MINISTRY OF FINANCEEASTERN CAR PARK

PROJECT - MINISTRIES COMPLEX

REQUEST FOR INFORMATION (RFI)


Contract No: 15871 Project: Construction, Installation and Maintenance
of Eastern Car Park – Ministries Complex

RFI No: 044 Date: 11/07/2018

To: Consultant - Gulf Consult (RE)

DISCIPLINE: STRUCTURE
REFERENCE:
SPECIFICATION: 09660 - Floors
DRAWING:

Location / Zone: All Zones

Information Requested:

Reference to project bill of quantities and the design drawing, shown in BOQ as tread hand finish (Non
Slip Finish) and shown in drawings as non slip groove nosing.
Which type of is required>

Please advice

Reason Requested: Over stressed steel posts presented in the above-mentioned calculation

…11/ 07 /2018……… Eng. Mahmoud Osman Dawod …………………………………..


RFI DATE REQUESTED BY CONTRACTOR’S AUTHORISED REP.

RESPONSE TO CONTRACTOR

From: To:
Of: Of:
Information Requested: …………………………………………………………………………………
………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………

……………………………… ……………… …………………………………. ……………..


SUPERVISION ENGINEER DATE PROJECT MANAGER DATE

NOTE: This is not a variation document. If the CONTRACTOR considers any part of this response a variation to its cost or
time of performance, the CONTRACTOR is required to give notice in accordance with the terms of the General Conditions of
Contract.

Copies to: □ Contractor □ Supervision Consultant □ CM □ MOF