You are on page 1of 3

HSE REPORT

WURC

MONTH OF MAY
MONTH MAY Date: 13/05/2023 TO 18/05/2023
Project Al Hamad Commercial Center/ GC-10957
Prepared by NIKHIL GOVIND

1. HEALTH, SAFETY AND ENVIRONMENT REPORT

THIS
MONTH(13/
S.no SUBJECT TOTAL
05/2023 to
18/05/2023)
1 Near Miss Incidents (NM) 00 01

2 First Aid Case (FAC) 00 02

3 Medical Treatment Case (MTC) Nil Nil

4 Lost Time Injury (LTI) Nil Nil

5 Fatality Nil Nil

6 Total Recordable Injuries (TRI) Nil Nil

7 Motor Vehicle Accident (MVA) Nil Nil

8 Material Damage (MD) 00 01

9 Environmental Damage (ED) Nil Nil

10 Unwanted Occurrences (UO) Nil Nil

11 No. of Fire Incidents Nil Nil

12 Total No of Employees received Induction 07 90

13 Total No of HSE Toolbox 23


02

14 HSE Training conducted 02 30

15 Emergency drills conducted 00 01

16 Safety Violation (SV) 01 01

17 Safety Audit (SA) 00 01

1
HSE REPORT
WURC

2. INCIDENTS/ ACCIDENTS

Type of accident /
Description of accident / incident
incident

Nil Nil

3. ENVIRONMENT:

• Housekeeping conducted on a regular basis

• Proper area management maintained.

4. TRAINING / TOOL BOX MEETING

S.NO DATE TOPIC

2 14/05/2023 EXCAVATION

3 15/05/2023 WORK AT HEIGHT

4 16/05/2023 PPE

5 17/05/2023 HOUSE KEEPING

2
HSE REPORT
WURC

HSE TRAININGS/ TOOL BOX MEETINGS

You might also like