DCL-CCECC PROJECT : RAILWAY OVERBRIDGE AT JURAIN.

PAGE :
PRIODEEP
BANGLADESH ARMY
JV CLIENT :
JOB NO. : DATE : 14.06.2017
DESIGN BY :
REVIEW BY : C.K.MANDAL
STRUCTURAL DESIGN OF BORED CAST IN-SITU R.C.C PILE

INPUT DATA & DESIGN SUMMARY


CONCRETE STRENGTH fc' = 3 ksi
REBAR YIELD STRESS fy = 60 ksi
e
COLUMN DIAMETER D = 47.23 in
FACTORED AXIAL LOAD Pu = 882 k
FACTORED MAGNIFIED MOMENT Mu = 400 ft-k
FACTORED SHEAR LOAD Vu = 100 k
PILE VERT. REINF. 24 # 8 e
PILE SPIRAL REINF. # 3 @ 3 in o.c.

ANALYSIS (
2 0.85 f C' ) '
e o === , E c 57 f C , Es 29000ksi
3500 Ec
ì éù æöe æöe c
2

ï c
ï0.85 f C êú2 ç÷
'
3000 -<<
ç÷ , for 0 eec o
fC=í ëû èøe o
êú èøe o
2500
ï '
î0.85 f C , for eec ³ o
ï

2000 ïeee
ì s E s , for s£ y
f Pn (k) fS=í
ï f , for ees > y
1500 î y
f Pn (kips) f Mn (ft-kips)
1000 AT AXIAL LOAD ONLY 3150 0
AT MAXIMUM LOAD 3150 714
500 AT 0 % TENSION 2913 1006
AT 25 % TENSION 2466 1460
0
0 500 1000 1500 2000 2500 AT 50 % TENSION 2076 1722
AT e t = 0.002 1499 1926
f Mn (ft-k) AT BALANCED CONDITION 1482 1957
AT e t = 0.005 800 2132
AT FLEXURE ONLY 0 1289
CHECK FLEXURAL & AXIAL CAPACITY
f Pmax =0.85 f [ 0.85 fc' (Ag - Ast) + fy Ast] = 3150 kips., (at max axial load, ACI 318-02, Sec. 10.3.6.1)
where f = 0.70 (ACI 318-02, Sec.9.3.2.2) > Pu [Satisfactory]
2 2
Ag = 1752 in . Ast = 14.40 in .
a = Cbb1 = 23 in (at balanced strain condition, ACI 10.3.2)
f = 0.57 + 67 et = 0.709 (ACI 318-02, Fig. R9.3.2)

where Cb = d ec / (ec + es) = 27 in et = 0.002069 ec = 0.003


d = 44.9 in, (ACI 7.7.1) b1 = 0.85 ( ACI 318-02, Sec. 10.2.7.3 )

f Mn = 0.9 Mn = 1289 ft-kips @ Pn = 0, (ACI 318-02, Sec. 9.3.2) ,& et,min = 0.004, (ACI 318-02, Sec. 10.3.5)
f Mn = 2111 ft-kips @ Pu = 882 kips > Mu [Satisfactory]
rmax = 0.01 (ACI 318-02, Section 10.9) rprovd = 0.008
rmin = 0.008(ACI 318-02, Section 10.9)

CHECK SHEAR CAPACITY


f Vn = f (Vs + Vc) = 229 kips, (ACI 318-02 Sec. 11.1.1)
> Vu [Satisfactory]
where f = 0.75 (ACI 318-02 Sec. 9.3.2.3)
2 2
A0 = 1585 in . Av = 0.22 in . fy = 40 ksi
Vc = 2 (fc')0.5A0 = 173.6 kips, (ACI 318-02 Sec. 11.3.1)
Vs = MIN (d fy Av / s , 4Vc) = 131.8 kips, (ACI 318-02 Sec. 11.5.6.2)
smax = 3 (ACI 318-02, Section 7.10.4.3) sprovd = 3 in
smin = 1 (ACI 318-02, Section 7.10.4.3) [Satisfactory]