MINISTRY OF FINANCEEASTERN CAR PARK

PROJECT - MINISTRIES COMPLEX

REQUEST FOR INFORMATION (RFI)


Contract No: 15871 Project: Construction, Installation and Maintenance
of Eastern Car Park – Ministries Complex

RFI No: 003 Date: 15/10/2016

To: Gulf Consultant ( RE)

DISCIPLINE: Architecture, Civil


REFERENCE:
SPECIFICATION:
DRAWING: (.p.2c.100AD1& A.P2C.100.0) door &hardware schedule (attached)
Location / Zone: Basement-3-P2C

Information Requested: A conflict between Architectural, Structural drawings and door schedule for doors
opening dimensions
Location Structural & ARCHI dwg. Doors schedule type 1.5
S.p.2c.100AD1& A.P2C.100.0
Air Lock 971W X 1470H 1170W x 2270H

Reason Requested: ………Missing Information

…15 / 10 /2016………Eng. Mahmoud Osman Dawod …………………………………..


RFI DATE REQUESTED BY CONTRACTOR’S AUTHORISED REP.

RESPONSE TO CONTRACTOR

From: To:
Of: Of:
Information Requested: …………………………………………………………………………………
………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………

……………………………… ……………… …………………………………. ……………..


SUPERVISION ENGINEER DATE PROJECT MANAGER DATE

NOTE: This is not a variation document. If the CONTRACTOR considers any part of this response a variation to its cost or
time of performance, the CONTRACTOR is required to give notice in accordance with the terms of the General Conditions of
Contract.