76 4.52 4.76 4.76 33.08
PC1250 EX1006 1 500 92.0% Block W (irs) 17.9 17.9 17.9 17.9 16.9 17.9 17.9 124.0
HD785 5 102 92.0% Strip 2.80 Prod 8.93 8.93 8.93 8.93 8.43 8.93 8.93 61.98
RL W (ers) 14.2 14.2 14.2 14.2 13.4 14.2 14.2 98.7
Prod 7.11 7.11 7.11 7.11 6.71 7.11 7.11 49.35
Subtot. Prod (icld. Rain & slippery), BCM 20.88 20.88 20.88 20.88 19.78 20.88 20.88 145.06
Subtot. Prod (excl. rain & slippery), BCM 16.63 16.63 16.63 16.63 15.75 16.63 16.63 115.52
COAL ACTIVITIES PA Hauling BCM 1000
ID PIT DUMP Plan REMARK
Unit C/N Q'ty Pd'ty (%) Dist. (km) 18-Dec 19-Dec 20-Dec 21-Dec 22-Dec 23-Dec 24-Dec Total
PC1250 EX1002 1 500 92.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 19.9 138.5
HD785-CB 5 107 92.0% Strip 8.00 Prod 9.96 9.96 9.96 9.96 9.46 9.96 9.96 69.24
HD785 RL W (ers) 15.9 15.9 15.9 15.9 15.1 15.9 15.9 110.3
ROM/Crusher Prod 7.93 7.93 7.93 7.93 7.54 7.93 7.93 55.14
PC1250 EX1004 1 500 92.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 19.9 138.5
HD785-CB 5 107 92.0% Strip 8.00 Prod 9.96 9.96 9.96 9.96 9.46 9.96 9.96 69.24
HD785 77 92.0% RL W (ers) 15.9 15.9 15.9 15.9 15.1 15.9 15.9 110.3
ROM/Crusher Prod 7.93 7.93 7.93 7.93 7.54 7.93 7.93 55.14
Block W (irs) - -
Strip Prod - -
RL W (ers) - -
Prod - -
Subtot. Prod (icld. Rain & slippery), BCM 19.93 19.93 19.93 19.93 18.93 19.93 19.93 138.48
Subtot. Prod (excl. rain & slippery), BCM 15.87 15.87 15.87 15.87 15.07 15.87 15.87 110.27
OTHER ACTIVITY
Activity Unit Type C/N PA Description Activity Type C/N PA
Dozing D375A-5 DZ367 90% Road GD825A-2 GR320 92%
DZ368 90% Maint'ce GR321 92%
DZ369 90% GR322 92%
D7G/D85SS DZ121 90% GR404 92%
DZ120 90% GR405 92%
Compactor CP300 90%
Drilling REDRILL DR041 90% TJCP006
DR042 90%
DR052 Spraying HD785-5(WT) DT791 90%
Spread D375A-5 DZ372 90% HD785-3(WT) DT603 90%
Disposal DZ373 90% HD785-3(WT) DT602 90%
DZ374 90% 320B/PC200 KPTJEX001 90%
DZ375 90% General KPTJEX007 90%
D279 EX429 90%
EX430 90%
Soil WD D85SS DZ122 90% D155A2 DZ264 90%
Landclearing D7G/D85SS TJDZ012 90%
TJDZ005 90%
TJDZ008 90%

Disepakati bersama : Cat. :1.

Eng. Dept Head Prod. Dept Head Plant Dept. Head

//17009/D:/376633201.xls/WK#04/01/15/2018
BENDILI
LOCATION :
PT. Pamapersada Nusantara WEEKLY PLAN
PAMA
DISTRICT KPCS Period : 25-Dec to 31-Dec Rev. :0 Pencapaian produksi sampai dengan :

TARGET Diskripsi unit Target Realisasi +/-


Total hari bulan ini 31 hari Target O/B bulan ini 5,021,524 Bcm Month to Date (OB) Bcm
Perkiraan jam hujan, licin & kabut bulan ini 100 jam Target O/B minggu ini 877,570 Bcm
Perkiraan hari efektif bulan ini 26.8 hari Target T/S minggu ini 86,393 Bcm Last week (OB) Bcm
Rencana jam kerja minggu ini 95.5 jam Target CO minggu ini 78,539 Bcm
O/B ACTIVITIES PA Hauling BCM 1000 EQUIP EQUIP TOT TOT +/- 92%
ID PIT DUMP Plan REMARK
Unit C/N Q'ty Pd'ty (%) Dist. (km) 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec Total RUNNING TYPE SETT EXIST
PC5500 SH4001 1 1800 92.0% Block W (irs) 20.2 20.2 20.2 20.2 18.9 20.2 120.0 1.0 PC5500 2 2 - 1.8
H730E 3 SHIFT 10 175 92.0% Strip PANEL 1 3.50 Prod 36.41 36.41 36.41 36.41 33.95 36.41 216.0 10.3 PC4000 2 3 1.0 2.8
HD1500 - 156 92.0% RL 40, 50 150 W (ers) 16.1 16.1 16.1 16.1 15.0 16.1 95.5 - PC3000 2 4 2.0 3.7
KIJANG Prod 28.99 28.99 28.99 28.99 27.03 28.99 171.99 - PC1250 6 7 1.0 6.4
PC5500 SH4002 1 1800 92.0% Block W (irs) 20.2 20.2 20.2 20.2 18.9 20.2 120.0 1.0 PC750 2 2 - 1.8
H730E 3 SHIFT 4 182 92.0% Strip PANEL 3 3.30 Prod 36.41 36.41 36.41 36.41 33.95 36.41 216.0 4.0 PC300 - 3 3.0 2.8
HD1500 7 152 92.0% RL 70, 80,90 90 W (ers) 16.1 16.1 16.1 16.1 15.0 16.1 95.5 7.1 H730E 14 15 0.7 13.8
K10 Prod 28.99 28.99 28.99 28.99 27.03 28.99 171.99 - HD1500 14 25 11.5 23.0
PC4000 SH304 Block W (irs) - - - - - - - - HD465 - - - -
HD1500 Strip Prod - - - - - - - - A40_HM 11 14 3.4 12.9
HD785 RL W (ers) - - - - - - - - HD785 61 68 6.7 63.9
Prod - - - - - - - - HD785-CB 10 11 1.0 10.1
PC4000 SH305 1 1350 90.0% Block W (irs) 19.9 19.9 19.9 18.9 19.9 98.6 1.0 HD785-BT - - - -
HD1500 156 90.0% Strip PANEL 05 3.30 Prod 26.90 26.90 26.90 25.55 26.90 133.1 -
HD785 14 96 90.0% RL 140,150 30 W (ers) 15.5 15.5 15.5 14.7 15.5 76.8 14.0 12.32
BADAK Prod 20.95 20.95 20.95 19.90 20.95 103.72 -
PC4000 SH306 1 1350 90.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 118.6 1.0
HD1500 150 90.0% Strip Panel 2 3.50 Prod 26.90 26.90 26.90 26.90 25.55 26.90 160.0 -
HD785 13 102 90.0% RL 40 ,50 150 W (ers) 15.5 15.5 15.5 15.5 14.7 15.5 92.4 13.2
KIJANG Prod 20.95 20.95 20.95 20.95 19.90 20.95 124.68 -
PC3000 EX708 Block W (irs) - -
HD1500 Strip Prod - -
HD785 RL W (ers) - -
Prod - -
PC3000 EX709 1 950 91.0% Block W (irs) 19.9 19.9 19.9 18.9 19.9 98.6 1.0
HD1500 152 91.0% Strip PANEL 05 3.30 Prod 18.93 18.93 18.93 17.98 18.93 93.7 -
HD785 10 94 91.0% RL 140,150 30 W (ers) 15.7 15.7 15.7 14.9 15.7 77.7 10.1
BADAK Prod 14.91 14.91 14.91 14.16 14.91 73.80 -
PC3000 EX710 Block W (irs) -
HD1500 Strip PANEL 03 3.30 Prod -
HD785 RL 80,90 30 W (ers) -
BADAK Prod -
PC3000 EX711 1 950 91.0% Block W (irs) 20.2 20.2 20.2 20.2 18.9 20.2 120.0
HD1500 3 SHIFT 6 147 91.0% Strip PANEL 1 3.50 Prod 19.21 19.21 19.21 19.21 17.92 19.21 114.0
HD785 - 90 91.0% RL 40,50,60 150 W (ers) 15.9 15.9 15.9 15.9 14.9 15.9 94.5
KIJANG Prod 15.13 15.13 15.13 15.13 14.11 15.13 89.78
PC1250 EX1001 1 500 92.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 118.6 1.0
HD785 6 90 92.0% Strip PANEL 05 3.00 Prod 9.96 9.96 9.96 9.96 9.46 9.96 59.3 5.6
RL 140,150 90 W (ers) 15.9 15.9 15.9 15.9 15.1 15.9 94.4 -
K10 Prod 7.93 7.93 7.93 7.93 7.54 7.93 47.20 -
PC1250 EX1006 Block W (irs) - - - - - - - -
HD785 Strip Prod - - - - - - - -
RL W (ers) - - - - - - - -
Prod - - - - - - - -
PC1250 EX1008 Block W (irs) - - - - - - - -
HD785 Strip Prod - - - - - - - -
RL W (ers) - - - - - - - -
Prod - - - - - - - -
PC1250 EX1013 1 500 92.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 118.6 1.0
HD785 5 101 92.0% Strip PANEL 3,4 3.50 Prod 9.96 9.96 9.96 9.96 9.46 9.96 59.3 5.0
RL 100,110,140 90 W (ers) 15.9 15.9 15.9 15.9 15.1 15.9 94.4 -
K10 Prod 7.93 7.93 7.93 7.93 7.54 7.93 47.20 -
PC1250 EX1014 1 500 92.0% Block W (irs) 19.9 19.9 19.9 19.9 18.9 19.9 118.6 1.0
HD785 5 101 92.0% Strip PANEL 1,2 3.50 Prod 9.96 9.96 9.96 9.96 9.46 9.96 59.3 5.0
RL 40,50,60 150 W (ers) 15.9 15.9 15.9 15.9 15.1 15.9 94.4 -
KIJANG Prod 7.93 7.93 7.93 7.93 7.54 7.93 47.20 -
Subtot. Prod (icld. Rain & slippery), BCM 148.81 194.64 194.64 194.64 183.27 194.64 - 1,110.63
Subtot. Prod (excl. rain & slippery), BCM 117.87 153.74 153.74 153.74 144.75 153.74 - 877.57 -
TOP SOIL ACTIVITIES PA Hauling BCM 1000
ID PIT DUMP Plan REMARK
Unit C/N Q'ty Pd'ty (%) Dist. (km) 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec Total
PC750 EX577 1 300 92.0% Block W (irs) 19.9 19.9 19.9 18.9 19.9 98.6 1.0
HD785 4 85 92.0% Strip 2.80 Prod 5.98 5.98 5.98 5.68 5.98 29.59 3.5
` - 28 92.0% RL W (ers) 15.9 15.9 15.9 15.1 15.9 78.5 -
Prod 4.76 4.76 4.76 4.52 4.76 23.56 -
PC750 EX578 1 300 92.0% Block W (irs) 19.9 19.9 19.9 18.9 19.9 98.6
A40_HM 11 28 92.0% Strip 2.80 Prod 5.98 5.98 5.98 5.68 5.98 29.59
RL W (ers) 15.9 15.9 15.9 15.1 15.9 78.5
Prod 4.76 4.76 4.76 4.52 4.76 23.56
PC1250 EX1006 1 500 92.0% Block W (irs) 19.9 19.9 19.9 18.9 19.9 98.6
HD785 5 102 92.0% Strip 2.80 Prod 9.96 9.96 9.96 9.46 9.96 49.31
RL W (ers) 15.9 15.9 15.9 15.1 15.9 78.5
Prod 7.93 7.93 7.93 7.54 7.93 39.27
Subtot. Prod (icld. Rain & slippery), BCM - 21.92 21.92 21.92 20.82 21.92 - 108.49
Subtot. Prod (excl. rain & slippery), BCM - 17.45 17.45 17.45 16.58 17.45 - 86.39
COAL ACTIVITIES PA Hauling BCM 1000
ID PIT DUMP Plan REMARK
Unit C/N Q'ty Pd'ty (%) Dist. (km) 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec Total
PC1250 EX1002 1 500 92.0% Block W (irs) 19.9 19.9 19.9 18.9 19.9 98.6
HD785-CB 5 107 92.0% Strip 8.00 Prod 9.96 9.96 9.96 9.46 9.96 49.3
HD785 RL W (ers) 15.9 15.9 15.9 15.1 15.9 78.5
ROM/Crusher Prod 7.93 7.93 7.93 7.54 7.93 39.27
PC1250 EX1004 1 500 92.0% Block W (irs) 19.9 19.9 19.9 18.9 19.9 98.6
HD785-CB 5 107 92.0% Strip 8.00 Prod 9.96 9.96 9.96 9.46 9.96 49.3
HD785 77 92.0% RL W (ers) 15.9 15.9 15.9 15.1 15.9 78.5
ROM/Crusher Prod 7.93 7.93 7.93 7.54 7.93 39.27
Subtot. Prod (icld. Rain & slippery), BCM - 19.93 19.93 19.93 18.93 19.93 - 98.63
Subtot. Prod (excl. rain & slippery), BCM - 15.87 15.87 15.87 15.07 15.87 - 78.54
OTHER ACTIVITY
Activity Unit Type C/N PA Description Activity Type C/N PA
Dozing D375A-5 DZ367 90% Road GD825A-2 GR320 92%
DZ368 90% Maint'ce GR321 92%
DZ369 90% GR322 92%
D7G/D85SS DZ121 90% GR404 92%
DZ120 90% GR405 92%
Compactor CP300 90%
Drilling REDRILL DR041 90% TJCP006
DR042 90%
DR052 Spraying HD785-5(WT) DT791 90%
Spread D375A-5 DZ372 90% HD785-3(WT) DT603 90%
Disposal DZ373 90% HD785-3(WT) DT602 90%
DZ374 90% 320B/PC200 KPTJEX001 90%
DZ375 90% General KPTJEX007 90%
D279 EX429 90%
EX430 90%
Soil WD D85SS DZ122 90% D155A2 DZ264 90%
Landclearing D7G/D85SS TJDZ012 90%
TJDZ005 90%
TJDZ008 90%

Disepakati bersama : Cat. :1.

Eng. Dept Head Prod. Dept Head Plant Dept. Head

//17009/D:/376633201.xls/WK#05/01/15/2018
BENDILI
LOCATION :
PT. Pamapersada Nusantara WEEKLY PLAN
PAMA
DISTRICT KPCS Period : 1-Jan to 2-Jan Rev. :0 Pencapaian produksi sampai dengan :
TARGET Diskripsi unit Target Realisasi +/-
Total hari bulan ini 31 hari Target O/B bulan ini 5,021,524 Bcm Month to Date (OB) Bcm
Perkiraan jam hujan, licin & kabut bulan ini 100 jam Target O/B minggu ini 0 Bcm
Perkiraan hari efektif bulan ini 26.8 hari Target T/S minggu ini 0 Bcm Last week (OB) Bcm
Rencana jam kerja minggu ini - jam Target CO minggu ini 0 Bcm
O/B ACTIVITIES PA Hauling BCM 1000 EQUIP TOT TOT +/- 92%
ID PIT DUMP Plan REMARK
Unit C/N Q'ty Pd'ty (%) Dist. (km) 1-Jan 2-Jan Total TYPE SETT EXIST
PC5500 SH4001 1 1800 92.0% Block W (irs) - PC5500 2 2 - 1.8
H730E 9 190 92.0% Strip PANEL 02 3.50 Prod - PC4000 3 3 - 2.8
HD1500 - 156 92.0% RL 40, 50 150 W (ers) - PC3000 3 4 1.0 3.7
KIJANG Prod - PC1250 4 7 3.0 6.4
PC5500 SH4002 1 1800 92.0% Block W (irs) - PC750 2 2 - 1.8
H730E 5 210 92.0% Strip PANEL 05 3.00 Prod - PC300 1 3 2.0 2.8
HD1500 4 172 92.0% RL 150 90 W (ers) - H730E 14 15 0.5 13.8
K10 Prod - HD1500 18 25 7.3 23.0
PC4000 SH304 1 1350 90.0% Block W (irs) - HD465 - - - -
H730E 194 90.0% Strip PANEL 05 3.00 Prod - A40_HM 13 14 1.0 12.9
HD1500 8 161 90.0% RL 150 90 W (ers) - HD785 65 68 3.5 63.9
K10 Prod - HD785-CB 10 11 1.0 10.1
PC4000 SH305 1 1350 90.0% Block W (irs) - 1.0 HD785-BT - - - -
HD1500 3 160 90.0% Strip PANEL 04 3.50 Prod - 3.0
HD785 9 92 90.0% RL 90 30 W (ers) - 9.5
BADAK_B Prod - -
PC4000 SH306 1 1350 90.0% Block W (irs) - 1.0
HD1500 163 90.0% Strip PANEL 03 3.40 Prod - -
HD785 14 94 90.0% RL 90 150 W (ers) - 14.4
KIJANG Prod - -
PC3000 Block W (irs) - -
HD1500 Strip Prod - -
HD785 RL W (ers) - -
Prod - -
PC3000 EX709 1 950 92.0% Block W (irs) - 1.0
HD1500 149 92.0% Strip PANEL 02 3.60 Prod - -
HD785 9 108 92.0% RL 60 150 W (ers) - 8.8
KIJANG Prod - -
PC3000 EX710 1 950 92.0% Block W (irs) - 1.0
HD1500 134 92.0% Strip PANEL 02 3.60 Prod - -
HD785 11 88 92.0% RL 30, 40 150 W (ers) - 10.8
KIJANG Prod - -
PC3000 EX711 1 950 92.0% Block W (irs) - 1.0
HD1500 2 151 92.0% Strip PANEL 04 3.00 Prod - 2.0
HD785 6 101 92.0% RL 90 30 W (ers) - 6.4
BADAK_B Prod - -
PC1250 EX1001 1 500 92.0% Block W (irs) -
HD785 6 90 92.0% Strip PANEL 04 3.00 Prod -
- 101 RL 90 30 W (ers) -
BADAK_B Prod -
PC1250 EX1002 1 500 92.0% Block W (irs) -
HD785 6 82 92.0% Strip PANEL 03 3.40 Prod -
RL 90 150 W (ers) -
KIJANG Prod -
Block W (irs) - -
Strip Prod - - - -
RL W (ers) - - - -
Prod - - - -
Block W (irs) - - -
Strip Prod - - -
RL W (ers) - - -
Prod - - - - - - - -
Block W (irs) - - - - - - - - -
Strip Prod - - - - - - - - -
RL W (ers) - - - - - - - - -
Prod - - - - - - - - -
Subtot. Prod (icld. Rain & slippery), BCM - - - - - - - -
Subtot. Prod (excl. rain & slippery), BCM - - - - - - - - -
TOP SOIL ACTIVITIES PA Hauling BCM 1000
ID PIT DUMP Plan REMARK
Unit C/N Q'ty Pd'ty (%) Dist. (km) 1-Jan 2-Jan Total
PC750 EX577 1 300 92.0% Block W (irs) - 1.0
HD785 3 85 92.0% Strip 2.80 Prod - 3.0
RL BELUT BELUT W (ers) - -
Prod - -
PC750 EX578 1 300 92.0% Block W (irs) -
A40_HM 7 42 92.0% Strip BELUT BELUT 1.50 Prod -
RL W (ers) -
Prod -
PC300 TJ09 1 150 92.0% Block W (irs) -
A40_HM 6 25 92.0% Strip MUSANG BIG PANEL 02 3.00 Prod -
RL W (ers) -
Prod -
Subtot. Prod (icld. Rain & slippery), BCM - - - - - - - -
Subtot. Prod (excl. rain & slippery), BCM - - - - - - - -
COAL ACTIVITIES PA Hauling BCM 1000
ID PIT DUMP Plan REMARK
Unit C/N Q'ty Pd'ty (%) Dist. (km) 1-Jan 2-Jan 30-Dec 30-Dec 30-Dec 30-Dec 30-Dec Total
PC1250 EX1008 1 500 92.0% Block W (irs) -
HD785-CB 5 107 92.0% Strip 8.00 Prod -
HD785 RL W (ers) -
ROM/Crusher Prod -
PC1250 EX1013 1 500 92.0% Block W (irs) -
HD785-CB 5 107 92.0% Strip 8.00 Prod -
HD785 77 92.0% RL W (ers) -
ROM/Crusher Prod -
Subtot. Prod (icld. Rain & slippery), BCM - - - - - - - -
Subtot. Prod (excl. rain & slippery), BCM - - - - - - - -
OTHER ACTIVITY
Activity Unit Type C/N PA Description Activity Type C/N PA
Dozing D375A-5 DZ367 90% Road GD825A-2 GR320 92%
DZ368 90% Maint'ce GR321 92%
DZ369 90% GR322 92%
D7G/D85SS DZ121 90% GR404 92%
DZ120 90% GR405 92%
Compactor CP300 90%
Drilling REDRILL DR041 90% TJCP006
DR042 90%
DR052 Spraying HD785-5(WT) DT791 90%
Spread D375A-5 DZ372 90% HD785-3(WT) DT603 90%
Disposal DZ373 90% HD785-3(WT) DT602 90%
DZ374 90% 320B/PC200 KPTJEX001 90%
DZ375 90% General KPTJEX007 90%
EX429 90%
EX430 90%
Soil WD D85SS DZ122 90% D155A2 DZ264 90%
Landclearing D7G/D85SS TJDZ012 90%
TJDZ005 90%
TJDZ008 90%

Disepakati bersama : Cat. :1.

Eng. Dept Head Prod. Dept Head Plant Dept. Head

//17009/D:/376633201.xls/WK#06/01/15/2018
PT. PAMAPERSADA NUSANTARA
DISTRICT KPC SANGATTA - KALTIM

PIT BENDILI
MONTH : NOVEMBER 2006
PRODUCTION PLANNING FOR WASTE , KBCM
FLEET WEEK # 01 WEEK # 02 WEEK #03 WEEK #04 WEEK # 05 WEEK#06
Total
NUMBER 30-Dec 30-Dec 1-Dec 2-Dec 3-Dec 4-Dec 5-Dec 6-Dec 7-Dec 8-Dec 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec 21-Dec 22-Dec 23-Dec 24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1-Jan 2-Jan
SH4001 - - 27.03 28.99 28.99 28.99 28.99 28.99 28.99 27.03 28.99 28.99 28.99 28.99 28.99 28.99 27.03 28.99 28.99 28.99 28.99 28.99 28.99 27.03 28.99 28.99 28.99 28.99 28.99 28.99 27.03 28.99 - - - 859.93
SH4002 - - 27.03 28.99 28.99 28.99 28.99 28.99 28.99 27.03 28.99 28.99 28.99 28.99 28.99 28.99 27.03 28.99 28.99 28.99 28.99 28.99 28.99 27.03 28.99 28.99 28.99 28.99 28.99 28.99 27.03 28.99 - - - 859.93
SH304 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
SH305 - - 19.90 20.95 20.95 20.95 20.95 20.95 20.95 19.90 20.95 20.95 20.95 20.95 20.95 20.95 19.90 20.95 20.95 20.95 20.95 20.95 20.95 19.90 20.95 20.95 - 20.95 20.95 20.95 19.90 20.95 - - - 602.44
SH306 - - 19.90 20.95 20.95 20.95 20.95 20.95 20.95 19.90 20.95 20.95 20.95 20.95 20.95 20.95 19.90 20.95 20.95 20.95 20.95 20.95 20.95 19.90 20.95 20.95 20.95 20.95 20.95 20.95 19.90 20.95 - - - 623.39
EX708 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
EX709 - - 14.16 14.91 14.91 14.91 14.91 14.91 14.91 14.16 14.91 14.91 14.91 14.91 14.91 14.91 14.16 14.91 14.91 14.91 14.91 14.91 14.91 14.16 14.91 14.91 - 14.91 14.91 14.91 14.16 14.91 - - - 428.65
EX710 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
EX711 - - 14.11 15.13 15.13 15.13 15.13 15.13 15.13 14.11 15.13 15.13 15.13 15.13 15.13 15.13 14.11 15.13 15.13 15.13 15.13 15.13 15.13 14.11 15.13 15.13 15.13 15.13 15.13 15.13 14.11 15.13 - - - 448.92
EX1001 - - 7.54 7.93 7.93 7.93 7.93 7.93 7.93 7.54 7.93 7.93 7.93 7.93 7.93 7.93 7.54 7.93 7.93 7.93 7.93 7.93 7.93 7.54 7.93 7.93 7.93 7.93 7.93 7.93 7.54 7.93 - - - 236.02
EX1006 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
EX1008 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
EX1013 - - 7.54 7.93 7.93 7.93 7.93 7.93 7.93 7.54 7.93 7.93 7.93 7.93 7.93 7.93 7.54 7.93 7.93 7.93 7.93 7.93 7.93 7.54 7.93 7.93 7.93 7.93 7.93 7.93 7.54 7.93 - 236.02
EX1014 - - 7.54 7.93 7.93 7.93 7.93 7.93 7.93 7.54 7.93 7.93 7.93 7.93 7.93 7.93 7.54 7.93 7.93 7.93 7.93 7.93 7.93 7.54 7.93 7.93 7.93 7.93 7.93 7.93 7.54 7.93 236.02
EX577 - - 4.52 4.76 4.76 4.76 4.76 4.76 4.76 4.52 4.76 4.76 4.76 4.76 4.76 4.76 4.52 4.76 4.76 4.76 4.76 4.76 4.76 4.52 4.76 4.76 - 4.76 4.76 4.76 4.52 4.76 - - - 136.85
EX578 - - 4.52 4.76 4.76 4.76 4.76 4.76 4.76 4.52 4.76 4.76 4.76 4.76 4.76 4.76 4.52 4.76 4.76 4.76 4.76 4.76 4.76 4.52 4.76 4.76 - 4.76 4.76 4.76 4.52 4.76 - - - 136.85
EX1006 - - 7.54 7.93 7.93 7.93 7.93 7.93 7.93 7.54 7.93 7.93 7.11 7.11 7.11 7.11 6.71 7.11 7.11 7.11 7.11 7.11 7.11 6.71 7.11 7.11 - 7.93 7.93 7.93 7.54 7.93 - - - 216.52
TOTAL - - 161.33 171.19 171.19 171.19 171.19 171.19 171.19 161.33 171.19 171.19 170.36 170.36 170.36 170.36 160.50 170.36 170.36 170.36 170.36 170.36 170.36 160.50 170.36 170.36 117.87 171.19 171.19 171.19 161.33 171.19 - - - 5,021.52

RESUME WASTE REMOVAL TOTAL WASTE REMOVAL 5,021.52


OB                                   4,531.31  kBCM
TS_PIT                                        ­    kBCM
OB+TS_PIT                                        ­    kBCM
TS_WD                                     490.22  kBCM
TOTAL                                   5,021.52  kBCM

PRODUCTION PLANNING FOR COAL , KTON


FLEET WEEK # 01 WEEK # 02 WEEK #03 WEEK #04 WEEK # 05 WEEK#06
Total
NUMBER 30-Dec 30-Dec 1-Dec 2-Dec 3-Dec 4-Dec 5-Dec 6-Dec 7-Dec 8-Dec 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec 21-Dec 22-Dec 23-Dec 24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1-Jan 2-Jan
EX1002 - - 7.54 7.93 7.93 7.93 7.93 7.93 7.93 7.54 7.93 7.93 7.93 7.93 7.93 7.93 7.54 7.93 7.93 7.93 7.93 7.93 7.93 7.54 7.93 7.93 - 7.93 7.93 7.93 7.54 7.93 - - - 228.08
EX1004 - - 7.54 7.93 7.93 7.93 7.93 7.93 7.93 7.54 7.93 7.93 7.93 7.93 7.93 7.93 7.54 7.93 7.93 7.93 7.93 7.93 7.93 7.54 7.93 7.93 - 7.93 7.93 7.93 7.54 7.93 - - - 228.08
-
-
Daily - - 15.07 15.87 15.87 15.87 15.87 15.87 15.87 15.07 15.87 15.87 15.87 15.87 15.87 15.87 15.07 15.87 15.87 15.87 15.87 15.87 15.87 15.07 15.87 15.87 - 15.87 15.87 15.87 15.07 15.87 - - -
46.81 110.27 110.27 110.27 78.54 - 456.17

Note : TOTAL COAL MINING 456.17


Rains , Slippery&Fogy 100.00 Hour's

01/15/2018 376633201.xls
PT. PAMAPERSADA NUSANTARA
DISTRICT KPC-SANGATTA

MONTHLY PLAN
PERIOD : NOVEMBER 2006

General Assumption : General Assumption :


RI independence day 17 August 1.00 shift
Available days for this month 31.00 days
Schedule Hours/Day 24.00 hours/day Existing
DT Type Require-
Controllable lost time 4.20 hours/day or 252 mins/day On Site
ment
Avrg. Available whrs/day 19.80 hours/day - H730 14 15
Total rain,slipp & foggy planned 100.00 hrs/month - HD1500 14 25
Uncontrollable time (Rain&slip) 3.23 hours/day - HD785 OB 61 68
Average Eff. Hours 16.58 hours/day - ARTICULATE 12 14
UoA 70% - HD785 COAL 10 11
Total 111 133
1. OB & INPIT TOP SOIL (EQUIPMENT CAPACITY)
ITEM LOADER PRODUCTION (kBCM)
NO C/N PA (% ) UA ( % ) PROD'TY WEEK # 01 WEEK # 02 WEEK #03 WEEK #04 WEEK # 05 WEEK#06 Total
W'hours Volume W'hours Volume W'Hours Volume W'Hours Volume W'Hours Volume W'Hours Volume W'Hours Volume
1 SH4001 92.00% 69.8% 1,800 47.23 85.01 111.65 200.98 111.65 200.98 111.65 200.98 95.55 171.99 - - 477.7 859.93
2 SH4002 92.00% 69.8% 1,800 47.23 85.01 111.65 200.98 111.65 200.98 111.65 200.98 95.55 171.99 - - 477.7 859.93
3 SH304 0.00% - - - - - - - - - - - - - -
4 SH305 90.00% 66.6% 1,350 45.79 61.81 107.88 145.63 107.88 145.63 107.88 145.63 76.83 103.72 - - 446.2 602.44
5 SH306 90.00% 69.0% 1,350 45.79 61.81 107.88 145.63 107.88 145.63 107.88 145.63 92.35 124.68 - - 461.8 623.39
6 EX708 0.00% - - - - - - - - - - - - - -
7 EX709 91.00% 66.6% 950 46.30 43.98 109.08 103.62 109.08 103.62 109.08 103.62 77.69 73.80 - - 451.2 428.65
8 EX710 0.00% - - - - - - - - - - - - - -
9 EX711 91.00% 69.8% 950 46.72 44.38 110.44 104.92 110.44 104.92 110.44 104.92 94.51 89.78 - - 472.5 448.92
10 EX1001 92.00% 69.0% 500 46.81 23.40 110.27 55.14 110.27 55.14 110.27 55.14 94.41 47.20 - - 472.0 236.02
11 EX1006 0.00% - - - - - - - - - - - - - -
12 EX1008 0.00% - - - - - - - - - - - - - -
13 EX1013 92.00% 69.0% 500 46.81 23.40 110.27 55.14 110.27 55.14 110.27 55.14 94.41 47.20 - - 472.0 236.02
14 EX1014 92.00% 69.0% 500 46.81 23.40 110.27 55.14 110.27 55.14 110.27 55.14 94.41 47.20 - - 472.0 236.02

-
Total 452.22 1,067.17 1,067.17 1,067.17 877.57 - 4,531.31

2. IN WASTE DUMP TOP SOIL


ITEM LOADER PRODUCTION (kBCM)
NO C/N PA (% ) UA ( % ) PROD'ITY WEEK # 01 WEEK # 02 WEEK #03 WEEK #04 WEEK # 05 WEEK#06 Total
W'Hours Volume W'Hours Volume W'Hours Volume W'Hours Volume W'Hours Volume W'Hours Volume W'Hours Volume
1 EX577 92.00% 66.6% 300 46.81 14.04 110.27 33.08 110.27 33.08 110.27 33.08 78.54 23.56 - - 456.17 136.85
2 EX578 92.00% 66.6% 300 46.81 14.04 110.27 33.08 110.27 33.08 110.27 33.08 78.54 23.56 - - 456.17 136.85
3

Total 28.08 66.16 66.16 66.16 47.12 - 273.70

TOTAL WASTE 4,805.01


-

3. COAL MINE (EQUIPMENT CAPACITY)


ITEM LOADER PRODUCTION (kton)
NO C/N PA (% ) UA ( % ) PROD'ITY WEEK # 01 WEEK # 02 WEEK #03 WEEK #04 WEEK # 05 WEEK#06 Total
W'Hours Volume W'Hours Volume W'Hours Volume W'Hours Volume W'Hours Volume W'Hours Volume W'Hours Volume
1 EX1002 92.00% 67% 500 46.81 23.40 110.27 55.14 110.27 55.14 110.27 55.14 78.54 39.27 - - 456.17 228.08
2 EX1014 0.00% #DIV/0! 500 46.81 23.40 110.27 55.14 110.27 55.14 110.27 55.14 78.54 39.27 - - 456.17 228.08
3
4
Total 46.81 110.27 110.27 110.27 78.54 - 456.17

Note
TARGET TOTAL FOR WASTE 4,805.01 Kbcm
TARGET TOTAL FOR COAL 456.17 Kton
TARGET RAIN, SLIPPERY & Foggy 100.00 Hour's/month
Day Shift & night shift on 25th & 31th off

WEEK # 01 1-Dec-06 up to 3-Dec-06


WEEK # 02 4-Dec-06 up to 10-Dec-06
WEEK #03 11-Dec-06 up to 17-Dec-06
WEEK #04 18-Dec-06 up to 24-Dec-06
WEEK # 05 25-Dec-06 up to 1-Jan-07
WEEK#06 1-Jan-07 1-Jan-07 up to 2-Jan-07

Honorius L Sihaloho Budiawan Hotben .S Sulasman Rahmad Pudjotomo


Engineering Dept Head Production Dept head Mining Service Dept head Plant Dept Head Project Manager

Agus Djundiarto Fany E P. Basuki RB Ahmad Yani Fikri Pieter du Toit


SHE Dept Head Log. Dept Head HRGA Dept Head FA Dept Head Dep. Project Manager

//17009/376633201.xls / MONTHLY / 01/15/2018


DAFTAR HADIR RAPAT
Tanggal : 2006
Agenda : MONTHLY PLAN MEETING

No. Nama Dept Tanda tangan

10

11

12

13

14

15

16

17

18

19

20