MINISTRY OF FINANCEEASTERN CAR PARK

PROJECT - MINISTRIES COMPLEX

REQUEST FOR INFORMATION (RFI)


Contract No: 15871 Project: Construction, Installation and Maintenance
of Eastern Car Park – Ministries Complex

RFI No: 039 Date: 29/05/2018

To: Consultant - Gulf Consult (RE)

DISCIPLINE: Architecture , Civil


REFERENCE:
SPECIFICATION:
DRAWING: AG.714.AD1

Location / Zone: From the 2nd Floor to the 5th Floor

Information Requested:

The curtain wall type 37 in the aluminum schedule at the contract drawing( ref. ADD1 AG.14) and the building
section (ref.# ADD1 AG.210) is shown with vision glass type 1 and the transoms levels are not matching with the
sides curtain wall 35 , 36 transoms levels neither the floor levels

Thus, transoms levels need to be adjusted and spandrel glazing will be required at the concrete beams levels

Please advise and confirm

Reason Requested ………Coordination

…29/ 05 /2018……… Eng. Mahmoud Osman Dawod …………………………………..


RFI DATE REQUESTED BY CONTRACTOR’S AUTHORISED REP.

RESPONSE TO CONTRACTOR

From: To:
Of: Of:
Information Requested: …………………………………………………………………………………
………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………

……………………………… ……………… …………………………………. ……………..


SUPERVISION ENGINEER DATE PROJECT MANAGER DATE

NOTE: This is not a variation document. If the CONTRACTOR considers any part of this response a variation to its cost or
time of performance, the CONTRACTOR is required to give notice in accordance with the terms of the General Conditions of
Contract.

Copies to: □ Contractor □ Supervision Consultant □ CM □ MOF