REQUEST FOR INFORMATION

JMC

Project: Huawei R& D Campus RFI No: RFI-HTPL/JMC/SYN/CIV- 058

Reinforcement Steel – Chairs & Spacers measurement


Ref: Drawing No – HUA – TYP – 00 – 02 - MD

The preambles of Contract (P/10, Volume – 2 of Contract agreement) specify that the rates for
reinforcement are to include for:
(a) Allowances for rolling margin and the weights of welds
(b) Cleaning, cutting, bending, fabricating, placing, ting and the provision of all necessary distance
blocks, tying wire, non designed spacers or chairs, temporary fixings and supports.
(c) Extra material at laps of fabric reinforcement and for welding and notching around obstructions.
(d) Wastage of materials

As per the Typical notes details mentioned in above reference, the requirement of spacers, chairs have
been provided under point nos – 5 & 6 of Reinforcement section.

Accordingly, we are providing the chairs & spacers. Hence these items are to be measured for payment.

JVH Sudhakar
Signature Date: 03.10.2011

RFI submitted by JMC Projects vide Transmittal TR-HTIPL/JMC/SYN/CIV- 218, dated 27th Sep 2011

Please reply on or before: 08th October 2011

To: Synergy (for forwarding where applicable)


................................................ ………………………………
Prakash, S
PM - Synergy Date

RESPONSE (via Synergy)

...................................................... ................................................ ................................................ …………………………..


DLS Name Signature Date

Synergy Property Development


................................................ ......................................
Signature Date

HUAWEI

………………………………. …………………………..

For Huawei Signature Date