WURC HSE BI-WEEKLY REPORT

MONTH OF MAY
MONTH MAY Date: 16/05/2023 TO 31/05/2023
Project Al Hamad Commercial Center
Prepared by NIKHIL GOVIND
Reviewed by YASSER MOKTHAR ABOUBAKER

1. OVERVIEW OF RESOURCE

S.NO DESCRIPTION MAN DAY

1 MANAGEMENT 02
2 CONSTRUCTION 97
3 HSE 02
TOTAL 101

2. MAN-HOURS SPENT ON SITE

S.no SUBJECT LAST WEEKS BIWEEKLY(16TO Cumulative


31)
1 Avg. No. of men/day
81 101 91
2 Total man-power
4664 1518 6182
3 Total man-hours
34044 12144 46188

3. HEALTH, SAFETY AND ENVIRONMENT REPORT

BIWEE
S.no SUBJECT TOTAL
KLY(16
TO 31)
1 Near Miss Incidents (NM) 00 01

2 First Aid Case (FAC) 00 02

3 Medical Treatment Case (MTC) Nil Nil

4 Lost Time Injury (LTI) Nil Nil

5 Restricted Work Case (RWC) Nil Nil

6 Fatality Nil Nil


1
WURC HSE BI-WEEKLY REPORT

7 Total Recordable Injuries (TRI) Nil Nil

8 Motor Vehicle Accident (MVA) Nil Nil

9 Total Recordable Injuries Rate (TRIR) Nil Nil

10 Material Damage (MD) 00 01

11 Environmental Damage (ED) Nil Nil

12 Unwanted Occurrences (UO) Nil Nil

13 No. of Fire Incidents Nil Nil

14 Total No of Employees received Induction 10 100

15 Total No of HSE Toolbox 05 27

16 HSE Training conducted 03 32

17 Emergency drills conducted 00 01

18 Safety Violation (SV) 00 01

19 Safety Audit (SA) 00 01

4. INCIDENTS/ ACCIDENTS

Type of accident /
Description of accident / incident
incident

NIL NIL

5. ENVIRONMENT:

• Housekeeping conducted on a regular basis

• Proper area management maintained.

2
WURC HSE BIWEEKLY REPORT

6.

TRAINING / TOOL BOX MEETING

S.NO DATE TOPIC

01 16/05/2023 PPE

02 17/05/2023 HOUSE KEEPING

03 20/05/2023 WORKING SAFELY WITH ABRASIVE WHEELS

04 22/05/2023 LIFTING ACTIVITY

05 24/05/2023 HEAT STRESS

06 25/05/2023 ELECTRICAL SAFETY

07 29/05/2023 HOUSE KEEPING

08 31/05/2023 DUSTY CLIMATE

3
WURC HSE BI-WEEKLY REPORT

HSE TRAININGS/ TOOL BOX MEETINGS

4
WURC HSE BI-WEEKLY REPORT

GOOD PRACTICES

Well ventilated rest area for workers Designated smoking area for workers

Assembly point for the site near to gate no:03


Assembly point for the site near to gate no:01

Waste collection point with full precaution against fire Waste collection point with full precaution against fire
hazard near to gate no:03 hazard near to gate no:01