PROJECT : AL HAMAD COMMERCIAL CENTER
DEVELOPER: ALMUTAWIR
CONTRACTOR'S DAILY CONSTRUCTION REPORT
Nowies)
owe)
roa
PMCM Eis eR We:
CONSULTANT : GUL CONSULT
CONTRACT: AL HAMAD COMMERCIAL CENTER DATE TAT
CONTRACTOR :Combined Group Co,
pay Thursday
(Capra aeoeee ee] ep] Ce) ey CT]
oOo mo ag ogo om o
Coa
Punois)
Cea TTT
ues)
ETE)
Saaaa Ra Tee] aaa omy] eae
a Tp
cana isco)
e
tae Sarge] Tammy Aaa = a oi
eee ee eters tere
ls Tyo
a 7 =
fi x z
Std Lear eae TF Toe
ccautn| Pied [Osea Pome] SHB] Uy agagy || Seeman | Sor mia | STAT
soaee | hanoge | Ener Tiger | trgmerprng) | ESPmE
bod hada ‘Cecarsnation | avantty Sur Planning Engineer jeneral Foreman Foreman
ciate | ee [SRE [Bie sore] Pannen Eener | Ger ro
Real 2 : o z z
[O°SuPstOn | Blum. & FF Foreman | Electical Foreman] Safety Foreman Mache Opry
ae a SRS Te SSG) aT TOS cn ae
at ace ae mt Bea a | eae
No. on St 1 12
aT = Same | — a Se ra Sa ae
aca ef Senda | Us | et | Ura
No. on Sita] I 1d
a aera aay
Sea | Da as [Used sitet oaths] | same] a
Eas z
Tone
7 uz
Taal wanowerl 33
STARE We Have
‘are satlefactory with
to safety precautions
Projecs
(Page 1 of2)
clad Whe WOM, WOTKING S70, PICERGUTES and Practices and Wave ToUnd The TATGwTng Warns
Form No. 091AL HAMAD COMMERCIAL CENTER
[CONTRACTOR'S DAILY CONSTRUCTION REPORT
(CPM Aci No.
Description & Lecation of Workin Progress
DCR No 19
Material Delivered to Site
watenal Submital | aret | MSDS Description Quantity Units [origivManufacturer
‘Work in Progress
Dats
‘StantediComploted
lary oF % Completion]
Tall excavation to expose the existing foundation for Cemetery boundary wall
size 75cm projected outside the boundary wall 120cm x 40cm depth.
Hal trenches
ine prcect riot
avation ongoing fo determine underground servic
beside the comer roads of
Remarks
Slonature RE.
Date
Distribtion
co. AMutawie
Projacs
esis
(Page 2082)
Received by Contractor
Date
Frm No, 001)